Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Renovation of Sabha Mandap in Syndicate Camp at Dongri Buzurg Mine(MOIL/17-18/ET/441) 16-04-2018 16-05-2018 16-05-2018 16-05-2018 03:30 PM Active View
2. Construction of Store Room for used oil at Dongri Buzurg Mine(MOIL/17-18/ET/286) 16-04-2018 16-05-2018 16-05-2018 16-05-2018 03:30 PM Active View
3. Purchase of Sand for Sand Stowing Plant at Balaghat Mine(MOIL/18-19/ET/17) 16-04-2018 07-05-2018 07-05-2018 07-05-2018 03:30 PM Active View
4. Annual Repair to Camp Quarters at Ukwa Mine.(MOIL/17-18/ET/310) 16-04-2018 23-05-2018 23-05-2018 23-05-2018 03:30 PM Active View
5. Repairing of OTR Tyres (18.00 X 25 and 24.00 X 35) for Dumpers of 35 T and 60 T at Dongri Buzurg Mine.(MOIL/18-19/ET/13) 14-04-2018 01-05-2018 01-05-2018 01-05-2018 03:30 PM Active View
6. Outsourcing of Crushing and Screening Plant Operation for Gumgaon Mine for 12 Months(MOIL/18-19/ET/14) 14-04-2018 04-05-2018 04-05-2018 04-05-2018 03:30 PM Active View
7. Construction/Extension of H.T Panel Room at 33kV Main Substation of Ukwa Mine(MOIL/17-18/ET/491) 13-04-2018 14-05-2018 14-05-2018 14-05-2018 03:30 PM Active View
8. Construction of vehicle parking shed at new workshop near Vertical Shaft at Ukwa Mine.(MOIL/17-18/ET/490) 13-04-2018 14-05-2018 14-05-2018 14-05-2018 03:30 PM Active View
9. Providing and fixing of Paver Block Flooring for infront of Winder House And Cap Lamp Room near Vertical Shaft at Ukwa Mine(MOIL/17-18/ET/309) 13-04-2018 14-05-2018 14-05-2018 14-05-2018 03:30 PM Active View
10. Operation and Maintenance works of Electrical Installations of Establishment at Corporate Office, Nagpur(MOIL/18-19/ET/16) 13-04-2018 27-04-2018 27-04-2018 27-04-2018 03:30 PM Active View
11. Construction of Compound Wall at new workshop premises at Ukwa Mine(MOIL/17-18/ET/487) 11-04-2018 10-05-2018 10-05-2018 10-05-2018 03:30 PM Active View
12. Notice Inviting Tender for Drilling of Borehole for Sand Stowing Plant and underground works(Surface to First Level) at near Vertical Shaft Ukwa Mine( MOIL/17-18/ET/486) 11-04-2018 10-05-2018 10-05-2018 10-05-2018 03:30 PM Active View
13. Construction of Sand Stowing Plant Bunker at First Vertical Shaft Ukwa Mine(MOIL/17-18/ET/489) 11-04-2018 10-05-2018 10-05-2018 10-05-2018 03:30 PM Active View
14. Construction of new sample room near Mine Store at Ukwa Mine(MOIL/17-18/ET/492) 11-04-2018 10-05-2018 10-05-2018 10-05-2018 03:30 PM Active View
15. Providing and laying epoxy flooring to Store Building at Gumgaon Mine(MOIL/17-18/ET/283) 11-04-2018 10-05-2018 10-05-2018 10-05-2018 03:30 PM Active View
16. Annual Plumbing and Sanitary items for Officers and Staff Quarters at Balaghat( Civil/BGT/T.E./2018-19/101) 06-04-2018 12-04-2018 12-04-2018 12-04-2018 04:30 PM Active View
17. Repairing of approach stone Pitching stair from 6 th Level Pit Top up to Production Shaft Balaghat Mine.(Civil/BGT/T.E./2018-19/99) 06-04-2018 16-04-2018 16-04-2018 16-04-2018 04:30 PM Active View
18. Cleaning of Inner sides of centralized Air Cooling Duct by robot and sterilization by Ozone generator at MOIL Bhawan, Nagpur.(MOIL/17-18/ET/495) 06-04-2018 23-04-2018 23-04-2018 23-04-2018 03:30 PM Active View
19. PURCHASE OF PULMONARY FUNCTION TESTS MACHINES -3 NOS(PUR-MOIL-C-10-35-E-85 dt.5-4-2018) 05-04-2018 20-04-2018 20-04-2018 20-04-2018 03:30 PM Active View
20. Providing, Supplying, installation and commissioning of DC drive with PLC system for production shaft winder at Balaghat Mine for Enhancement of Skip hoisting capacity(MOIL/17-18/ET/465) 04-04-2018 16-04-2018 16-04-2018 16-04-2018 03:30 PM Active View
21. RECASTING OF 6 NOS. CONTACT CLAMP OF FERRO MANGANESE PLANT(TE/MOIL/BGT/FMP/ELECT/18-19/08 Date 03.04.18) 04-04-2018 07-05-2018 07-05-2018 07-05-2018 04:30 PM Active View
22. ANNUAL OPERATION AND MAINTENANCE CONTRACT OF HEMM FOR THE PERIOD OF TWO YEARS AT DONGRI BUZURG MINE(MOIL/17-18/ET/484) 03-04-2018 18-04-2018 18-04-2018 18-04-2018 03:30 PM Active View
23. Providing Furniture and Interior works for proposed chamber of Director (H.R) on first floor of MOIL Bhawan Nagpur.(MOIL/17-18/ET/ 497) 29-03-2018 10-04-2018 10-04-2018 10-04-2018 03:30 PM Active View
24. Creation of Facilities under R and D for Production of Manganese Dioxide at Dongri Buzurg Mine(MOIL/18-19/ET/15) 29-03-2018 17-04-2018 17-04-2018 17-04-2018 03:30 PM Active View
25. TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF STAIN BAR FOR CHIKLA MINE AS PER ANNEXURE A ENCLOSED(TE-641 DT.27032018) 27-03-2018 10-04-2018 10-04-2018 10-04-2018 04:30 PM Active View
26. TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF STRATA MONITORING INSTRUMENT MPBX FOR CHIKLA MINE AS PER ANNEXURE A ENCLOSED(TE-640 DT.27032018) 27-03-2018 10-04-2018 10-04-2018 10-04-2018 04:30 PM Active View
27. WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/126/E-81/1309-M Dt. 27-03-2018) 27-03-2018 18-04-2018 18-04-2018 18-04-2018 03:30 PM Active View
28. WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF CONTACT SHOE -1 SET(PUR/MOIL/C-11/144/E-80/1291-M Dt. 27-03-2018) 27-03-2018 27-04-2018 27-04-2018 27-04-2018 03:30 PM Active View
29. Picking and collection of material from contaminated low grade ROM near Western side of Fagni Dump at Dongri Buzurg Mine(MOIL/18-19/ET/10) 27-03-2018 27-04-2018 27-04-2018 27-04-2018 03:30 PM Active View
30. Underground horizontal and vertical development at -200 ft L and -300 ft L at Gumgaon Mine(MOIL/18-19/ET/9) 27-03-2018 27-04-2018 27-04-2018 27-04-2018 03:30 PM Active View
31. Application of New Austrian tunneling method and Norwegian method of tunneling system for underground drift in Munsar Mine of MOIL limited under RandD with SRCoEM Nagpur(MUN/CIVIL/17-18/89 DT 24.03.2018) 24-03-2018 31-03-2018 31-03-2018 31-03-2018 04:30 PM Active View
32. Underground development of ore drive at 13.5th Level North Section at Balaghat Mine(MOIL/18-19/ET/05) 23-03-2018 23-04-2018 23-04-2018 23-04-2018 03:30 PM Active View
33. Underground development at 12th Level (South Section) at Balaghat Mine( MOIL/18-19/ET/7) 23-03-2018 23-04-2018 23-04-2018 23-04-2018 03:30 PM Active View
34. Trench cutting in ore stack at Chikla Mine(MOIL/18-19/ET/8) 23-03-2018 23-04-2018 23-04-2018 23-04-2018 03:30 PM Active View
35. Underground development at 13.5th Level South Section at Balaghat Mine(MOIL/18-19/ET/06) 23-03-2018 23-04-2018 23-04-2018 23-04-2018 03:30 PM Active View
36. PURCHASE OF GODREJ MAKE CHAIR, MODEL - LEOMA - 1 NO. FOR HEAD OFFICE, NAGPUR (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/54/E-83/1354-M DT.22/03/2018) 22-03-2018 28-03-2018 28-03-2018 28-03-2018 03:30 PM Active View
37. Loading, Transport and unloading of granulated slag from MEL Chandrapur to Balaghat Mine.(BGT/Mining/Sand Stowing/TE/17-18/8118 Date 18.03.1) 22-03-2018 28-03-2018 28-03-2018 28-03-2018 04:30 PM Active View
38. PURCHASE OF LABORATORY CHEMICALS(PUR/MOIL/C-3/43/E-82/1326-M DT.20.03.2018) 20-03-2018 11-04-2018 11-04-2018 11-04-2018 03:30 PM Active View
39. Picking and collection of material from 5 No. Dump at Sitapatore Mine(MOIL/17-18/ET/02) 20-03-2018 20-04-2018 20-04-2018 20-04-2018 03:30 PM Active View
40. Washing picking and collection of material from west side of D dump waste dump at Tirodi Mine(MOIL/18-19/ET/03) 20-03-2018 20-04-2018 20-04-2018 20-04-2018 03:30 PM Active View
41. Pushing of tubs in underground at Chikla Mine(MOIL/18-19/ET/1) 20-03-2018 20-04-2018 20-04-2018 20-04-2018 03:30 PM Active View
42. Loading unloading and transportation of Hutch by mechanical means from Hutch slim Pond Jigg Drain Jigg Pond and other area of dump to the siding at Balaghat Mine(MOIL/18-19/ET/04) 20-03-2018 20-04-2018 20-04-2018 20-04-2018 03:30 PM Active View
43. PURCHASE OF COLD VULCANIZING SOLUTION AND HARDNER FOR JOINTING OF CONVEYOR BELTS AT BALAGHAT MINE(PUR/MOIL/BGT/IMB/17-18/625 dtd 17.03.2018) 19-03-2018 28-03-2018 28-03-2018 28-03-2018 04:30 PM Active View
44. Collecting and loading of fines at Chikla Mine.(TE/CH/Civil/17-18/5363 dated 15/03/2018) 19-03-2018 22-03-2018 22-03-2018 22-03-2018 03:30 PM Active View
45. Tender for Undertaking Annual maintenance of Air-Conditioners, Aqua Guard Water Purifiers, Water Coolers , Repair and maintenance of Air Coolers of MOIL LIMITED at Nagpur(MOIL/PERS/2017-18/1) 17-03-2018 26-03-2018 26-03-2018 26-03-2018 03:30 PM Active View
46. TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF STRATA MONITORING INSTRUMENT MPBX FOR KANDRI MINE AS PER ANNEXURE A ENCLOSED(A-II/KAN/MIN/17-18/669) 17-03-2018 03-04-2018 03-04-2018 03-04-2018 04:30 PM Active View
47. Purchase of Traction Batteries - 12 Sets (WE-73 DT.13.03.2018(e-Tender No.MOIL/17-18/ET/488)) 14-03-2018 06-04-2018 06-04-2018 06-04-2018 3:30 PM Active View
48. Purchase of Diamond Drill Accessories (WE-77 DT.14.03.2018 (e-TenderNO.MOIL/17-18/et/494)) 14-03-2018 20-04-2018 20-04-2018 20-04-2018 3:30 PM Active View
49. Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine(16/Civil/UM/17-18/2578) 10-03-2018 22-03-2018 22-03-2018 22-03-2018 04:30 PM Active View
50. Cleaning of surplus underground ROM at Munsar Mine(MOIL/17-18/ET/480) 09-03-2018 09-04-2018 09-04-2018 09-04-2018 03:30 PM Active View
51. Underground drivage for Loco Battery charging station at 1750 Level at Ukwa Mine(MOIL/17-18/ET/481) 09-03-2018 09-04-2018 09-04-2018 09-04-2018 03:30 PM Active View
52. Removal of waste rock in the H W benches from Ch.39 to Ch.50 and handling the same by mechanized means at Dongri Buzurg Mine( MOIL/17-18/ET/482) 09-03-2018 18-04-2018 18-04-2018 18-04-2018 03:30 PM Active View
53. Supply of Horizontal Pump(AGT/BGT/MECH/PUMP/17-18/7784) 08-03-2018 13-03-2018 13-03-2018 13-03-2018 04:00 PM Active View
54. Underground concreting and Extra excavation in magnifereous rock 1850 level at Ukwa Mine(MOIL/17-18/ET/476) 07-03-2018 06-04-2018 06-04-2018 06-04-2018 03:30 PM Active View
55. Recovery of Ferro grade TD 4505 and SM grade ore TDL 439 and TDL 499 from North Magazine dump at Tirodi Mine(MOIL/17-18/ET/477) 07-03-2018 06-04-2018 06-04-2018 06-04-2018 03:30 PM Active View
56. Replacement of smoke tubes Bed coil tubes Chemical cleaning of boiler Radiography and Ultrasonic testing of FBC Boiler and passing of Boiler at EMD Plant, Dongri Buzurg Mine(MOIL/17-18/ET/483) 07-03-2018 05-04-2018 05-04-2018 05-04-2018 03:30 PM Active View
57. Purchase of Sand for Underground concreting work at Ukwa Mine(MOIL/17-18/ET/479) 07-03-2018 06-04-2018 06-04-2018 06-04-2018 03:30 PM Active View
58. Relining and repairing of 10 Nos of Electrolytic cell tanks of EMD Plant, Dongri Buzurg Mine(MOIL/17-18/ET/478) 07-03-2018 13-04-2018 13-04-2018 13-04-2018 03:30 PM Active View
59. WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SWAM MAKE AIR FILTER ELEMENT(PUR/MOIL/C-11/151/E-78/1242-M Dt. 06-03-2018) 06-03-2018 28-03-2018 28-03-2018 28-03-2018 03:30 PM Active View
60. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PARKER MAKE SINGLE SOLENOID VALVE(PUR/MOIL/C-11/131/E-77/1224-M Dt. 06-03-2018) 06-03-2018 28-03-2018 28-03-2018 28-03-2018 03:30 PM Active View
61. WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF FILTER BAGS FOR AIR POLLUTION CONTROL UNIT(PUR/MOIL/C-11/125/E-76/1215-M Dt. 06-03-2018) 06-03-2018 06-04-2018 06-04-2018 06-04-2018 03:30 PM Active View
62. Blanket Rate Contract for supply of various all types and sizes of Bearings, Sleeves with Nuts, C.I. Pedestals Etc.(WE-202 DT.06.03.2018(e-Tender no.MOIL/17-18/ET/485) 06-03-2018 12-04-2018 12-04-2018 12-04-2018 03:30 PM Active View
63. Design and detailed Plant-in-charge ing supply erection commissioning and testing of rotary kiln including all accessories for Mn ore reduction at EMD Plant, Dongri Buzurg Mine(MOIL/17-18/ET/463) 06-03-2018 13-04-2018 13-04-2018 13-04-2018 03:30 PM Active View
64. Recovery of SM Grd. BGL-462 25 Percent Mn content ore from old dump material at Balaghat Mine( MOIL/17-18/ET/475) 05-03-2018 15-03-2018 15-03-2018 15-03-2018 03:30 PM Active View
65. Supplying, providing, erection,installation and commissioning of Street light, from Main Gate to First Vertical Shaft of Ukwa Mine(MOIL/17-18/ET/469) 05-03-2018 23-03-2018 23-03-2018 23-03-2018 03:30 PM Active View
66. PURCHASE OF FLEXIBLE TRAILING CABLE 1.1 KV , 5CX 25 SqMM FOR CHIKLA MINE(PUR/MOIL/CH/ELECT/309) 01-03-2018 14-03-2018 14-03-2018 14-03-2018 03:30 PM Active View
67. Enhancement of hoisting capacity by replacing existing individual skips and cages assemblies by single Cage cum Skip Assemblies and other modifications in winding system of Production Shaft at Balaghat Mine(MOIL/17-18/ET/464) 01-03-2018 06-04-2018 06-04-2018 06-04-2018 01:30 PM Active View
68. Maintenance of all Gardens at Premises of MOIL Nagpur(MOIL/17-18/ET/437) 28-02-2018 09-03-2018 09-03-2018 09-03-2018 03:30 PM Active View
69. Excavation For Reclaiming the Site For Proposed Construction of DAV Moil Public School at Munsar Under CSR(MOIL/17-18/ET/ 474) 28-02-2018 13-03-2018 13-03-2018 13-03-2018 03:30 PM Active View
70. Pattern making, casting,Machining and dynamic balancing of Pumps Spares for 220 HP Mather and Platt make Multi stage Pump of 6th Level Underground of Balaghat Mine(AGT/BGT/MECH/PUMP/17-18/605 dtd 26.02.2018) 27-02-2018 13-03-2018 13-03-2018 13-03-2018 04:30 PM Active View
71. Annual Maintenance contract for repairs and rewiring of electrical installations at residential quarters and office buildings at Balaghat Mine(MOIL/17-18/ET/462) 27-02-2018 16-03-2018 16-03-2018 16-03-2018 03:30 PM Active View
72. Replacement of transfer chute liners, bunker liners and chutes /bunker repair at IMB plant Balaghat mine(AGENT/BGT/MECH/IMBP/17-18/7597 dtd 26.02.2018) 26-02-2018 09-03-2018 09-03-2018 09-03-2018 04:30 PM Active View
73. Work of repair and Maintenance contract for domestic electrical installation of residential and non- residential buildings at Chikla Mine(MOIL/17-18/ET/460) 26-02-2018 15-03-2018 15-03-2018 15-03-2018 03:30 PM Active View
74. Annual Maintenance contract for repairs and rewiring of electrical installations at residential quarters and non- residential buildings at Dongri Buzurg Mine(MOIL/17-18/ET/461) 26-02-2018 15-03-2018 15-03-2018 15-03-2018 03:30 PM Active View
75. Supply of Medicines(WE-198-ET-473-dt-26-02-2018) 26-02-2018 16-04-2018 16-04-2018 16-04-2018 03:30 PM Active View
76. Construction of Toilet Block in Durga Chowk Premises at Chikla Mine (MOIL/17-18/ET/438) 23-02-2018 09-03-2018 09-03-2018 09-03-2018 3:30 PM Active View
77. Construction of GSR for sand stowing plant at Munsar Mine (MOIL/17-18/ET/380) 23-02-2018 09-03-2018 09-03-2018 09-03-2018 3:30 PM Active View
78. Maintenance of Gardens at Ukwa Mine (MOIL/17-18/ET/436) 23-02-2018 09-03-2018 09-03-2018 09-03-2018 03:30 PM Active View
79. Empanelment of Advertising Agencies(MOIL/17-18/ET/400) 22-02-2018 07-03-2018 07-03-2018 07-03-2018 03:30 PM Active View
80. Operation of pumps for drinking water supply in camp area of Beldongri Mine (MOIL/17-18/ET/290) 22-02-2018 09-03-2018 09-03-2018 09-03-2018 03:30 PM Active View
81. Repairs of 700 KW, 11 KV Squirrel Cage Induction Motor of, 4000 CFM Capacity, I.R. Make Air Compressor of Balaghat Mine (MOIL/17-18/ET/468 ) 21-02-2018 06-03-2018 06-03-2018 06-03-2018 03:30 PM Active View
82. Chute concreting at 1750 level for installation of ore Pass Ukwa Mine (16/Mining/UM/17-18/2489) 20-02-2018 06-03-2018 06-03-2018 06-03-2018 04:30 PM Active View
83. Pushing of tubs from SDL face at Gumgaon Mine (MOIL/17-18/ET/471) 20-02-2018 19-03-2018 19-03-2018 19-03-2018 03:30 PM Active View
84. Picking and collection of material from South Staff Quarter waste dump at Tirodi Mine (MOIL/17-18/ET/467) 20-02-2018 19-03-2018 19-03-2018 19-03-2018 03:30 PM Active View
85. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF TEFLON BUSH AND FRP MATERIALS(PUR/MOIL/C-11/119/E-75/1208-M Dt. 16-02-2018) 19-02-2018 12-03-2018 12-03-2018 12-03-2018 03:30 PM Active View
86. Underground Concreting work RCC 200 Level at Gumgaon Mine(MOIL/17-18/ET/459) 16-02-2018 15-03-2018 15-03-2018 15-03-2018 03:30 PM Active View
87. Making and supplying of stemming material Mud plug used for blasting fragmentation in Underground at various working levels at Balaghat Mine(MOIL/17-18/ET/458) 16-02-2018 15-03-2018 15-03-2018 15-03-2018 03:30 PM Active View
88. Loading and unloading of steel sections cement bags and other materials with stacking at Balaghat Mine( MOIL/17-18/ET/457) 16-02-2018 15-03-2018 15-03-2018 15-03-2018 03:30 PM Active View
89. Picking and collection of material from South A dump at Tirodi Mine (MOIL/17-18/ET/454) 15-02-2018 14-03-2018 14-03-2018 14-03-2018 03:30 PM Active View
90. Picking and collection of material to recover LGHS ore TDL 439 and TDL 499 from waste dump West side of D dump at Tirodi Mine (MOIL/17-18/ET/455) 15-02-2018 14-03-2018 14-03-2018 14-03-2018 03:30 PM Active View
91. Cleaning of ROM recovered from Pit No.6 at Sitapatore Mine (MOIL/17-18/ET/456) 15-02-2018 14-03-2018 14-03-2018 14-03-2018 03:30 PM Active View
92. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR GODREJ SULLAIR MAKE COMPRESSOR. (PUR/MOIL/C-5/73/E-66/1075-M Dt. 15/02/2018) 14-02-2018 09-03-2018 09-03-2018 09-03-2018 03:30 PM Active View
93. urchase of Jaw Plates for Sayaji Make Jaw Crushers (WE-225 e-tender No.MOIL/17-18/ET-470, Dt.15.02.18) 14-02-2018 19-03-2018 19-03-2018 19-03-2018 03:30 PM Active View
94. Electrical wiring and fixtures at newly DG house at Munsar Mine (ELECT/MUN/ADGM/17-18/4095 DT 10.02.2018) 12-02-2018 23-02-2018 23-02-2018 23-02-2018 3:30 PM Active View
95. Upgradation of LT Overhead line to 3Phase 3Wire for power supply of Dry Seperation Unit and Magazine (Elect/MUN/ADGM/17-18/4096 DT 10/02/2018) 12-02-2018 26-02-2018 26-02-2018 26-02-2018 3:30 PM Active View
96. ugmentation of 33 KV Outdoor and 11 KV indoor substation of Ukwa Mine (MOIL/17-18/ET/422 ) 10-02-2018 08-03-2018 08-03-2018 08-03-2018 3:30 PM Active View
97. Fabrication of Bearing Plates of Roof Bolts for the year 2017-18 for Balaghat Mine(AGT/BGT/MECH/RB/17-18/561 dtd 05.02.2018) 09-02-2018 20-02-2018 20-02-2018 20-02-2018 04:30 PM Active View
98. Purchase of SPRING STEEL SCREEN PANELS -21 Items(WE-224 e-tender No.MOIL/17-18/ET-466, Dt.09.02.18) 09-02-2018 12-03-2018 12-03-2018 12-03-2018 03:30 PM Active View
99. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF RUBBER HOSE PIPE, TYPE - 3(PUR/MOIL/C-11/117/E-73/1163-M Dt. 07-02-2018) 08-02-2018 28-02-2018 28-02-2018 28-02-2018 03:30 PM Active View
100. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF VALVES(PUR/MOIL/C-11/148/E-74/1173-M Dt. 07-02-2018) 08-02-2018 12-03-2018 12-03-2018 12-03-2018 03:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.