Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Cleaning of Workshop and its premises dusting and collection of dust at Dongri Buzurg Mine(GR-II/DB/MECH/16-17/205) 11-06-2016 18-06-2016 18-06-2016 18-06-2016 4:30 PM Active View
2. Cleaning of various tanks at leaching section and stripping emd flakes at emd plant(MOIL/EMD/CH/ADGM/2016-17/204 Dt 09/06/2016) 11-06-2016 22-06-2016 22-06-2016 22-06-2016 4:30 PM Active View
3. PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-5/28/E-13/493-M) 10-06-2016 24-06-2016 24-06-2016 24-06-2016 3:30 PM Active View
4. Recovery of SM Grade ore from Viraswami waste dump at Tirodi Mine( GR.-II/SDGM(M)/CONT/R-DUMP/17/TRD/2016-17/14) 10-06-2016 20-06-2016 20-06-2016 20-06-2016 3:30 PM Active View
5. Handling of boulders and cleaning of grizzly at bunker of IMB plant at Dongri Buzurg Mine(GR.-II/SDGM(M)/CONT/Boulder-Br/16/DB/2016-17/13) 10-06-2016 20-06-2016 20-06-2016 20-06-2016 3:30 PM Active View
6. ISI MARKED CHAIN PULLEY BLOCKS - 19 NOS. (3 TON CAP. - 13 NOS AND 5 TON CAP. - 6 NOS.) (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-48 DT.10/06/2016, e-TENDER NO.MOIL/16-17/ET/46) 10-06-2016 07-07-2016 07-07-2016 07-07-2016 3:30 PM Active View
7. ISI MARKED CHAIN PULLEY BLOCKS - 19 NOS. (3 TON CAP. - 13 NOS AND 5 TON CAP. - 6 NOS.) (AS PER ANNEXURE - C ENCLOSED)( WE-48 DT.10/06/2016, e-TENDER NO.MOIL/16-17/ET/46) 10-06-2016 07-07-2016 07-07-2016 07-07-2016 3:30 PM Active View
8. PNEUMATICALLY OPERATED DOUBLE DIAPHRAGM PUMPS FOR VARIOUS MINES - 14 NOS. (AS PER ANNEXURE - C ENCLOSED)(WE-46 DT.09/06/2016, e-TENDER NO.MOIL/16-17/ET/44) 09-06-2016 30-06-2016 30-06-2016 30-06-2016 3:30 PM Active View
9. ANCHORAGE TESTING MACHINES FOR VARIOUS MINES - 7 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-47 DT.09/06/2016, e-TENDER NO.MOIL/16-17/ET/45) 09-06-2016 30-06-2016 30-06-2016 30-06-2016 3:30 PM Active View
10. Retilling of Camp Quarters at Chikla Mine.(TE/CH/CIVIL/16-17/186) 08-06-2016 13-06-2016 13-06-2016 13-06-2016 4:30 PM Active View
11. Various miscellaneous contract works at EMD Plant Dongri Buzurg Mine(SDGM (MECH)/EMD/16-17/01) 08-06-2016 20-06-2016 20-06-2016 20-06-2016 3:30 PM Active View
12. Purchase of Valve Less DTH Hammer Drill Bits and Drill Pipe for DI 500 Drilling Machine(PUR/MOIL/C-5/75/WE-37 (MOIL/16-17/ET/40)) 08-06-2016 08-07-2016 08-07-2016 08-07-2016 3:30 PM Active View
13. PURCHASE OF VEHICLE/INVERTER BATTERIES - 9 ITEMS( WE-43 Dt.08/06/2016 (e-Tender No.MOIL/16-17/ET/39)) 08-06-2016 13-07-2016 13-07-2016 13-07-2016 3:30 PM Active View
14. PURCHASE OF CUP SHAPE GRINDING WHEEL(WE-45 Dt.08/06/2016(e-Tender No. MOIL/16-17/ET-42)) 08-06-2016 13-07-2016 13-07-2016 13-07-2016 3:30 PM Active View
15. Jaw Plates for Sayaji Make Jaw Crushers(PUR/MOIL/C-5//30/WE-28/370-M (MOIL/16-17/ET/43)) 08-06-2016 11-07-2016 11-07-2016 11-07-2016 3:30 PM Active View
16. PURCHASE OF RUBBER AIR HOSE - 5 ITEMS(WE-44 Dt.08/06/2016 (e-Tender No.MOIL/16-17/ET/41)) 08-06-2016 15-07-2016 15-07-2016 15-07-2016 3:30 PM Active View
17. PURCHASE OF RUBBER AIR HOSE - 5 ITEMS(WE-44 Dt.08/06/2016 (e-Tender No.MOIL/16-17/ET/41)) 08-06-2016 20-07-2016 20-07-2016 20-07-2016 03:30 PM Active View
18. PURCHASE OF AUTODESK AUTOCAD 2016(PUR/MOIL/C-4/138/E-12/463-M DT.07/06/2016) 07-06-2016 27-06-2016 27-06-2016 27-06-2016 3:30 PM Active View
19. BLANKET RATE CONTRACT FOR ONE YEAR FOR SUPPLY OF VARIOUS SPARES FOR SANDVIK SURFACE DRILL MACHINE MODEL DI500(PUR/MOIL/C-5/75/E-10/399-M) 07-06-2016 22-06-2016 22-06-2016 22-06-2016 3:30 PM Active View
20. Renovation Works for Mine Manager Bungalow at Balaghat Mine(83/Civil/BGT/16-17/1798 Date 05.06.2016) 06-06-2016 13-06-2016 13-06-2016 13-06-2016 4:30 PM Active View
21. Cleaning of spillage material under and around all the equipment of Integrated Manganese Beneficiation Plant at Balaghat Mine.(Agent DGM(M)/Mining/BGT/16-17/1756 Date 03.06.2016) 06-06-2016 13-06-2016 13-06-2016 13-06-2016 4:30 PM Active View
22. REPAIR OF WATER SUPPLY PIPELINE FROM BHATERA PUMP STATION TO BALAGHAT AND INSTALLATION OF AIR VALVE AT BHATERA PUMP STATION(83/Civil/BGT/16-17/1303 Date 20.05.2016) 06-06-2016 20-06-2016 20-06-2016 20-06-2016 4:30 PM Active View
23. Sinking of four winzes from minus 30 ft level and minu 130 ft level by Drop Raising Method at Munsar Mine(SDGM(M)-III/CONT/09/WINZE/MUN/2016-17/16) 06-06-2016 14-06-2016 14-06-2016 14-06-2016 3:30 PM Active View
24. supply of Size good quality black gitti for UG concreting at Chikla Mine.(TE/CH/UG/MINE/16-17/128) 04-06-2016 09-06-2016 09-06-2016 09-06-2016 4:30 PM Active View
25. Providing, Supplying and Installation of 60 W LED Street fitting at Gumgaon Mine(GM/Elect/TEN/16-17/677, Dated - 02.06.2016N) 04-06-2016 15-06-2016 15-06-2016 15-06-2016 3:30 PM Active View
26. TILTING TUBS FOR VARIOUS MINES - 360 NOS. (I.E 24 CFT TUBS, TRB TYPE - FOR MP MINES - 170 NOS.AND FOR MAHARASHTRA MINES - 190 NOS) (AS PER ANNEXURE - C ENCLOSED)(WE-17 DT.03/06/2016, e-TENDER NO.MOIL/16-17/ET/38) 03-06-2016 14-07-2016 14-07-2016 14-07-2016 3:30 PM Active View
27. Designing and printing of Full Annual Report(s)-2015-16 as per details given in tender documents(CS/ARP-2015-16-PRT) 02-06-2016 23-06-2016 23-06-2016 23-06-2016 4:00 PM Active View
28. CABLE BOLTING MACHINE FOR VARIOUS MINES - 7 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-23 DT.02/06/2016, e-TENDER NO.MOIL/16-17/ET/37) 02-06-2016 04-07-2016 04-07-2016 04-07-2016 3:30 PM Active View
29. DISPATCH WORK OF ANNUAL REPORT AND ABRIDGED FINANCIAL STATEMENTS FOR 2015-16 OF MOIL LIMITED(CS/ ARP-2015-16-Dispatch) 02-06-2016 11-07-2016 11-07-2016 11-07-2016 4:00 PM Active View
30. e-Procurement of Miners Canvas Safety Boots -3500 Pairs(WE-32, e-tender No.MOIL/16-17/ET-35, Dt.02.06.2016) 02-06-2016 14-07-2016 14-07-2016 14-07-2016 3:30 PM Active View
31. e-Procurement of C.I.Ball Valves - 4 items(WE-33, e-tender No.MOIL/16-17/ET-36, Dt.02.06.2016) 02-06-2016 14-07-2016 14-07-2016 14-07-2016 3:30 PM Active View
32. Removal of old dump and handling the waste rock at various dump at Munsar Mine (SDGM(M)-III/CONT/12/OCD/MUN/16-17/15) 01-06-2016 09-06-2016 09-06-2016 09-06-2016 3:30 PM Active View
33. Washing and neutralization of sludge (MOIL/EMD/CH/AGDM/2016-17/190) 01-06-2016 18-06-2016 18-06-2016 18-06-2016 4:30 PM Active View
34. BATTERY LOCOMOTIVES, CAPACITY 3 TON - 2 NOS. AND 4 TON - 2 NOS. FOR VARIOUS MINES (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-21 DT.31/05/2016, e-TENDER NO.MOIL/16-17/ET/33) 01-06-2016 01-07-2016 01-07-2016 01-07-2016 3:30 PM Active View
35. CRAWLER MOUNTED SIDE DUMP LOADER - 2 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-24 DT.01/06/2016, e-TENDER NO.MOIL/16-17/ET/34) 01-06-2016 01-07-2016 01-07-2016 01-07-2016 3:30 PM Active View
36. Manual winzing from minus 30 ft level to minus 130 ft level at Munsar Mine(SDGM(M)-III/CONT/02/WINZE/MUN/16-17/14) 31-05-2016 07-06-2016 07-06-2016 07-06-2016 3:30 PM Active View
37. Recovery of SM Grade ore (SPL-463) from waste dumps at Sitapatore Mine(GR.-II/SDGM(M)/CONT/R-DUMP/18/SITA/2016-17/11) 31-05-2016 10-06-2016 10-06-2016 10-06-2016 03:30 PM Active View
38. Recovery of LGHS ore and SM grade ore from 320 feet Level North dump at Chikla Mine.(GR.-II/SDGM(M)/CONT/R-DUMP/9/CH/2016-17/12) 31-05-2016 10-06-2016 10-06-2016 10-06-2016 3:30 PM Active View
39. e procurement of HDPE Pipes, Bends and Pipe Ends 10 Items(WE-11, e-tender No.MOIL/16-17/ET-20, Dt.31.05.2016) 31-05-2016 30-06-2016 30-06-2016 30-06-2016 3:30 PM Active View
40. Maintenance of Garden at Rest House, Canteen, South Staff Garden and Manager Bunglow etc.(TRD/CIVIL/HO/2016-17/583A, 24.5.2016) 30-05-2016 07-06-2016 07-06-2016 07-06-2016 10:00 AM Active View
41. Augmentation of 33 KV Outdoor and 11 KV Indoor Substation of Ukwa Mine, Dist. Balaghat (MP).(DGM(E)/3/ UKW/16-17/ 52) 30-05-2016 12-07-2016 12-07-2016 12-07-2016 3:30 PM Active View
42. HT VCB PANEL VARIOUS TYPES-12 SETS (AS PER ANNEXURE - C ENCLOSED)(WE-16 DT 30/05/16, E-TENDER NO. MOIL/16-17/32) 30-05-2016 04-07-2016 04-07-2016 04-07-2016 3:30 PM Active View
43. PURCHASE OF SPARES FOR STERLING WILSON MAKE DG SET(PUR/MOIL/C-5/47/E-115/2474-M) 27-05-2016 15-06-2016 15-06-2016 15-06-2016 3:30 PM Active View
44. MOBILE LIGHTING TOWER 9 MTR.HEIGHT WITH 5 KVA GENERATOR SET - 5 NOS. (AS PER ANNEXURE - C ENCLOSED)(WE-7 DT.27/05/2016, e-TENDER NO.MOIL/16-17/ET/30) 27-05-2016 28-06-2016 28-06-2016 28-06-2016 3:30 PM Active View
45. TCT DRILL RODS - 4 ITEMS(WE-18 DT.27/05/2016(e-tender no. MOIL/16-17/ET/31)) 27-05-2016 12-07-2016 12-07-2016 12-07-2016 3:30 PM Active View
46. Limited Tender for Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPS(BGT/SYSTEM/AMC/2016-17/1444) 26-05-2016 02-06-2016 02-06-2016 02-06-2016 4:00 PM Active View
47. Replacement of buntons of Holmes Shaft Skip Compartment from 4th Level to 6th Level Balaghat Mine(BGT/ENGG/16-17/1299A Date 20.05.2016) 26-05-2016 10-06-2016 10-06-2016 10-06-2016 5:00 PM Active View
48. Fabrication of steel rings 1.80m diax0.80m height for Underground Offsetting works at Balaghat Mine(BGT/ENGG/16-17/1248 Date 18.05.2016) 26-05-2016 10-06-2016 10-06-2016 10-06-2016 5:00 PM Active View
49. Repairing of corroded chequered plates of floor area of picking belt and BC 14 conveyor belt at IMB Plant and Production Shaft Pit Top(BGT/ENGG/16-17/1284 Date 19.05.2016) 26-05-2016 08-06-2016 08-06-2016 08-06-2016 5:00 PM Active View
50. Removal of old dump and handling the waste rock at Munsar Mine (MOIL/2016-17/ET/24) 26-05-2016 29-06-2016 29-06-2016 29-06-2016 3:30 PM Active View
51. Removal of Waste Rock and Mn rock at 50 ft level O/C section at Kandri mine (MOIL/2016-17/ET/23) 26-05-2016 29-06-2016 29-06-2016 29-06-2016 3:30 PM Active View
52. e-procurement of Butterfly Valves-3 items (L and T/AUDCO Make).(WE-30, e-tender No.MOIL/16-17/ET-29, Dt.26.05.2016) 26-05-2016 30-06-2016 30-06-2016 30-06-2016 3:30 PM Active View
53. SPLIT AIR CONDITIONER 1.5 TON CAPACITY - 1 NO. AND 2 TON CAPACITY - 5 NOS. FOR CORPORATE OFFICE MOIL LTD NAGPUR (AS PER ANNEXURE - C ENCLOSED)(WE-29 DT.25/05/2016, e-TENDER NO.MOIL/16-17/ET/28) 25-05-2016 01-06-2016 01-06-2016 01-06-2016 3:30 PM Active View
54. Recovery of LGHS ore and SM grade ore from 320 feet Level South dump at Chikla Mine.(GR.-II/SDGM(M)/CONT/R-DUMP/2/CH/2016-17/10) 25-05-2016 03-06-2016 03-06-2016 03-06-2016 3:30 PM Active View
55. SPLIT AIR CONDITIONER 1.5 TON CAPACITY - 1 NO. AND 2 TON CAPACITY - 5 NOS. FOR CORPORATE OFFICE MOIL LTD NAGPUR (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-29 DT.25/05/2016, e-TENDER NO.MOIL/16-17/ET/28) 25-05-2016 03-06-2016 03-06-2016 03-06-2016 3:30 PM Active View
56. Recovery of LGHS lumpy ore and SM grade ore from waste dump near Sidha Baba Mandir at Tirodi Mine.(GR.-II/SDGM(M)/CONT/R-DUMP/5/TRD/2016-17/9) 25-05-2016 03-06-2016 03-06-2016 03-06-2016 3:30 PM Active View
57. PURCHASE OF SLURRY TRANSFER HOSE(PUR/MOIL/C-11/30/E-8/358-M) 25-05-2016 08-06-2016 08-06-2016 08-06-2016 3:30 PM Active View
58. FULLY AUTOMATIC STAR DELTA STARTER WITH ACCESSORIES - 34 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-8 DT.24/05/2016, e-TENDER NO.MOIL/16-17/ET/25) 25-05-2016 29-06-2016 29-06-2016 29-06-2016 3:30 PM Active View
59. Fabrication of various crossings at various levels of Vertical Shaft at Munsar Mine(A-III/MUN/16-17/635) 25-05-2016 14-06-2016 14-06-2016 14-06-2016 4:00 PM Active View
60. e procurement of G I Pipes of assorted sizes 6 Items(WE-12, e-tender No.MOIL/16-17/ET-27, Dt.25.05.2016) 25-05-2016 28-06-2016 28-06-2016 28-06-2016 3:30 PM Active View
61. Comprehensive Annual Maintenance of Computers, Printers,UPS and LAn at GR-II Mines.(TE/CH/SYSTEM/AMC/2016-17/1) 24-05-2016 31-05-2016 31-05-2016 31-05-2016 4:00 PM Active View
62. Underground concreting work at -270 feet L and -370 feet L of vertical section at Chikla Mine(GR.-II/SDGM(M)/CONT/UG-CONC/11/CH/2016-17/8) 24-05-2016 03-06-2016 03-06-2016 03-06-2016 3:30 PM Active View
63. Supplying, providing, and installation of protection with Alarm System for Centralized Data Centre of ERP at Corporate Office, Nagpur(DGM(E)/86/ HO/16-17/ 48) 24-05-2016 02-06-2016 02-06-2016 02-06-2016 3:30 PM Active View
64. PURCHASE OF AGRICO IMPLEMENTS (MAKE TATA STEEL LIMITED ONLY).(PUR/MOIL/C-1/196/E-07/355-M dt.24.05.2016) 24-05-2016 15-06-2016 15-06-2016 15-06-2016 3:30 PM Active View
65. Repairing of Air Conditioning Unit of Heavy earth Moving Machineries Operating at Dongri Buzurg Mine(A-II/CHK/DB/16-17/133 dtd 23.05.2016) 23-05-2016 31-05-2016 31-05-2016 31-05-2016 4:30 PM Active View
66. Cleaning, collection and stacking of fines at Kandri Mine(SDGM(M)-III/CONT/10/FINES/KAN/2016-17/13) 23-05-2016 31-05-2016 31-05-2016 31-05-2016 3:30 PM Active View
67. Picking and collection of SM grade Mn ore from dumps at Munsar Mine(SDGM(M)-III/CONT/07/DUMP/MUN/2016-17/12) 23-05-2016 31-05-2016 31-05-2016 31-05-2016 3:30 PM Active View
68. Recovery of Ferro grade, LGHS and SM Grade ore from North magazine dump (waste dump) at Tirodi Mine.(GR.-II/SDGM(M)/CONT/R-DUMP/6/TRD/2016-17/4) 23-05-2016 02-06-2016 02-06-2016 02-06-2016 3:30 PM Active View
69. Recovery of LGHS and SM Grade ore from North waste dump at Tirodi Mine(GR.-II/SDGM(M)/CONT/R-DUMP/4/TRD/2016-17/5) 23-05-2016 02-06-2016 02-06-2016 02-06-2016 3:30 PM Active View
70. Underground vertical development for second outlet at vertical section of Chikla Mine(GR.-II/SDGM(M)/CONT/UG-DEV/3/CH/2016-17/6) 23-05-2016 02-06-2016 02-06-2016 02-06-2016 3:30 PM Active View
71. Recovery OF SM Grade ore from South Side of South staff quarters dump (waste dump) at Tirodi Mine(GR.-II/SDGM(M)/CONT/R-DUMP/10/TRD/2016-17/7) 23-05-2016 02-06-2016 02-06-2016 02-06-2016 3:30 PM Active View
72. Rate Contract for rewinding of LT Motors(Upto 25HP) for a period of 1oneYears at Balaghat Mine.(Elect/BGT/Rewinding/16-17/1307 Date 20.05.2016) 23-05-2016 20-06-2016 20-06-2016 20-06-2016 4:30 PM Active View
73. Raking of raw materials and preparation of sand bed for casting of metal and slag at Ferro Manganese Plaant Balaghat Mine(SDGM (MECH)/FMP/16-17/01) 23-05-2016 15-06-2016 15-06-2016 15-06-2016 3:30 PM Active View
74. L.T.ACB PANEL FOR VARIOUS MINES (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-15 DT.23/05/2016, e-TENDER NO.MOIL/16-17/ET/22) 23-05-2016 29-06-2016 29-06-2016 29-06-2016 3:30 PM Active View
75. Providing manpower for maintenance of under ground machineries for twelve months,(A-III/MUN/GUM/16-17/495) 20-05-2016 30-05-2016 30-05-2016 30-05-2016 4:30 PM Active View
76. DISMENTALING OF IPS FLOOR(TRD/CIVIL/A/2016-17/529, DT. 10.5.16) 19-05-2016 25-05-2016 25-05-2016 25-05-2016 11:55 AM Active View
77. Waterproofing works by means of laying Dr.Fixit Torchshield to roof of Electrical Substation Building at 6th Level, Balaghat Mine.(83/Civil/BGT/16-17/1244 Date 18.05.2016) 19-05-2016 25-05-2016 25-05-2016 25-05-2016 4:30 PM Active View
78. DISMENTALING OF IPS FLOOR(TRD/CIVIL/A/2016-17/529, DT. 10.5.16) 19-05-2016 25-05-2016 25-05-2016 25-05-2016 12:10 PM Active View
79. PRE STRESSED STEEL WIRE ROPE(WE-10 DT.19/05/2016(e-tender no. MOIL/16-17/et/21)) 19-05-2016 24-06-2016 24-06-2016 24-06-2016 3:30 PM Active View
80. Pneumatic Tyre, Tube and Flaps and Solid Tyres(WE-19 DT.19/05/2016(e-Tender No. MOIL/16-17/ET/19)) 19-05-2016 27-06-2016 27-06-2016 27-06-2016 3:30 PM Active View
81. Picking and collection of SM grade Mn ore from dumps at Munsar Mine(SDGM(M)-III/CONT/42/DUMP/MUN/2016-17/11) 18-05-2016 21-06-2016 21-06-2016 21-06-2016 3:30 PM Active View
82. Fabrication of Steel Orepasses and Steel manways for Balaghat Mine(SDGM (MECH)/Tender-Orepass/BGT/16-17/85) 18-05-2016 22-06-2016 22-06-2016 22-06-2016 3:30 PM Active View
83. Fabrication of Steel Orepasses and Steel manways for Kandri Mine(SDGM (MECH)/Tender-Orepass/KND/16-17/87) 18-05-2016 22-06-2016 22-06-2016 22-06-2016 3:30 PM Active View
84. Fabrication of Steel Orepasses and Steel manways for Chikla Mine (SDGM (MECH)/Tender-Orepass/CHK/16-17/86) 18-05-2016 22-06-2016 22-06-2016 22-06-2016 3:30 PM Active View
85. Rate contract for Repairing and retreading of vehicle and OTR Tyres(WE- 9 Dt. 18/05/16(e -Tender No.MOIL/16-17/ET/18)) 18-05-2016 30-06-2016 30-06-2016 30-06-2016 3:30 PM Active View
86. Supplying, providing, and installation of Biometric Access Control System for Data Centre of ERP at Corporate Office, Nagpur.(DGM(E)/86/ HO/16-17/ 40) 17-05-2016 25-05-2016 25-05-2016 25-05-2016 3:30 PM Active View
87. PICKING AND COLLECTION OF MATERIAL AT UKWA MINE (Gr.-I/GM(Sand E)/CONT/R-DUMP/34/UK/2016-17/3) 17-05-2016 26-05-2016 26-05-2016 26-05-2016 3:30 pm Active View
88. Various miscellaneous contract works at EMD Plant Dongri Buzurg Mine (SDGM (MECH)/EMD/16-17/01) 17-05-2016 07-06-2016 07-06-2016 07-06-2016 3:30 PM Active View
89. PROCESS PUMPS WITHOUT MOTOR FOR EMD PLANT, DONGRI BUZURG MINE - 2 NOS. (AS PER ANNEXURE - C ENCLOSED). (WE-27 DT.17/05/2016, e-TENDER NO.MOIL/16-17/ET/17) 17-05-2016 07-06-2016 07-06-2016 07-06-2016 3:30 PM Active View
90. PURCHASE OF SAFETY HELMETS FROM MSE FIRMS ONLY (PUR/MOIL/C-1/189/E-5/290-M Dt. 17/05/2016) 17-05-2016 08-06-2016 08-06-2016 08-06-2016 3:30 pm Active View
91. UNDERGROUND DEVELOPMENT AT 12TH L (SOUTH SECTION) AT BALAGHAT MINE (MOIL/16-17/ET/16) 17-05-2016 22-06-2016 22-06-2016 22-06-2016 3:30 pm Active View
92. UNDERGROUND DEVELOPMENT AT -270 feet L AND -370 feet LEVEL OF VERTICAL SECTION AT CHIKLA MINE ( MOIL/16-17/ET/14 ) 17-05-2016 28-06-2016 28-06-2016 28-06-2016 3:30 pm Active View
93. ANNUAL REPAIRING OF SCHOOL BUS 5 NOS OF DONGRI BUZURG MINE(A-II/CHK/DB/16-17/106 dtd 14.05.2016) 16-05-2016 20-05-2016 20-05-2016 20-05-2016 4:30 PM Active View
94. Trench cutting in ore stacks at Kandri Mine(SDGM(M)-III/CONT/08/TRENCH/KAN/16-17/10)SDGM(M)-III/CONT/08/TRENCH/KAN/16-17/10 16-05-2016 24-05-2016 24-05-2016 24-05-2016 3:30 PM Active View
95. PURCHASE OF LINE INTERACTIVE UPS - 59 NOS. (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/138/E-6/293-M DT.16./05/2016) 16-05-2016 06-06-2016 06-06-2016 06-06-2016 3:30 PM Active View
96. Maintenance of Garden(TRD/CIVIL/HO/2016-17/91, 7.5.2016) 14-05-2016 24-05-2016 24-05-2016 24-05-2016 05:55 PM Active View
97. Desilting and Cleaning of Sump at -100L,-200L,-400L at Gumgaon Mine(GUM/Mining/16-17/473 Dt. 11.05.2016) 13-05-2016 20-05-2016 20-05-2016 20-05-2016 4:30 PM Active View
98. Monsoon Preparation work at Open cast Surface at Gumgaon Mine(GUM/Mining/16-17/472 Dt. 11.05.2016) 13-05-2016 20-05-2016 20-05-2016 20-05-2016 4:30 PM Active View
99. Repair of road dividers and horticultural works for beautification of approach road in front of Agent Office to Guest House at Balaghat Mine.(83/Civil/BGT/16-17/1074 Date 11.05.2015) 12-05-2016 23-05-2016 23-05-2016 23-05-2016 4:30 PM Active View
100. Construction and Installation of Water Filtration Plant at Tirodi Mine.(CIVIL/HO/16-17 /TRD/12) 12-05-2016 24-05-2016 24-05-2016 24-05-2016 3:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.