निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Purchase of Sand for Sand Stowing Plant at Balaghat Mine(MOIL/18-19/ET/17) | 16-04-2018 | 07-05-2018 | 07-05-2018 | 07-05-2018 | 03:30 PM | Active | और देखें |
2. | Annual Repair to Camp Quarters at Ukwa Mine.(MOIL/17-18/ET/310) | 16-04-2018 | 23-05-2018 | 23-05-2018 | 23-05-2018 | 03:30 PM | Active | और देखें |
3. | Repairing of OTR Tyres (18.00 X 25 and 24.00 X 35) for Dumpers of 35 T and 60 T at Dongri Buzurg Mine.(MOIL/18-19/ET/13) | 14-04-2018 | 01-05-2018 | 01-05-2018 | 01-05-2018 | 03:30 PM | Active | और देखें |
4. | Outsourcing of Crushing and Screening Plant Operation for Gumgaon Mine for 12 Months(MOIL/18-19/ET/14) | 14-04-2018 | 04-05-2018 | 04-05-2018 | 04-05-2018 | 03:30 PM | Active | और देखें |
5. | Construction/Extension of H.T Panel Room at 33kV Main Substation of Ukwa Mine(MOIL/17-18/ET/491) | 13-04-2018 | 14-05-2018 | 14-05-2018 | 14-05-2018 | 03:30 PM | Active | और देखें |
6. | Construction of vehicle parking shed at new workshop near Vertical Shaft at Ukwa Mine.(MOIL/17-18/ET/490) | 13-04-2018 | 14-05-2018 | 14-05-2018 | 14-05-2018 | 03:30 PM | Active | और देखें |
7. | Providing and fixing of Paver Block Flooring for infront of Winder House And Cap Lamp Room near Vertical Shaft at Ukwa Mine(MOIL/17-18/ET/309) | 13-04-2018 | 14-05-2018 | 14-05-2018 | 14-05-2018 | 03:30 PM | Active | और देखें |
8. | Operation and Maintenance works of Electrical Installations of Establishment at Corporate Office, Nagpur(MOIL/18-19/ET/16) | 13-04-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | और देखें |
9. | Construction of Compound Wall at new workshop premises at Ukwa Mine(MOIL/17-18/ET/487) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | और देखें |
10. | Notice Inviting Tender for Drilling of Borehole for Sand Stowing Plant and underground works(Surface to First Level) at near Vertical Shaft Ukwa Mine( MOIL/17-18/ET/486) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | और देखें |
11. | Construction of Sand Stowing Plant Bunker at First Vertical Shaft Ukwa Mine(MOIL/17-18/ET/489) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | और देखें |
12. | Construction of new sample room near Mine Store at Ukwa Mine(MOIL/17-18/ET/492) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | और देखें |
13. | Providing and laying epoxy flooring to Store Building at Gumgaon Mine(MOIL/17-18/ET/283) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | और देखें |
14. | Annual Plumbing and Sanitary items for Officers and Staff Quarters at Balaghat( Civil/BGT/T.E./2018-19/101) | 06-04-2018 | 12-04-2018 | 12-04-2018 | 12-04-2018 | 04:30 PM | Active | और देखें |
15. | Repairing of approach stone Pitching stair from 6 th Level Pit Top up to Production Shaft Balaghat Mine.(Civil/BGT/T.E./2018-19/99) | 06-04-2018 | 16-04-2018 | 16-04-2018 | 16-04-2018 | 04:30 PM | Active | और देखें |
16. | Cleaning of Inner sides of centralized Air Cooling Duct by robot and sterilization by Ozone generator at MOIL Bhawan, Nagpur.(MOIL/17-18/ET/495) | 06-04-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | और देखें |
17. | PURCHASE OF PULMONARY FUNCTION TESTS MACHINES -3 NOS(PUR-MOIL-C-10-35-E-85 dt.5-4-2018) | 05-04-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 03:30 PM | Active | और देखें |
18. | Providing, Supplying, installation and commissioning of DC drive with PLC system for production shaft winder at Balaghat Mine for Enhancement of Skip hoisting capacity(MOIL/17-18/ET/465) | 04-04-2018 | 16-04-2018 | 16-04-2018 | 16-04-2018 | 03:30 PM | Active | और देखें |
19. | RECASTING OF 6 NOS. CONTACT CLAMP OF FERRO MANGANESE PLANT(TE/MOIL/BGT/FMP/ELECT/18-19/08 Date 03.04.18) | 04-04-2018 | 07-05-2018 | 07-05-2018 | 07-05-2018 | 04:30 PM | Active | और देखें |
20. | ANNUAL OPERATION AND MAINTENANCE CONTRACT OF HEMM FOR THE PERIOD OF TWO YEARS AT DONGRI BUZURG MINE(MOIL/17-18/ET/484) | 03-04-2018 | 18-04-2018 | 18-04-2018 | 18-04-2018 | 03:30 PM | Active | और देखें |
21. | Providing Furniture and Interior works for proposed chamber of Director (H.R) on first floor of MOIL Bhawan Nagpur.(MOIL/17-18/ET/ 497) | 29-03-2018 | 10-04-2018 | 10-04-2018 | 10-04-2018 | 03:30 PM | Active | और देखें |
22. | Creation of Facilities under R and D for Production of Manganese Dioxide at Dongri Buzurg Mine(MOIL/18-19/ET/15) | 29-03-2018 | 17-04-2018 | 17-04-2018 | 17-04-2018 | 03:30 PM | Active | और देखें |
23. | TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF STAIN BAR FOR CHIKLA MINE AS PER ANNEXURE A ENCLOSED(TE-641 DT.27032018) | 27-03-2018 | 10-04-2018 | 10-04-2018 | 10-04-2018 | 04:30 PM | Active | और देखें |
24. | TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF STRATA MONITORING INSTRUMENT MPBX FOR CHIKLA MINE AS PER ANNEXURE A ENCLOSED(TE-640 DT.27032018) | 27-03-2018 | 10-04-2018 | 10-04-2018 | 10-04-2018 | 04:30 PM | Active | और देखें |
25. | WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/126/E-81/1309-M Dt. 27-03-2018) | 27-03-2018 | 18-04-2018 | 18-04-2018 | 18-04-2018 | 03:30 PM | Active | और देखें |
26. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF CONTACT SHOE -1 SET(PUR/MOIL/C-11/144/E-80/1291-M Dt. 27-03-2018) | 27-03-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | और देखें |
27. | Picking and collection of material from contaminated low grade ROM near Western side of Fagni Dump at Dongri Buzurg Mine(MOIL/18-19/ET/10) | 27-03-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | और देखें |
28. | Underground horizontal and vertical development at -200 ft L and -300 ft L at Gumgaon Mine(MOIL/18-19/ET/9) | 27-03-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | और देखें |
29. | Application of New Austrian tunneling method and Norwegian method of tunneling system for underground drift in Munsar Mine of MOIL limited under RandD with SRCoEM Nagpur(MUN/CIVIL/17-18/89 DT 24.03.2018) | 24-03-2018 | 31-03-2018 | 31-03-2018 | 31-03-2018 | 04:30 PM | Active | और देखें |
30. | Underground development of ore drive at 13.5th Level North Section at Balaghat Mine(MOIL/18-19/ET/05) | 23-03-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | और देखें |
31. | Underground development at 12th Level (South Section) at Balaghat Mine( MOIL/18-19/ET/7) | 23-03-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | और देखें |
32. | Trench cutting in ore stack at Chikla Mine(MOIL/18-19/ET/8) | 23-03-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | और देखें |
33. | Underground development at 13.5th Level South Section at Balaghat Mine(MOIL/18-19/ET/06) | 23-03-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | और देखें |
34. | PURCHASE OF GODREJ MAKE CHAIR, MODEL - LEOMA - 1 NO. FOR HEAD OFFICE, NAGPUR (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/54/E-83/1354-M DT.22/03/2018) | 22-03-2018 | 28-03-2018 | 28-03-2018 | 28-03-2018 | 03:30 PM | Active | और देखें |
35. | Loading, Transport and unloading of granulated slag from MEL Chandrapur to Balaghat Mine.(BGT/Mining/Sand Stowing/TE/17-18/8118 Date 18.03.1) | 22-03-2018 | 28-03-2018 | 28-03-2018 | 28-03-2018 | 04:30 PM | Active | और देखें |
36. | PURCHASE OF LABORATORY CHEMICALS(PUR/MOIL/C-3/43/E-82/1326-M DT.20.03.2018) | 20-03-2018 | 11-04-2018 | 11-04-2018 | 11-04-2018 | 03:30 PM | Active | और देखें |
37. | Picking and collection of material from 5 No. Dump at Sitapatore Mine(MOIL/17-18/ET/02) | 20-03-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 03:30 PM | Active | और देखें |
38. | Washing picking and collection of material from west side of D dump waste dump at Tirodi Mine(MOIL/18-19/ET/03) | 20-03-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 03:30 PM | Active | और देखें |
39. | Pushing of tubs in underground at Chikla Mine(MOIL/18-19/ET/1) | 20-03-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 03:30 PM | Active | और देखें |
40. | Loading unloading and transportation of Hutch by mechanical means from Hutch slim Pond Jigg Drain Jigg Pond and other area of dump to the siding at Balaghat Mine(MOIL/18-19/ET/04) | 20-03-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 03:30 PM | Active | और देखें |
41. | PURCHASE OF COLD VULCANIZING SOLUTION AND HARDNER FOR JOINTING OF CONVEYOR BELTS AT BALAGHAT MINE(PUR/MOIL/BGT/IMB/17-18/625 dtd 17.03.2018) | 19-03-2018 | 28-03-2018 | 28-03-2018 | 28-03-2018 | 04:30 PM | Active | और देखें |
42. | Collecting and loading of fines at Chikla Mine.(TE/CH/Civil/17-18/5363 dated 15/03/2018) | 19-03-2018 | 22-03-2018 | 22-03-2018 | 22-03-2018 | 03:30 PM | Active | और देखें |
43. | Tender for Undertaking Annual maintenance of Air-Conditioners, Aqua Guard Water Purifiers, Water Coolers , Repair and maintenance of Air Coolers of MOIL LIMITED at Nagpur(MOIL/PERS/2017-18/1) | 17-03-2018 | 26-03-2018 | 26-03-2018 | 26-03-2018 | 03:30 PM | Active | और देखें |
44. | TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF STRATA MONITORING INSTRUMENT MPBX FOR KANDRI MINE AS PER ANNEXURE A ENCLOSED(A-II/KAN/MIN/17-18/669) | 17-03-2018 | 03-04-2018 | 03-04-2018 | 03-04-2018 | 04:30 PM | Active | और देखें |
45. | Purchase of Traction Batteries - 12 Sets (WE-73 DT.13.03.2018(e-Tender No.MOIL/17-18/ET/488)) | 14-03-2018 | 06-04-2018 | 06-04-2018 | 06-04-2018 | 3:30 PM | Active | और देखें |
46. | Purchase of Diamond Drill Accessories (WE-77 DT.14.03.2018 (e-TenderNO.MOIL/17-18/et/494)) | 14-03-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 3:30 PM | Active | और देखें |
47. | Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine(16/Civil/UM/17-18/2578) | 10-03-2018 | 22-03-2018 | 22-03-2018 | 22-03-2018 | 04:30 PM | Active | और देखें |
48. | Cleaning of surplus underground ROM at Munsar Mine(MOIL/17-18/ET/480) | 09-03-2018 | 09-04-2018 | 09-04-2018 | 09-04-2018 | 03:30 PM | Active | और देखें |
49. | Underground drivage for Loco Battery charging station at 1750 Level at Ukwa Mine(MOIL/17-18/ET/481) | 09-03-2018 | 09-04-2018 | 09-04-2018 | 09-04-2018 | 03:30 PM | Active | और देखें |
50. | Removal of waste rock in the H W benches from Ch.39 to Ch.50 and handling the same by mechanized means at Dongri Buzurg Mine( MOIL/17-18/ET/482) | 09-03-2018 | 18-04-2018 | 18-04-2018 | 18-04-2018 | 03:30 PM | Active | और देखें |
51. | Supply of Horizontal Pump(AGT/BGT/MECH/PUMP/17-18/7784) | 08-03-2018 | 13-03-2018 | 13-03-2018 | 13-03-2018 | 04:00 PM | Active | और देखें |
52. | Underground concreting and Extra excavation in magnifereous rock 1850 level at Ukwa Mine(MOIL/17-18/ET/476) | 07-03-2018 | 06-04-2018 | 06-04-2018 | 06-04-2018 | 03:30 PM | Active | और देखें |
53. | Recovery of Ferro grade TD 4505 and SM grade ore TDL 439 and TDL 499 from North Magazine dump at Tirodi Mine(MOIL/17-18/ET/477) | 07-03-2018 | 06-04-2018 | 06-04-2018 | 06-04-2018 | 03:30 PM | Active | और देखें |
54. | Replacement of smoke tubes Bed coil tubes Chemical cleaning of boiler Radiography and Ultrasonic testing of FBC Boiler and passing of Boiler at EMD Plant, Dongri Buzurg Mine(MOIL/17-18/ET/483) | 07-03-2018 | 05-04-2018 | 05-04-2018 | 05-04-2018 | 03:30 PM | Active | और देखें |
55. | Purchase of Sand for Underground concreting work at Ukwa Mine(MOIL/17-18/ET/479) | 07-03-2018 | 06-04-2018 | 06-04-2018 | 06-04-2018 | 03:30 PM | Active | और देखें |
56. | Relining and repairing of 10 Nos of Electrolytic cell tanks of EMD Plant, Dongri Buzurg Mine(MOIL/17-18/ET/478) | 07-03-2018 | 13-04-2018 | 13-04-2018 | 13-04-2018 | 03:30 PM | Active | और देखें |
57. | WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SWAM MAKE AIR FILTER ELEMENT(PUR/MOIL/C-11/151/E-78/1242-M Dt. 06-03-2018) | 06-03-2018 | 28-03-2018 | 28-03-2018 | 28-03-2018 | 03:30 PM | Active | और देखें |
58. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PARKER MAKE SINGLE SOLENOID VALVE(PUR/MOIL/C-11/131/E-77/1224-M Dt. 06-03-2018) | 06-03-2018 | 28-03-2018 | 28-03-2018 | 28-03-2018 | 03:30 PM | Active | और देखें |
59. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF FILTER BAGS FOR AIR POLLUTION CONTROL UNIT(PUR/MOIL/C-11/125/E-76/1215-M Dt. 06-03-2018) | 06-03-2018 | 06-04-2018 | 06-04-2018 | 06-04-2018 | 03:30 PM | Active | और देखें |
60. | Blanket Rate Contract for supply of various all types and sizes of Bearings, Sleeves with Nuts, C.I. Pedestals Etc.(WE-202 DT.06.03.2018(e-Tender no.MOIL/17-18/ET/485) | 06-03-2018 | 12-04-2018 | 12-04-2018 | 12-04-2018 | 03:30 PM | Active | और देखें |
61. | Design and detailed Plant-in-charge ing supply erection commissioning and testing of rotary kiln including all accessories for Mn ore reduction at EMD Plant, Dongri Buzurg Mine(MOIL/17-18/ET/463) | 06-03-2018 | 13-04-2018 | 13-04-2018 | 13-04-2018 | 03:30 PM | Active | और देखें |
62. | Recovery of SM Grd. BGL-462 25 Percent Mn content ore from old dump material at Balaghat Mine( MOIL/17-18/ET/475) | 05-03-2018 | 15-03-2018 | 15-03-2018 | 15-03-2018 | 03:30 PM | Active | और देखें |
63. | Supplying, providing, erection,installation and commissioning of Street light, from Main Gate to First Vertical Shaft of Ukwa Mine(MOIL/17-18/ET/469) | 05-03-2018 | 23-03-2018 | 23-03-2018 | 23-03-2018 | 03:30 PM | Active | और देखें |
64. | PURCHASE OF FLEXIBLE TRAILING CABLE 1.1 KV , 5CX 25 SqMM FOR CHIKLA MINE(PUR/MOIL/CH/ELECT/309) | 01-03-2018 | 14-03-2018 | 14-03-2018 | 14-03-2018 | 03:30 PM | Active | और देखें |
65. | Enhancement of hoisting capacity by replacing existing individual skips and cages assemblies by single Cage cum Skip Assemblies and other modifications in winding system of Production Shaft at Balaghat Mine(MOIL/17-18/ET/464) | 01-03-2018 | 06-04-2018 | 06-04-2018 | 06-04-2018 | 01:30 PM | Active | और देखें |
66. | Maintenance of all Gardens at Premises of MOIL Nagpur(MOIL/17-18/ET/437) | 28-02-2018 | 09-03-2018 | 09-03-2018 | 09-03-2018 | 03:30 PM | Active | और देखें |
67. | Excavation For Reclaiming the Site For Proposed Construction of DAV Moil Public School at Munsar Under CSR(MOIL/17-18/ET/ 474) | 28-02-2018 | 13-03-2018 | 13-03-2018 | 13-03-2018 | 03:30 PM | Active | और देखें |
68. | Pattern making, casting,Machining and dynamic balancing of Pumps Spares for 220 HP Mather and Platt make Multi stage Pump of 6th Level Underground of Balaghat Mine(AGT/BGT/MECH/PUMP/17-18/605 dtd 26.02.2018) | 27-02-2018 | 13-03-2018 | 13-03-2018 | 13-03-2018 | 04:30 PM | Active | और देखें |
69. | Annual Maintenance contract for repairs and rewiring of electrical installations at residential quarters and office buildings at Balaghat Mine(MOIL/17-18/ET/462) | 27-02-2018 | 16-03-2018 | 16-03-2018 | 16-03-2018 | 03:30 PM | Active | और देखें |
70. | Replacement of transfer chute liners, bunker liners and chutes /bunker repair at IMB plant Balaghat mine(AGENT/BGT/MECH/IMBP/17-18/7597 dtd 26.02.2018) | 26-02-2018 | 09-03-2018 | 09-03-2018 | 09-03-2018 | 04:30 PM | Active | और देखें |
71. | Work of repair and Maintenance contract for domestic electrical installation of residential and non- residential buildings at Chikla Mine(MOIL/17-18/ET/460) | 26-02-2018 | 15-03-2018 | 15-03-2018 | 15-03-2018 | 03:30 PM | Active | और देखें |
72. | Annual Maintenance contract for repairs and rewiring of electrical installations at residential quarters and non- residential buildings at Dongri Buzurg Mine(MOIL/17-18/ET/461) | 26-02-2018 | 15-03-2018 | 15-03-2018 | 15-03-2018 | 03:30 PM | Active | और देखें |
73. | Supply of Medicines(WE-198-ET-473-dt-26-02-2018) | 26-02-2018 | 16-04-2018 | 16-04-2018 | 16-04-2018 | 03:30 PM | Active | और देखें |
74. | Construction of Toilet Block in Durga Chowk Premises at Chikla Mine (MOIL/17-18/ET/438) | 23-02-2018 | 09-03-2018 | 09-03-2018 | 09-03-2018 | 3:30 PM | Active | और देखें |
75. | Construction of GSR for sand stowing plant at Munsar Mine (MOIL/17-18/ET/380) | 23-02-2018 | 09-03-2018 | 09-03-2018 | 09-03-2018 | 3:30 PM | Active | और देखें |
76. | Maintenance of Gardens at Ukwa Mine (MOIL/17-18/ET/436) | 23-02-2018 | 09-03-2018 | 09-03-2018 | 09-03-2018 | 03:30 PM | Active | और देखें |
77. | Empanelment of Advertising Agencies(MOIL/17-18/ET/400) | 22-02-2018 | 07-03-2018 | 07-03-2018 | 07-03-2018 | 03:30 PM | Active | और देखें |
78. | Operation of pumps for drinking water supply in camp area of Beldongri Mine (MOIL/17-18/ET/290) | 22-02-2018 | 09-03-2018 | 09-03-2018 | 09-03-2018 | 03:30 PM | Active | और देखें |
79. | Repairs of 700 KW, 11 KV Squirrel Cage Induction Motor of, 4000 CFM Capacity, I.R. Make Air Compressor of Balaghat Mine (MOIL/17-18/ET/468 ) | 21-02-2018 | 06-03-2018 | 06-03-2018 | 06-03-2018 | 03:30 PM | Active | और देखें |
80. | Chute concreting at 1750 level for installation of ore Pass Ukwa Mine (16/Mining/UM/17-18/2489) | 20-02-2018 | 06-03-2018 | 06-03-2018 | 06-03-2018 | 04:30 PM | Active | और देखें |
81. | Pushing of tubs from SDL face at Gumgaon Mine (MOIL/17-18/ET/471) | 20-02-2018 | 19-03-2018 | 19-03-2018 | 19-03-2018 | 03:30 PM | Active | और देखें |
82. | Picking and collection of material from South Staff Quarter waste dump at Tirodi Mine (MOIL/17-18/ET/467) | 20-02-2018 | 19-03-2018 | 19-03-2018 | 19-03-2018 | 03:30 PM | Active | और देखें |
83. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF TEFLON BUSH AND FRP MATERIALS(PUR/MOIL/C-11/119/E-75/1208-M Dt. 16-02-2018) | 19-02-2018 | 12-03-2018 | 12-03-2018 | 12-03-2018 | 03:30 PM | Active | और देखें |
84. | Underground Concreting work RCC 200 Level at Gumgaon Mine(MOIL/17-18/ET/459) | 16-02-2018 | 15-03-2018 | 15-03-2018 | 15-03-2018 | 03:30 PM | Active | और देखें |
85. | Making and supplying of stemming material Mud plug used for blasting fragmentation in Underground at various working levels at Balaghat Mine(MOIL/17-18/ET/458) | 16-02-2018 | 15-03-2018 | 15-03-2018 | 15-03-2018 | 03:30 PM | Active | और देखें |
86. | Loading and unloading of steel sections cement bags and other materials with stacking at Balaghat Mine( MOIL/17-18/ET/457) | 16-02-2018 | 15-03-2018 | 15-03-2018 | 15-03-2018 | 03:30 PM | Active | और देखें |
87. | Picking and collection of material from South A dump at Tirodi Mine (MOIL/17-18/ET/454) | 15-02-2018 | 14-03-2018 | 14-03-2018 | 14-03-2018 | 03:30 PM | Active | और देखें |
88. | Picking and collection of material to recover LGHS ore TDL 439 and TDL 499 from waste dump West side of D dump at Tirodi Mine (MOIL/17-18/ET/455) | 15-02-2018 | 14-03-2018 | 14-03-2018 | 14-03-2018 | 03:30 PM | Active | और देखें |
89. | Cleaning of ROM recovered from Pit No.6 at Sitapatore Mine (MOIL/17-18/ET/456) | 15-02-2018 | 14-03-2018 | 14-03-2018 | 14-03-2018 | 03:30 PM | Active | और देखें |
90. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR GODREJ SULLAIR MAKE COMPRESSOR. (PUR/MOIL/C-5/73/E-66/1075-M Dt. 15/02/2018) | 14-02-2018 | 09-03-2018 | 09-03-2018 | 09-03-2018 | 03:30 PM | Active | और देखें |
91. | urchase of Jaw Plates for Sayaji Make Jaw Crushers (WE-225 e-tender No.MOIL/17-18/ET-470, Dt.15.02.18) | 14-02-2018 | 19-03-2018 | 19-03-2018 | 19-03-2018 | 03:30 PM | Active | और देखें |
92. | Electrical wiring and fixtures at newly DG house at Munsar Mine (ELECT/MUN/ADGM/17-18/4095 DT 10.02.2018) | 12-02-2018 | 23-02-2018 | 23-02-2018 | 23-02-2018 | 3:30 PM | Active | और देखें |
93. | Upgradation of LT Overhead line to 3Phase 3Wire for power supply of Dry Seperation Unit and Magazine (Elect/MUN/ADGM/17-18/4096 DT 10/02/2018) | 12-02-2018 | 26-02-2018 | 26-02-2018 | 26-02-2018 | 3:30 PM | Active | और देखें |
94. | ugmentation of 33 KV Outdoor and 11 KV indoor substation of Ukwa Mine (MOIL/17-18/ET/422 ) | 10-02-2018 | 08-03-2018 | 08-03-2018 | 08-03-2018 | 3:30 PM | Active | और देखें |
95. | Fabrication of Bearing Plates of Roof Bolts for the year 2017-18 for Balaghat Mine(AGT/BGT/MECH/RB/17-18/561 dtd 05.02.2018) | 09-02-2018 | 20-02-2018 | 20-02-2018 | 20-02-2018 | 04:30 PM | Active | और देखें |
96. | Purchase of SPRING STEEL SCREEN PANELS -21 Items(WE-224 e-tender No.MOIL/17-18/ET-466, Dt.09.02.18) | 09-02-2018 | 12-03-2018 | 12-03-2018 | 12-03-2018 | 03:30 PM | Active | और देखें |
97. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF RUBBER HOSE PIPE, TYPE - 3(PUR/MOIL/C-11/117/E-73/1163-M Dt. 07-02-2018) | 08-02-2018 | 28-02-2018 | 28-02-2018 | 28-02-2018 | 03:30 PM | Active | और देखें |
98. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF VALVES(PUR/MOIL/C-11/148/E-74/1173-M Dt. 07-02-2018) | 08-02-2018 | 12-03-2018 | 12-03-2018 | 12-03-2018 | 03:30 PM | Active | और देखें |
99. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF CERAMIC PACKING ROPE(PUR/MOIL/C-11/119/E-72/1156-M Dt. 06-02-2018) | 07-02-2018 | 28-02-2018 | 28-02-2018 | 28-02-2018 | 03:30 PM | Active | और देखें |
100. | Concreting work for Packwall at Ch 10800 section Ukwa Mine(16/Mining/UM/17-18/2375) | 06-02-2018 | 20-02-2018 | 20-02-2018 | 20-02-2018 | 04:30 pm | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |