निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Repairing of Rotary Dryer of HIMS Plant for drying feed ore fines.(DB/MECH/21-22/AGENT/1253) | 11-12-2021 | 15-12-2021 | 15-12-2021 | 15-12-2021 | 04:30 PM | Active | और देखें |
2. | Pushing of tubs from LHD or SDL face at Balaghat Mine(Mining/BGT/LT/AGT/21-22/1150 DT. 10.12.2021) | 11-12-2021 | 20-12-2021 | 20-12-2021 | 20-12-2021 | 04:30 PM | Active | और देखें |
3. | PROVIDING AND SUPPLYING BLACK GITTI INCLUDING ROYALTY THE WORK INCLUDES LOADING OF GITTI IN TO TRUCKS TRANSPORTATION UNLOADING AT SITE AND STACKING AS REQUIRED AT BELDONGRI MINE(BEL/MIN/2021-22/2098) | 08-12-2021 | 14-12-2021 | 14-12-2021 | 14-12-2021 | 04:30 PM | Active | और देखें |
4. | Repairing of flooring work for old workshop premises and 2nd vertical shaft premises at Chikla Mine(CIVIL/CH/T.E./21-22/2954) | 07-12-2021 | 15-12-2021 | 15-12-2021 | 15-12-2021 | 04:30 PM | Active | और देखें |
5. | Construction of Lease Boundary Pillers in Balaghat Mine(CIVI/BGT/LT/AGT/20-21/1143 DT. 07.12.2021) | 07-12-2021 | 14-12-2021 | 14-12-2021 | 14-12-2021 | 04:30 PM | Active | और देखें |
6. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-65/172-M Dt. 07-12-2021) | 07-12-2021 | 28-12-2021 | 28-12-2021 | 28-12-2021 | 03:30 PM | Active | और देखें |
7. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PUMP SARES - LEAK PROOF RAJEDIA RD40A-160 AND RD40N-125(PUR/MOIL/C-11/21/E-64/171-M Dt. 07-12-2021) | 07-12-2021 | 28-12-2021 | 28-12-2021 | 28-12-2021 | 03:30 PM | Active | और देखें |
8. | e-Procurement of Two Years Blanket Rate Contract for Repairing and Retreading of Vehicle/OTR Tyres (Only through e-procurement)(WE-13(ET-93) DT.07.12.2021) | 07-12-2021 | 05-01-2022 | 05-01-2022 | 06-01-2022 | 03:30 PM | Active | और देखें |
9. | Cleaning of crushing plant ROM by sorting sizing(Mining/MUN/NIT/2021-22/1327) | 06-12-2021 | 13-12-2021 | 13-12-2021 | 13-12-2021 | 04:30 PM | Active | और देखें |
10. | PURCHASE OF C CLASS ACCORDING TO ATTACHED ANNEXURES MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(PUR/MOIL/CH/1230) | 06-12-2021 | 27-12-2021 | 27-12-2021 | 27-12-2021 | 04:30 PM | Active | और देखें |
11. | Fabrication of Bearing Plates of Roof Bolts for the year 2022 for Balaghat Mine.(AGT/BGT/MECH/RB/21-22/1129) | 06-12-2021 | 27-12-2021 | 27-12-2021 | 27-12-2021 | 04:30 PM | Active | और देखें |
12. | Supply installation commissioning of OFC wired Armed LAN connectivity to Mine Hospital from EMD Plant Dongri Buzurg Mine(DB/SYSTEM/NETWORK/2021-22/1238) | 06-12-2021 | 15-12-2021 | 15-12-2021 | 15-12-2021 | 04:00 PM | Active | और देखें |
13. | Pattern making, casting, Machining and Dynamic balancing Of pump spares with complete fitting of 300Hp Maxflow make Multistage Pump(AGT/BGT/MECH/PUMP/21-22/1128) | 04-12-2021 | 23-12-2021 | 23-12-2021 | 23-12-2021 | 04:30 PM | Active | और देखें |
14. | PROCUREMENT OF WORM GEAR BOX 1 NO FOR 15.5 LOADING STATION AT BALAGAHT MINE.(PUR/MOIL/BGT/WINDER/21-22/1130) | 04-12-2021 | 23-12-2021 | 23-12-2021 | 23-12-2021 | 04:30 PM | Active | और देखें |
15. | Construction of Collection Tank for Sewage Treatment Plant at Chandmara Colony, Dongri Buzurg Mine(DB/Civil/2021-22/2660 Date 01.12.2021) | 03-12-2021 | 08-12-2021 | 08-12-2021 | 08-12-2021 | 04:30 PM | Active | और देखें |
16. | External painting works comprising of distempering and snowcem works to road side compound wall, B and C-Type Residential Quarters at Dongri Buzurg Mine.(DB/Civil/2021-22/2661 Date 22.11.2021) | 03-12-2021 | 08-12-2021 | 08-12-2021 | 08-12-2021 | 04:30 PM | Active | और देखें |
17. | Repair of shed for BDC Section of Dongri Buzurg Mine(DB/Civil/2021-22/2661A Date 22.11.2021) | 03-12-2021 | 08-12-2021 | 08-12-2021 | 08-12-2021 | 04:30 PM | Active | और देखें |
18. | REWIRING OF COMPANY QUARTERS AS PER SCHEDULE OF WORK AT BELDONGRI MINE(BEL/ELEC/21-22/2068) | 03-12-2021 | 13-12-2021 | 13-12-2021 | 13-12-2021 | 04:30 PM | Active | और देखें |
19. | Drilling of bore hole for sand stowing plant at Beldongri Mine, Gumgaon Mine, Kandri Mine and Munsar Mine.(MOIL/21-22/ET/89.) | 03-12-2021 | 23-12-2021 | 23-12-2021 | 23-12-2021 | 03:30 PM | Active | और देखें |
20. | Drilling of two No bore hole from surface to 11th level south and north for sand stowing work at Balaghat Mine.(MOIL/21-22/ET/90.) | 03-12-2021 | 23-12-2021 | 23-12-2021 | 23-12-2021 | 03:30 PM | Active | और देखें |
21. | Construction of Industrial shed at Bed debries cleaning floor (BDC) at Dongri Buzurg Mine(MOIL/21-22/ET/88) | 03-12-2021 | 23-12-2021 | 23-12-2021 | 23-12-2021 | 03:30 PM | Active | और देखें |
22. | Construction of Cement concrete road, drain network and retaining wall from Mine Hospital to Pit office, screening plant and siding at Kandri Mine.(MOIL/21-22/ET/92) | 03-12-2021 | 23-12-2021 | 23-12-2021 | 23-12-2021 | 03:30 PM | Active | और देखें |
23. | Construction of Industrial shed (PEB structure) at Bed Debries Cleaning (BDC) floor North and South section Tirodi Mone 2 No and at Sitapatore Mine 4 No(MOIL/21-22/ET/91) | 03-12-2021 | 23-12-2021 | 23-12-2021 | 23-12-2021 | 03:30 PM | Active | और देखें |
24. | PURCHASE OF SPARES FOR 36KV, 1250A, EDF-SK1-l SF6 HT BREAKERS, MAKE MS ABB LTD. AT FERRO MANGANESE PLANT, BALAGHAT MINE M.P.(PUR/MOIL/C-3/13/E-63/167-M DT.03/12/2021) | 03-12-2021 | 13-12-2021 | 13-12-2021 | 13-12-2021 | 03:30 PM | Active | और देखें |
25. | Purchase ESE Type Lighting Arrestor for kandri mine.(PUR/KD/ELECT/21-22/2966) | 01-12-2021 | 15-12-2021 | 15-12-2021 | 15-12-2021 | 04:30 PM | Active | और देखें |
26. | REPAIR OF AIR END OF KIRLOSKAR COMPRESOR OF BELDONGRI MINE AS PER SCOPE OF WORK(BL/MECH/21-22/2042) | 01-12-2021 | 10-12-2021 | 10-12-2021 | 10-12-2021 | 04:30 PM | Active | और देखें |
27. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER.(PUR/MOIL/C-5/30/E- 62 /164 -M Dt. 01/12/2021) | 01-12-2021 | 22-12-2021 | 22-12-2021 | 22-12-2021 | 05:30 PM | Active | और देखें |
28. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-5/28 /E- 61/162-M Dt. 30/11/2021) | 30-11-2021 | 22-12-2021 | 22-12-2021 | 22-12-2021 | 03:30 PM | Active | और देखें |
29. | PURCHASE OF M.S. PIPES AND M.S. FLANGES FOR BALAGHAT MINE(PUR/MOIL/BGT/IMB/21-22/1105) | 29-11-2021 | 17-12-2021 | 17-12-2021 | 17-12-2021 | 04:30 PM | Active | और देखें |
30. | Designing Supply Installation and Commissioning of Automatic Fire Detection and Suppression System in EIMCO ELECON Loader(AGENT and JGM/MINES/GRIII/1314) | 29-11-2021 | 15-12-2021 | 15-12-2021 | 15-12-2021 | 04:30 PM | Active | और देखें |
31. | Construction of Engineered revetment structure at area of river bank adjacent to high speed shaft location at Gumgaon Mine.(MOIL/21-22/ET/ 84) | 29-11-2021 | 20-12-2021 | 20-12-2021 | 20-12-2021 | 03:30 PM | Active | और देखें |
32. | Construction of new leaching vessel foundation at EMD plant , Dongri Buzurg Mine.(MOIL/21-22/ET/87) | 29-11-2021 | 20-12-2021 | 20-12-2021 | 20-12-2021 | 03:30 PM | Active | और देखें |
33. | Construction of Cement concrete platform at Railway siding at Tirodi Mine(MOIL/21-22/ET/86) | 29-11-2021 | 23-12-2021 | 23-12-2021 | 23-12-2021 | 03:30 PM | Active | और देखें |
34. | Providing and installation of portable cabin for pit office for open cast at Dongri Buzurg Mine(MOIL/21-22/ET/85) | 29-11-2021 | 20-12-2021 | 20-12-2021 | 20-12-2021 | 03:30 PM | Active | और देखें |
35. | Providing 10 mbps 1 is to 1 Internet Leased Line at Gumgaon Mine(AJGM/Group-III/SYS/NW/ 2021-22/1311) | 29-11-2021 | 06-12-2021 | 06-12-2021 | 06-12-2021 | 03:30 PM | Active | और देखें |
36. | TENDER DOCUMENT FOR OUTSOURCING OF MAINTENANCE, DISTRIBUTION AND COLLECTION OF CAPLAMP FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/1099) | 27-11-2021 | 30-11-2021 | 30-11-2021 | 30-11-2021 | 03:30 PM | Active | और देखें |
37. | PURCHASE OF SUCTION END CASING- 2NOS. OF 240HP KIRLOSKAR MAKE CENTRIFUGAL PUMP. MODEL-RKB-125/3OK, 8STG 240 HP PUMP AT BALAGHAT MINE(PUR/MOIL/BGT/PUMP/21-22/1100) | 27-11-2021 | 06-12-2021 | 06-12-2021 | 06-12-2021 | 04:30 PM | Active | और देखें |
38. | PURCHASE OF CS WHEEL ASSEMBLY WITH COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(UR/MOIL/BGT/GB CAR/21-22/1098) | 27-11-2021 | 03-12-2021 | 03-12-2021 | 03-12-2021 | 04:30 PM | Active | और देखें |
39. | Purchase of Black gitti for UG concreting at Kandri Mine(KAN/MINES/NIT/21-22/2654 dt. 26.11.2021) | 26-11-2021 | 03-12-2021 | 03-12-2021 | 03-12-2021 | 04:30 PM | Active | और देखें |
40. | Laying of 6 and 4 G.I Pipe Lines for Compressed Air supply in underground levels at Balaghat Mine.(AGT/BGT/MECH/PIPE/21-22/1079) | 23-11-2021 | 13-12-2021 | 13-12-2021 | 13-12-2021 | 04:30 PM | Active | और देखें |
41. | Interior Renovation work for Gents Toilet in Main Administrative Building of Dongri Buzurg Mine.(DB/Civil/2021-22/2560 Date 22.11.2021) | 23-11-2021 | 30-11-2021 | 30-11-2021 | 30-11-2021 | 04:30 PM | Active | और देखें |
42. | Widening of Entrance Gate including fixing of structural steel gate, concreting work and speed breakers for workshop premises at Dongri Buzurg Mine(DB/Civil/2021-22/2561 Date 22.11.2021) | 23-11-2021 | 30-11-2021 | 30-11-2021 | 30-11-2021 | 04:30 PM | Active | और देखें |
43. | Construction of walkway platform for Railway Weigh Bridge including chain link fencing all around the building at Dongri Buzurg Mine.(DB/Civil/2021-22/2562 Date 22.11.2021) | 23-11-2021 | 30-11-2021 | 30-11-2021 | 30-11-2021 | 04:30 PM | Active | और देखें |
44. | Minor repair works comprising of replacement of old worn out and damaged windows with three track aluminium sliding windows for C-Type quarters at Dongri Buzurg Mine.(DB/Civil/2021-22/2563 Date 22.11.2021) | 23-11-2021 | 30-11-2021 | 30-11-2021 | 30-11-2021 | 04:30 PM | Active | और देखें |
45. | Development and beautification of garden at New Medical Administrative building at Chikla Mine(CIVIL/CH/T.E./21-22/2811) | 20-11-2021 | 06-12-2021 | 06-12-2021 | 06-12-2021 | 04:30 PM | Active | और देखें |
46. | WEBSITE SINGLE/ PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR OVIS MAKES - 4 AND 3 TON BATTERYD/DIESEL OPERATED LOCOMOTIVES.(PUR/MOIL/C-5/44/E- 60/155 -M Dt.20/11/2021) | 20-11-2021 | 13-12-2021 | 13-12-2021 | 13-12-2021 | 03:30 PM | Active | और देखें |
47. | Cleaning of Workshop premises of Dongri Buzurg Mine.(DB/MECH/20-21/AGENT/1159) | 19-11-2021 | 27-11-2021 | 27-11-2021 | 27-11-2021 | 04:30 PM | Active | और देखें |
48. | Fabrication of Guide Rollers for Tub Tipplers at Chikla Mine.(TE/CH/MECH/21-22/19065/1146) | 19-11-2021 | 24-11-2021 | 24-11-2021 | 24-11-2021 | 03:30 PM | Active | और देखें |
49. | EXPRESSION OF INTEREST FOR THE TRANSFER OF TECHNOLOGY FOR PRODUCTION OF ELECTROLYTIC MANGANESE METAL (EMM) AND/ OR DESIGN AND CONSTRUCTION OF A NEW ELECTROLYTIC MANGANESE METAL (EMM) PLANT(SMG/EMM-EOI/21-22/01) | 18-11-2021 | 18-01-2022 | 18-01-2022 | 18-01-2022 | 03:30 PM | Active | और देखें |
50. | Purchase of PEARL COKE with Transportation - 6600 MT(MOIL/21-22/ET-83 dt.17.11.2021) | 17-11-2021 | 07-12-2021 | 07-12-2021 | 08-12-2021 | 03:30 PM | Active | और देखें |
51. | OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/1047) | 16-11-2021 | 18-11-2021 | 18-11-2021 | 18-11-2021 | 03:30 PM | Active | और देखें |
52. | Providing and Supplying of Drive Sinamics G120 55KW Heavy Duty Power Module As per Annexure A(PUR/MOIL/2021-22/1890) | 16-11-2021 | 30-11-2021 | 30-11-2021 | 30-11-2021 | 04:30 PM | Active | और देखें |
53. | Fabrication of Hose Fittings required in Underground at Balaghat Mine.(AGT/BGT/MECH/HO-FIT/21-22/1042) | 15-11-2021 | 30-11-2021 | 30-11-2021 | 30-11-2021 | 04:30 PM | Active | और देखें |
54. | Cleaning of accumulated sand from UG50L and UG150L at Kandri Mine.(KD/MINES/NIT/2021-22/2520) | 11-11-2021 | 22-11-2021 | 22-11-2021 | 22-11-2021 | 04:30 PM | Active | और देखें |
55. | Purchase of Black Gitti for U/G concreting at Kandri Mine(KD/MINES/NIT/2021-22/2482) | 10-11-2021 | 19-11-2021 | 19-11-2021 | 19-11-2021 | 04:30 PM | Active | और देखें |
56. | Repairing of Worn Our Wheels 50nos.and Axle Shaft 30nos of GB Car Deployed in Underground Levels of Balaghat Mine.(AGT/BGT/MECH/GB-CAR/21-22/1032) | 10-11-2021 | 18-11-2021 | 18-11-2021 | 18-11-2021 | 04:30 PM | Active | और देखें |
57. | Fabrication of Hydraulic Power Pack with Intercooler Assy. for Secondary Brake/ Thruster Brake at Holmes Shaft Cage winder-350 HP. of Balaghat Mine.(AGT/BGT/MECH/WINDER/21-22/1031) | 10-11-2021 | 15-11-2021 | 15-11-2021 | 15-11-2021 | 04:30 PM | Active | और देखें |
58. | TENDER DOCUMENTS FOR INSTALLATION AND COMMISSIONING OF 11KV HT VCB PANEL 6TH LEVEL SURFACE SUBSTATION AT BALAGHAT MINE.(BGT/TE/ELECT/AJGM/21-22/1025) | 09-11-2021 | 15-11-2021 | 15-11-2021 | 15-11-2021 | 03:30 PM | Active | और देखें |
59. | PURCHASE ESE LIGHTING ARRESTOR FOR KANDRI MINE(PUR/KD/ELECT/21-22/ 2451) | 08-11-2021 | 17-11-2021 | 17-11-2021 | 17-11-2021 | 04:30 PM | Active | और देखें |
60. | Repairing of Centre Joint Assy of Tata Hitachi 1200 Hydraulic Excavator operating at Dongri Buzurg Mine Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1102) | 04-11-2021 | 16-11-2021 | 16-11-2021 | 16-11-2021 | 04:30 PM | Active | और देखें |
61. | Repairing of Bucket Cylinder of Tata 450-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1101) | 04-11-2021 | 16-11-2021 | 16-11-2021 | 16-11-2021 | 04:30 PM | Active | और देखें |
62. | Development, Beautification and Horticulture works towards landscaping works for new Medical Administrative Building at Dongri Buzurg Mine.(DB/CIVIL/21-22/2366 Date 02.11.2021) | 04-11-2021 | 12-11-2021 | 12-11-2021 | 12-11-2021 | 04:30 PM | Active | और देखें |
63. | Cutting and cleaning of grass, shrubs Bushes from Residential Premises in Officers Colony, Syndicate Camp and Chandmara Colony at Dongri Buzurg Mine.(DB/CIVIL/21-22/2368 Date 02.11.2021) | 04-11-2021 | 12-11-2021 | 12-11-2021 | 12-11-2021 | 04:30 PM | Active | और देखें |
64. | Carpentry Works, Repair to Furniture, Construction of Runner and Glass works for Mine Managers Cabin at Dongri Buzurg Mine(DB/CIVIL/21-22/2367 Dated 02.11.2021) | 04-11-2021 | 12-11-2021 | 12-11-2021 | 16-11-2021 | 04:30 PM | Active | और देखें |
65. | 15 NOS CHEMICAL EARTH PIT FOR DIFFERENT SURFACE SUBSTATION AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/994) | 01-11-2021 | 08-11-2021 | 08-11-2021 | 08-12-2021 | 03:30 PM | Active | और देखें |
66. | Major Repair of Gear Boxes of Ashok Leyland Tippers MP50-H-1266 and MP-50-H-1267 Operating at Balaghat Mine.(AGENT/BGT/MECH/TIPP/21-22/1007) | 30-10-2021 | 08-11-2021 | 08-11-2021 | 08-11-2021 | 04:30 PM | Active | और देखें |
67. | PURCHASE OF TOP AND BOTTOM ASSEMBLY 2Nos FOR DSM80 by 36 KIRLOSKAR MAKE 60HP PUMP FOR IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/21-22/MECH/1093) | 30-10-2021 | 17-11-2021 | 17-11-2021 | 17-11-2021 | 04:30 PM | Active | और देखें |
68. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MAXFLOW PUMP.(PUR/MOIL/C-5/28 /E-59 /142-M Dt.30/10/2021) | 30-10-2021 | 19-11-2021 | 19-11-2021 | 19-11-2021 | 03:30 PM | Active | और देखें |
69. | Designing Supply Installation and Commissioning of Automatic Fire Detection and Suppression System in EIMCO ELECON Loader(AGENT and JGM/MINES/GRIII/1161) | 29-10-2021 | 10-11-2021 | 10-11-2021 | 15-11-2021 | 04:30 PM | Active | और देखें |
70. | Annual service maintenance contract for winder system installed at various mines for a period of two years.(MOIL/21-22/ET/79) | 27-10-2021 | 26-11-2021 | 26-11-2021 | 26-11-2021 | 03:30 PM | Active | और देखें |
71. | Supply of black Metal(Gitti) for Undergroung concreting work at munsar mine(Mun/Min/NIT/2021-22/1134) | 27-10-2021 | 02-11-2021 | 02-11-2021 | 02-11-2021 | 04:30 PM | Active | और देखें |
72. | Transportation Unloading of ROM Rock Tubs from Vertical Shaft to OCF Return of empty tubs to UG at Beldongri Mine(BEL/MIN/2021-22/1726) | 25-10-2021 | 01-11-2021 | 01-11-2021 | 01-11-2021 | 04:30 PM | Active | और देखें |
73. | Construction of parking shed at BDC OCF and Administrative building premises at Gumgaon Mine(MOIL/21-22/ET/74) | 25-10-2021 | 12-11-2021 | 12-11-2021 | 12-11-2021 | 03:30 PM | Active | और देखें |
74. | Construction of boundry wall around Mine lease area at Tirodi and Sitapatore Mines(MOIL/21-22/ET/76) | 25-10-2021 | 12-11-2021 | 12-11-2021 | 12-11-2021 | 03:30 PM | Active | और देखें |
75. | Construction of boundry wall Retaining wall and Drain near Ferro Manganese plant Office at Balaghat Mine(MOIL/21-22/ET/78) | 25-10-2021 | 12-11-2021 | 12-11-2021 | 12-11-2021 | 03:30 PM | Active | और देखें |
76. | Construction of Pit office beside Vertical Shaft at Kandri Mines(MOIL/21-22/ET/80) | 25-10-2021 | 12-11-2021 | 12-11-2021 | 12-11-2021 | 03:30 PM | Active | और देखें |
77. | Construction of 100000 Liters Capacity Circular Ground Service Reservoir near Sand Stowing Plant at Ukwa Mine(MOIL/21-22/ET/81) | 25-10-2021 | 12-11-2021 | 12-11-2021 | 12-11-2021 | 03:30 PM | Active | और देखें |
78. | Construction of shed to preserve core boxes at Pani Mines GMDC Ltd Manganese project District Chhota Udepur of Gujrat State(MOIL/21-22/ET/75) | 25-10-2021 | 12-11-2021 | 12-11-2021 | 12-11-2021 | 03:30 PM | Active | और देखें |
79. | Painting of various structures of Winding Engine Installations , Waste Rock bunker and spillage bunker(AGENT/BGT/MECH/WIN/21-22/2915) | 22-10-2021 | 11-11-2021 | 11-11-2021 | 11-11-2021 | 04:30 PM | Active | और देखें |
80. | PURCHASE OF COMPLETE WHEEL AND AXLE ASSEMBLY WITH BEARING AND COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE.(PUR/MOIL/BGT/GB CAR/21-22/972) | 21-10-2021 | 25-10-2021 | 25-10-2021 | 25-10-2021 | 04:30 PM | Active | और देखें |
81. | Purchase of Hose Fittings for Rock Drill and Air Leg Machines(MOIL/21-22/ET-82,Dt.21/10/2021) | 21-10-2021 | 11-11-2021 | 11-11-2021 | 12-11-2021 | 03:30 PM | Active | और देखें |
82. | PURCHASE OF SPARES FOR ATLAS COPCO MAKE COMPRESSOR.(PUR/MOIL/C-5/40 /E-58 / 138-M Dt.20/10/2021) | 20-10-2021 | 09-11-2021 | 09-11-2021 | 10-11-2021 | 03:30 PM | Active | और देखें |
83. | PURCHASE OF HIGH PRESSURE MULTISTAGE WATER PUMP KSB MAKE QTY 2 NOS MOVI 32/6(MOIL/EMD/CH/AJGM/21-22/1013) | 19-10-2021 | 09-11-2021 | 09-11-2021 | 09-11-2021 | 04:30 PM | Active | और देखें |
84. | PURCHASE OF SOLID TYRE 10.00 X 20-4nos., MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD (Loader) MACHINE IN UNDREGROUND OF BALAGHAT MINE(PUR/MOIL/BGT/Sol-Tyr/21-22/960) | 18-10-2021 | 25-10-2021 | 25-10-2021 | 25-10-2021 | 04:30 PM | Active | और देखें |
85. | PURCHASE OF SPARES FOR SIEMENS MAKE PLC PANEL OF WINDER FOR GUMGAON MINE (M.S).(PUR/MOIL/C-3/13/E-57/136-M Dt.18/10/2021) | 18-10-2021 | 03-11-2021 | 03-11-2021 | 03-11-2021 | 03:30 PM | Active | और देखें |
86. | Interior Renovation for Toilet adjacent to Conference Hall at Main Administrative Building of Dongribuzurg Mine(DB/CIVIl/2021-22/ Dated 15.10.2021) | 16-10-2021 | 22-10-2021 | 22-10-2021 | 22-10-2021 | 04:30 PM | Active | और देखें |
87. | PURCHASE OF SPARES FOR SULLAIR COMPRESSOR.(PUR/MOIL/C-5/73 /E- 56 / 132 -M ,Dt.16/10/2021) | 16-10-2021 | 06-11-2021 | 06-11-2021 | 08-11-2021 | 03:30 PM | Active | और देखें |
88. | Purchase of Site Mixed Emulsion (SME).(WE-9 Dt 16.10.2021(e-Tender NO.MOIL/21-22/ET/77)) | 16-10-2021 | 25-10-2021 | 25-10-2021 | 26-10-2021 | 03:30 PM | Active | और देखें |
89. | Interior Renovation works for Mine Managers Cabin at Dongri Buzurg Mine(DB/Civil/2021-22/ Dated 12.10.2021) | 15-10-2021 | 19-10-2021 | 19-10-2021 | 19-10-2021 | 04:30 PM | Active | और देखें |
90. | Providing and Installation of Tyre Washing System at Dongri Buzurg Mine(DB/CIVIL/2021-22/2095 Dated 12.10.2021) | 15-10-2021 | 22-10-2021 | 22-10-2021 | 22-10-2021 | 04:30 PM | Active | और देखें |
91. | Supply of Tools for Chikla and Dongri(PUR/MOIL/CH/820) | 14-10-2021 | 11-11-2021 | 11-11-2021 | 11-11-2021 | 04:30 PM | Active | और देखें |
92. | CLEANING OF SPILLAGE ORE AND FINES FROM VARIOUS PLACES OF IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/IMB/21-22 /996) | 13-10-2021 | 29-10-2021 | 29-10-2021 | 29-10-2021 | 04:30 PM | Active | और देखें |
93. | Installation and commissioning of Automatic Fire Detection and Suppression System in Eimco Elecon Front End Wheel Loader Model AL520Z at Gumgaon Mine(AGENT/GM/MECH/21-22/1062) | 13-10-2021 | 02-11-2021 | 02-11-2021 | 02-11-2021 | 04:30 PM | Active | और देखें |
94. | Muffle Blasting work and ANFO filling work AT DONGRI BUZURG MINE(DB/Blasting /21-22/991) | 12-10-2021 | 20-10-2021 | 20-10-2021 | 20-10-2021 | 04:30 PM | Active | और देखें |
95. | Supply of Incremental Encoder(ELECT/MUN/ADGM/21-22/1072, Dated - 10.10.2021) | 11-10-2021 | 23-10-2021 | 23-10-2021 | 23-10-2021 | 04:30 PM | Active | और देखें |
96. | Grass Seed Plantation Program in waste dump benches stabilization of mine area for the Compliance of Condition stipulated in Environmental Clearance and as per guideline of Indian Bureau of Mine at Chikla Mine(CIVIL/CH/T.E./21-22/989) | 11-10-2021 | 25-10-2021 | 25-10-2021 | 25-10-2021 | 04:30 PM | Active | और देखें |
97. | Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas(MOIL/21-22/ET-73 dt.11.10.2021) | 11-10-2021 | 25-10-2021 | 25-10-2021 | 26-10-2021 | 03:30 PM | Active | और देखें |
98. | WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF C CLASS FASTENERS-II MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-MOIL/CH/819/FastenerPart-II) | 10-10-2021 | 25-10-2021 | 25-10-2021 | 25-10-2021 | 04:30 PM | Active | और देखें |
99. | Supply of Multi Axis Controller Joystick equivalent to V11(ELECT/MUN/ADGM/21-22/1063, Dated - 08.10.2021) | 09-10-2021 | 22-10-2021 | 22-10-2021 | 22-10-2021 | 04:30 PM | Active | और देखें |
100. | PURCHASE OF 1200mm SWEEP CEILING FAN NOS.100, FOR BALAGHAT MINE(GT/TE/ELECT/AJGM/21-22/910) | 07-10-2021 | 13-10-2021 | 13-10-2021 | 13-10-2021 | 03:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |