Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. PURCHASE OF COMPLETE WHEEL AND AXLE ASSEMBLY WITH BEARING AND COVER-4NOS. FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(PUR/MOIL/BGT/GB CAR/21-22/1166) 15-12-2021 24-12-2021 24-12-2021 24-12-2021 04:30 PM Active View
2. Providing and fixing FRP doors at WC and Bathrooms of Quarters at Balaghat Mine(CIVI/BGT/LT/21-22/3548 DT. 13.12.2021) 14-12-2021 23-12-2021 23-12-2021 23-12-2021 04:30 PM Active View
3. Repairing of Rotary Dryer of HIMS Plant for drying feed ore fines.(DB/MECH/21-22/AGENT/1253) 11-12-2021 15-12-2021 15-12-2021 15-12-2021 04:30 PM Active View
4. Pushing of tubs from LHD or SDL face at Balaghat Mine(Mining/BGT/LT/AGT/21-22/1150 DT. 10.12.2021) 11-12-2021 20-12-2021 20-12-2021 20-12-2021 04:30 PM Active View
5. PROVIDING AND SUPPLYING BLACK GITTI INCLUDING ROYALTY THE WORK INCLUDES LOADING OF GITTI IN TO TRUCKS TRANSPORTATION UNLOADING AT SITE AND STACKING AS REQUIRED AT BELDONGRI MINE(BEL/MIN/2021-22/2098) 08-12-2021 14-12-2021 14-12-2021 14-12-2021 04:30 PM Active View
6. Repairing of flooring work for old workshop premises and 2nd vertical shaft premises at Chikla Mine(CIVIL/CH/T.E./21-22/2954) 07-12-2021 15-12-2021 15-12-2021 15-12-2021 04:30 PM Active View
7. Construction of Lease Boundary Pillers in Balaghat Mine(CIVI/BGT/LT/AGT/20-21/1143 DT. 07.12.2021) 07-12-2021 14-12-2021 14-12-2021 14-12-2021 04:30 PM Active View
8. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-65/172-M Dt. 07-12-2021) 07-12-2021 28-12-2021 28-12-2021 28-12-2021 03:30 PM Active View
9. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PUMP SARES - LEAK PROOF RAJEDIA RD40A-160 AND RD40N-125(PUR/MOIL/C-11/21/E-64/171-M Dt. 07-12-2021) 07-12-2021 28-12-2021 28-12-2021 28-12-2021 03:30 PM Active View
10. e-Procurement of Two Years Blanket Rate Contract for Repairing and Retreading of Vehicle/OTR Tyres (Only through e-procurement)(WE-13(ET-93) DT.07.12.2021) 07-12-2021 05-01-2022 05-01-2022 06-01-2022 03:30 PM Active View
11. Cleaning of crushing plant ROM by sorting sizing(Mining/MUN/NIT/2021-22/1327) 06-12-2021 13-12-2021 13-12-2021 13-12-2021 04:30 PM Active View
12. PURCHASE OF C CLASS ACCORDING TO ATTACHED ANNEXURES MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(PUR/MOIL/CH/1230) 06-12-2021 27-12-2021 27-12-2021 27-12-2021 04:30 PM Active View
13. Fabrication of Bearing Plates of Roof Bolts for the year 2022 for Balaghat Mine.(AGT/BGT/MECH/RB/21-22/1129) 06-12-2021 27-12-2021 27-12-2021 27-12-2021 04:30 PM Active View
14. Supply installation commissioning of OFC wired Armed LAN connectivity to Mine Hospital from EMD Plant Dongri Buzurg Mine(DB/SYSTEM/NETWORK/2021-22/1238) 06-12-2021 15-12-2021 15-12-2021 15-12-2021 04:00 PM Active View
15. Pattern making, casting, Machining and Dynamic balancing Of pump spares with complete fitting of 300Hp Maxflow make Multistage Pump(AGT/BGT/MECH/PUMP/21-22/1128) 04-12-2021 23-12-2021 23-12-2021 23-12-2021 04:30 PM Active View
16. PROCUREMENT OF WORM GEAR BOX 1 NO FOR 15.5 LOADING STATION AT BALAGAHT MINE.(PUR/MOIL/BGT/WINDER/21-22/1130) 04-12-2021 23-12-2021 23-12-2021 23-12-2021 04:30 PM Active View
17. Construction of Collection Tank for Sewage Treatment Plant at Chandmara Colony, Dongri Buzurg Mine(DB/Civil/2021-22/2660 Date 01.12.2021) 03-12-2021 08-12-2021 08-12-2021 08-12-2021 04:30 PM Active View
18. External painting works comprising of distempering and snowcem works to road side compound wall, B and C-Type Residential Quarters at Dongri Buzurg Mine.(DB/Civil/2021-22/2661 Date 22.11.2021) 03-12-2021 08-12-2021 08-12-2021 08-12-2021 04:30 PM Active View
19. Repair of shed for BDC Section of Dongri Buzurg Mine(DB/Civil/2021-22/2661A Date 22.11.2021) 03-12-2021 08-12-2021 08-12-2021 08-12-2021 04:30 PM Active View
20. REWIRING OF COMPANY QUARTERS AS PER SCHEDULE OF WORK AT BELDONGRI MINE(BEL/ELEC/21-22/2068) 03-12-2021 13-12-2021 13-12-2021 13-12-2021 04:30 PM Active View
21. Drilling of bore hole for sand stowing plant at Beldongri Mine, Gumgaon Mine, Kandri Mine and Munsar Mine.(MOIL/21-22/ET/89.) 03-12-2021 23-12-2021 23-12-2021 23-12-2021 03:30 PM Active View
22. Drilling of two No bore hole from surface to 11th level south and north for sand stowing work at Balaghat Mine.(MOIL/21-22/ET/90.) 03-12-2021 23-12-2021 23-12-2021 23-12-2021 03:30 PM Active View
23. Construction of Industrial shed at Bed debries cleaning floor (BDC) at Dongri Buzurg Mine(MOIL/21-22/ET/88) 03-12-2021 23-12-2021 23-12-2021 23-12-2021 03:30 PM Active View
24. Construction of Cement concrete road, drain network and retaining wall from Mine Hospital to Pit office, screening plant and siding at Kandri Mine.(MOIL/21-22/ET/92) 03-12-2021 23-12-2021 23-12-2021 23-12-2021 03:30 PM Active View
25. Construction of Industrial shed (PEB structure) at Bed Debries Cleaning (BDC) floor North and South section Tirodi Mone 2 No and at Sitapatore Mine 4 No(MOIL/21-22/ET/91) 03-12-2021 23-12-2021 23-12-2021 23-12-2021 03:30 PM Active View
26. PURCHASE OF SPARES FOR 36KV, 1250A, EDF-SK1-l SF6 HT BREAKERS, MAKE MS ABB LTD. AT FERRO MANGANESE PLANT, BALAGHAT MINE M.P.(PUR/MOIL/C-3/13/E-63/167-M DT.03/12/2021) 03-12-2021 13-12-2021 13-12-2021 13-12-2021 03:30 PM Active View
27. Purchase ESE Type Lighting Arrestor for kandri mine.(PUR/KD/ELECT/21-22/2966) 01-12-2021 15-12-2021 15-12-2021 15-12-2021 04:30 PM Active View
28. REPAIR OF AIR END OF KIRLOSKAR COMPRESOR OF BELDONGRI MINE AS PER SCOPE OF WORK(BL/MECH/21-22/2042) 01-12-2021 10-12-2021 10-12-2021 10-12-2021 04:30 PM Active View
29. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER.(PUR/MOIL/C-5/30/E- 62 /164 -M Dt. 01/12/2021) 01-12-2021 22-12-2021 22-12-2021 22-12-2021 05:30 PM Active View
30. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-5/28 /E- 61/162-M Dt. 30/11/2021) 30-11-2021 22-12-2021 22-12-2021 22-12-2021 03:30 PM Active View
31. PURCHASE OF M.S. PIPES AND M.S. FLANGES FOR BALAGHAT MINE(PUR/MOIL/BGT/IMB/21-22/1105) 29-11-2021 17-12-2021 17-12-2021 17-12-2021 04:30 PM Active View
32. Designing Supply Installation and Commissioning of Automatic Fire Detection and Suppression System in EIMCO ELECON Loader(AGENT and JGM/MINES/GRIII/1314) 29-11-2021 15-12-2021 15-12-2021 15-12-2021 04:30 PM Active View
33. Construction of Engineered revetment structure at area of river bank adjacent to high speed shaft location at Gumgaon Mine.(MOIL/21-22/ET/ 84) 29-11-2021 20-12-2021 20-12-2021 20-12-2021 03:30 PM Active View
34. Construction of new leaching vessel foundation at EMD plant , Dongri Buzurg Mine.(MOIL/21-22/ET/87) 29-11-2021 20-12-2021 20-12-2021 20-12-2021 03:30 PM Active View
35. Construction of Cement concrete platform at Railway siding at Tirodi Mine(MOIL/21-22/ET/86) 29-11-2021 23-12-2021 23-12-2021 23-12-2021 03:30 PM Active View
36. Providing and installation of portable cabin for pit office for open cast at Dongri Buzurg Mine(MOIL/21-22/ET/85) 29-11-2021 20-12-2021 20-12-2021 20-12-2021 03:30 PM Active View
37. Providing 10 mbps 1 is to 1 Internet Leased Line at Gumgaon Mine(AJGM/Group-III/SYS/NW/ 2021-22/1311) 29-11-2021 06-12-2021 06-12-2021 06-12-2021 03:30 PM Active View
38. TENDER DOCUMENT FOR OUTSOURCING OF MAINTENANCE, DISTRIBUTION AND COLLECTION OF CAPLAMP FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/1099) 27-11-2021 30-11-2021 30-11-2021 30-11-2021 03:30 PM Active View
39. PURCHASE OF SUCTION END CASING- 2NOS. OF 240HP KIRLOSKAR MAKE CENTRIFUGAL PUMP. MODEL-RKB-125/3OK, 8STG 240 HP PUMP AT BALAGHAT MINE(PUR/MOIL/BGT/PUMP/21-22/1100) 27-11-2021 06-12-2021 06-12-2021 06-12-2021 04:30 PM Active View
40. PURCHASE OF CS WHEEL ASSEMBLY WITH COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(UR/MOIL/BGT/GB CAR/21-22/1098) 27-11-2021 03-12-2021 03-12-2021 03-12-2021 04:30 PM Active View
41. Purchase of Black gitti for UG concreting at Kandri Mine(KAN/MINES/NIT/21-22/2654 dt. 26.11.2021) 26-11-2021 03-12-2021 03-12-2021 03-12-2021 04:30 PM Active View
42. Laying of 6 and 4 G.I Pipe Lines for Compressed Air supply in underground levels at Balaghat Mine.(AGT/BGT/MECH/PIPE/21-22/1079) 23-11-2021 13-12-2021 13-12-2021 13-12-2021 04:30 PM Active View
43. Interior Renovation work for Gents Toilet in Main Administrative Building of Dongri Buzurg Mine.(DB/Civil/2021-22/2560 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
44. Widening of Entrance Gate including fixing of structural steel gate, concreting work and speed breakers for workshop premises at Dongri Buzurg Mine(DB/Civil/2021-22/2561 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
45. Construction of walkway platform for Railway Weigh Bridge including chain link fencing all around the building at Dongri Buzurg Mine.(DB/Civil/2021-22/2562 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
46. Minor repair works comprising of replacement of old worn out and damaged windows with three track aluminium sliding windows for C-Type quarters at Dongri Buzurg Mine.(DB/Civil/2021-22/2563 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
47. Development and beautification of garden at New Medical Administrative building at Chikla Mine(CIVIL/CH/T.E./21-22/2811) 20-11-2021 06-12-2021 06-12-2021 06-12-2021 04:30 PM Active View
48. WEBSITE SINGLE/ PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR OVIS MAKES - 4 AND 3 TON BATTERYD/DIESEL OPERATED LOCOMOTIVES.(PUR/MOIL/C-5/44/E- 60/155 -M Dt.20/11/2021) 20-11-2021 13-12-2021 13-12-2021 13-12-2021 03:30 PM Active View
49. Cleaning of Workshop premises of Dongri Buzurg Mine.(DB/MECH/20-21/AGENT/1159) 19-11-2021 27-11-2021 27-11-2021 27-11-2021 04:30 PM Active View
50. Fabrication of Guide Rollers for Tub Tipplers at Chikla Mine.(TE/CH/MECH/21-22/19065/1146) 19-11-2021 24-11-2021 24-11-2021 24-11-2021 03:30 PM Active View
51. EXPRESSION OF INTEREST FOR THE TRANSFER OF TECHNOLOGY FOR PRODUCTION OF ELECTROLYTIC MANGANESE METAL (EMM) AND/ OR DESIGN AND CONSTRUCTION OF A NEW ELECTROLYTIC MANGANESE METAL (EMM) PLANT(SMG/EMM-EOI/21-22/01) 18-11-2021 18-01-2022 18-01-2022 18-01-2022 03:30 PM Active View
52. Purchase of PEARL COKE with Transportation - 6600 MT(MOIL/21-22/ET-83 dt.17.11.2021) 17-11-2021 07-12-2021 07-12-2021 08-12-2021 03:30 PM Active View
53. OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/1047) 16-11-2021 18-11-2021 18-11-2021 18-11-2021 03:30 PM Active View
54. Providing and Supplying of Drive Sinamics G120 55KW Heavy Duty Power Module As per Annexure A(PUR/MOIL/2021-22/1890) 16-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
55. Fabrication of Hose Fittings required in Underground at Balaghat Mine.(AGT/BGT/MECH/HO-FIT/21-22/1042) 15-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
56. Cleaning of accumulated sand from UG50L and UG150L at Kandri Mine.(KD/MINES/NIT/2021-22/2520) 11-11-2021 22-11-2021 22-11-2021 22-11-2021 04:30 PM Active View
57. Purchase of Black Gitti for U/G concreting at Kandri Mine(KD/MINES/NIT/2021-22/2482) 10-11-2021 19-11-2021 19-11-2021 19-11-2021 04:30 PM Active View
58. Repairing of Worn Our Wheels 50nos.and Axle Shaft 30nos of GB Car Deployed in Underground Levels of Balaghat Mine.(AGT/BGT/MECH/GB-CAR/21-22/1032) 10-11-2021 18-11-2021 18-11-2021 18-11-2021 04:30 PM Active View
59. Fabrication of Hydraulic Power Pack with Intercooler Assy. for Secondary Brake/ Thruster Brake at Holmes Shaft Cage winder-350 HP. of Balaghat Mine.(AGT/BGT/MECH/WINDER/21-22/1031) 10-11-2021 15-11-2021 15-11-2021 15-11-2021 04:30 PM Active View
60. TENDER DOCUMENTS FOR INSTALLATION AND COMMISSIONING OF 11KV HT VCB PANEL 6TH LEVEL SURFACE SUBSTATION AT BALAGHAT MINE.(BGT/TE/ELECT/AJGM/21-22/1025) 09-11-2021 15-11-2021 15-11-2021 15-11-2021 03:30 PM Active View
61. PURCHASE ESE LIGHTING ARRESTOR FOR KANDRI MINE(PUR/KD/ELECT/21-22/ 2451) 08-11-2021 17-11-2021 17-11-2021 17-11-2021 04:30 PM Active View
62. Repairing of Centre Joint Assy of Tata Hitachi 1200 Hydraulic Excavator operating at Dongri Buzurg Mine Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1102) 04-11-2021 16-11-2021 16-11-2021 16-11-2021 04:30 PM Active View
63. Repairing of Bucket Cylinder of Tata 450-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1101) 04-11-2021 16-11-2021 16-11-2021 16-11-2021 04:30 PM Active View
64. Development, Beautification and Horticulture works towards landscaping works for new Medical Administrative Building at Dongri Buzurg Mine.(DB/CIVIL/21-22/2366 Date 02.11.2021) 04-11-2021 12-11-2021 12-11-2021 12-11-2021 04:30 PM Active View
65. Cutting and cleaning of grass, shrubs Bushes from Residential Premises in Officers Colony, Syndicate Camp and Chandmara Colony at Dongri Buzurg Mine.(DB/CIVIL/21-22/2368 Date 02.11.2021) 04-11-2021 12-11-2021 12-11-2021 12-11-2021 04:30 PM Active View
66. Carpentry Works, Repair to Furniture, Construction of Runner and Glass works for Mine Managers Cabin at Dongri Buzurg Mine(DB/CIVIL/21-22/2367 Dated 02.11.2021) 04-11-2021 12-11-2021 12-11-2021 16-11-2021 04:30 PM Active View
67. 15 NOS CHEMICAL EARTH PIT FOR DIFFERENT SURFACE SUBSTATION AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/994) 01-11-2021 08-11-2021 08-11-2021 08-12-2021 03:30 PM Active View
68. Major Repair of Gear Boxes of Ashok Leyland Tippers MP50-H-1266 and MP-50-H-1267 Operating at Balaghat Mine.(AGENT/BGT/MECH/TIPP/21-22/1007) 30-10-2021 08-11-2021 08-11-2021 08-11-2021 04:30 PM Active View
69. PURCHASE OF TOP AND BOTTOM ASSEMBLY 2Nos FOR DSM80 by 36 KIRLOSKAR MAKE 60HP PUMP FOR IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/21-22/MECH/1093) 30-10-2021 17-11-2021 17-11-2021 17-11-2021 04:30 PM Active View
70. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MAXFLOW PUMP.(PUR/MOIL/C-5/28 /E-59 /142-M Dt.30/10/2021) 30-10-2021 19-11-2021 19-11-2021 19-11-2021 03:30 PM Active View
71. Designing Supply Installation and Commissioning of Automatic Fire Detection and Suppression System in EIMCO ELECON Loader(AGENT and JGM/MINES/GRIII/1161) 29-10-2021 10-11-2021 10-11-2021 15-11-2021 04:30 PM Active View
72. Annual service maintenance contract for winder system installed at various mines for a period of two years.(MOIL/21-22/ET/79) 27-10-2021 26-11-2021 26-11-2021 26-11-2021 03:30 PM Active View
73. Supply of black Metal(Gitti) for Undergroung concreting work at munsar mine(Mun/Min/NIT/2021-22/1134) 27-10-2021 02-11-2021 02-11-2021 02-11-2021 04:30 PM Active View
74. Transportation Unloading of ROM Rock Tubs from Vertical Shaft to OCF Return of empty tubs to UG at Beldongri Mine(BEL/MIN/2021-22/1726) 25-10-2021 01-11-2021 01-11-2021 01-11-2021 04:30 PM Active View
75. Construction of parking shed at BDC OCF and Administrative building premises at Gumgaon Mine(MOIL/21-22/ET/74) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
76. Construction of boundry wall around Mine lease area at Tirodi and Sitapatore Mines(MOIL/21-22/ET/76) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
77. Construction of boundry wall Retaining wall and Drain near Ferro Manganese plant Office at Balaghat Mine(MOIL/21-22/ET/78) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
78. Construction of Pit office beside Vertical Shaft at Kandri Mines(MOIL/21-22/ET/80) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
79. Construction of 100000 Liters Capacity Circular Ground Service Reservoir near Sand Stowing Plant at Ukwa Mine(MOIL/21-22/ET/81) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
80. Construction of shed to preserve core boxes at Pani Mines GMDC Ltd Manganese project District Chhota Udepur of Gujrat State(MOIL/21-22/ET/75) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
81. Painting of various structures of Winding Engine Installations , Waste Rock bunker and spillage bunker(AGENT/BGT/MECH/WIN/21-22/2915) 22-10-2021 11-11-2021 11-11-2021 11-11-2021 04:30 PM Active View
82. PURCHASE OF COMPLETE WHEEL AND AXLE ASSEMBLY WITH BEARING AND COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE.(PUR/MOIL/BGT/GB CAR/21-22/972) 21-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active View
83. Purchase of Hose Fittings for Rock Drill and Air Leg Machines(MOIL/21-22/ET-82,Dt.21/10/2021) 21-10-2021 11-11-2021 11-11-2021 12-11-2021 03:30 PM Active View
84. PURCHASE OF SPARES FOR ATLAS COPCO MAKE COMPRESSOR.(PUR/MOIL/C-5/40 /E-58 / 138-M Dt.20/10/2021) 20-10-2021 09-11-2021 09-11-2021 10-11-2021 03:30 PM Active View
85. PURCHASE OF HIGH PRESSURE MULTISTAGE WATER PUMP KSB MAKE QTY 2 NOS MOVI 32/6(MOIL/EMD/CH/AJGM/21-22/1013) 19-10-2021 09-11-2021 09-11-2021 09-11-2021 04:30 PM Active View
86. PURCHASE OF SOLID TYRE 10.00 X 20-4nos., MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD (Loader) MACHINE IN UNDREGROUND OF BALAGHAT MINE(PUR/MOIL/BGT/Sol-Tyr/21-22/960) 18-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active View
87. PURCHASE OF SPARES FOR SIEMENS MAKE PLC PANEL OF WINDER FOR GUMGAON MINE (M.S).(PUR/MOIL/C-3/13/E-57/136-M Dt.18/10/2021) 18-10-2021 03-11-2021 03-11-2021 03-11-2021 03:30 PM Active View
88. Interior Renovation for Toilet adjacent to Conference Hall at Main Administrative Building of Dongribuzurg Mine(DB/CIVIl/2021-22/ Dated 15.10.2021) 16-10-2021 22-10-2021 22-10-2021 22-10-2021 04:30 PM Active View
89. PURCHASE OF SPARES FOR SULLAIR COMPRESSOR.(PUR/MOIL/C-5/73 /E- 56 / 132 -M ,Dt.16/10/2021) 16-10-2021 06-11-2021 06-11-2021 08-11-2021 03:30 PM Active View
90. Purchase of Site Mixed Emulsion (SME).(WE-9 Dt 16.10.2021(e-Tender NO.MOIL/21-22/ET/77)) 16-10-2021 25-10-2021 25-10-2021 26-10-2021 03:30 PM Active View
91. Interior Renovation works for Mine Managers Cabin at Dongri Buzurg Mine(DB/Civil/2021-22/ Dated 12.10.2021) 15-10-2021 19-10-2021 19-10-2021 19-10-2021 04:30 PM Active View
92. Providing and Installation of Tyre Washing System at Dongri Buzurg Mine(DB/CIVIL/2021-22/2095 Dated 12.10.2021) 15-10-2021 22-10-2021 22-10-2021 22-10-2021 04:30 PM Active View
93. Supply of Tools for Chikla and Dongri(PUR/MOIL/CH/820) 14-10-2021 11-11-2021 11-11-2021 11-11-2021 04:30 PM Active View
94. CLEANING OF SPILLAGE ORE AND FINES FROM VARIOUS PLACES OF IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/IMB/21-22 /996) 13-10-2021 29-10-2021 29-10-2021 29-10-2021 04:30 PM Active View
95. Installation and commissioning of Automatic Fire Detection and Suppression System in Eimco Elecon Front End Wheel Loader Model AL520Z at Gumgaon Mine(AGENT/GM/MECH/21-22/1062) 13-10-2021 02-11-2021 02-11-2021 02-11-2021 04:30 PM Active View
96. Muffle Blasting work and ANFO filling work AT DONGRI BUZURG MINE(DB/Blasting /21-22/991) 12-10-2021 20-10-2021 20-10-2021 20-10-2021 04:30 PM Active View
97. Supply of Incremental Encoder(ELECT/MUN/ADGM/21-22/1072, Dated - 10.10.2021) 11-10-2021 23-10-2021 23-10-2021 23-10-2021 04:30 PM Active View
98. Grass Seed Plantation Program in waste dump benches stabilization of mine area for the Compliance of Condition stipulated in Environmental Clearance and as per guideline of Indian Bureau of Mine at Chikla Mine(CIVIL/CH/T.E./21-22/989) 11-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active View
99. Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas(MOIL/21-22/ET-73 dt.11.10.2021) 11-10-2021 25-10-2021 25-10-2021 26-10-2021 03:30 PM Active View
100. WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF C CLASS FASTENERS-II MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-MOIL/CH/819/FastenerPart-II) 10-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.