Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Cleaning of Workshop and its premises dusting and collection of dust at Dongri Buzurg Mine(GR-II/DB/MECH/16-17/205) | 11-06-2016 | 18-06-2016 | 18-06-2016 | 18-06-2016 | 4:30 PM | Active | View |
2. | Cleaning of various tanks at leaching section and stripping emd flakes at emd plant(MOIL/EMD/CH/ADGM/2016-17/204 Dt 09/06/2016) | 11-06-2016 | 22-06-2016 | 22-06-2016 | 22-06-2016 | 4:30 PM | Active | View |
3. | PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-5/28/E-13/493-M) | 10-06-2016 | 24-06-2016 | 24-06-2016 | 24-06-2016 | 3:30 PM | Active | View |
4. | Recovery of SM Grade ore from Viraswami waste dump at Tirodi Mine( GR.-II/SDGM(M)/CONT/R-DUMP/17/TRD/2016-17/14) | 10-06-2016 | 20-06-2016 | 20-06-2016 | 20-06-2016 | 3:30 PM | Active | View |
5. | Handling of boulders and cleaning of grizzly at bunker of IMB plant at Dongri Buzurg Mine(GR.-II/SDGM(M)/CONT/Boulder-Br/16/DB/2016-17/13) | 10-06-2016 | 20-06-2016 | 20-06-2016 | 20-06-2016 | 3:30 PM | Active | View |
6. | ISI MARKED CHAIN PULLEY BLOCKS - 19 NOS. (3 TON CAP. - 13 NOS AND 5 TON CAP. - 6 NOS.) (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-48 DT.10/06/2016, e-TENDER NO.MOIL/16-17/ET/46) | 10-06-2016 | 07-07-2016 | 07-07-2016 | 07-07-2016 | 3:30 PM | Active | View |
7. | ISI MARKED CHAIN PULLEY BLOCKS - 19 NOS. (3 TON CAP. - 13 NOS AND 5 TON CAP. - 6 NOS.) (AS PER ANNEXURE - C ENCLOSED)( WE-48 DT.10/06/2016, e-TENDER NO.MOIL/16-17/ET/46) | 10-06-2016 | 07-07-2016 | 07-07-2016 | 07-07-2016 | 3:30 PM | Active | View |
8. | PNEUMATICALLY OPERATED DOUBLE DIAPHRAGM PUMPS FOR VARIOUS MINES - 14 NOS. (AS PER ANNEXURE - C ENCLOSED)(WE-46 DT.09/06/2016, e-TENDER NO.MOIL/16-17/ET/44) | 09-06-2016 | 30-06-2016 | 30-06-2016 | 30-06-2016 | 3:30 PM | Active | View |
9. | ANCHORAGE TESTING MACHINES FOR VARIOUS MINES - 7 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-47 DT.09/06/2016, e-TENDER NO.MOIL/16-17/ET/45) | 09-06-2016 | 30-06-2016 | 30-06-2016 | 30-06-2016 | 3:30 PM | Active | View |
10. | Retilling of Camp Quarters at Chikla Mine.(TE/CH/CIVIL/16-17/186) | 08-06-2016 | 13-06-2016 | 13-06-2016 | 13-06-2016 | 4:30 PM | Active | View |
11. | Various miscellaneous contract works at EMD Plant Dongri Buzurg Mine(SDGM (MECH)/EMD/16-17/01) | 08-06-2016 | 20-06-2016 | 20-06-2016 | 20-06-2016 | 3:30 PM | Active | View |
12. | Purchase of Valve Less DTH Hammer Drill Bits and Drill Pipe for DI 500 Drilling Machine(PUR/MOIL/C-5/75/WE-37 (MOIL/16-17/ET/40)) | 08-06-2016 | 08-07-2016 | 08-07-2016 | 08-07-2016 | 3:30 PM | Active | View |
13. | PURCHASE OF VEHICLE/INVERTER BATTERIES - 9 ITEMS( WE-43 Dt.08/06/2016 (e-Tender No.MOIL/16-17/ET/39)) | 08-06-2016 | 13-07-2016 | 13-07-2016 | 13-07-2016 | 3:30 PM | Active | View |
14. | PURCHASE OF CUP SHAPE GRINDING WHEEL(WE-45 Dt.08/06/2016(e-Tender No. MOIL/16-17/ET-42)) | 08-06-2016 | 13-07-2016 | 13-07-2016 | 13-07-2016 | 3:30 PM | Active | View |
15. | Jaw Plates for Sayaji Make Jaw Crushers(PUR/MOIL/C-5//30/WE-28/370-M (MOIL/16-17/ET/43)) | 08-06-2016 | 11-07-2016 | 11-07-2016 | 11-07-2016 | 3:30 PM | Active | View |
16. | PURCHASE OF RUBBER AIR HOSE - 5 ITEMS(WE-44 Dt.08/06/2016 (e-Tender No.MOIL/16-17/ET/41)) | 08-06-2016 | 15-07-2016 | 15-07-2016 | 15-07-2016 | 3:30 PM | Active | View |
17. | PURCHASE OF RUBBER AIR HOSE - 5 ITEMS(WE-44 Dt.08/06/2016 (e-Tender No.MOIL/16-17/ET/41)) | 08-06-2016 | 20-07-2016 | 20-07-2016 | 20-07-2016 | 03:30 PM | Active | View |
18. | PURCHASE OF AUTODESK AUTOCAD 2016(PUR/MOIL/C-4/138/E-12/463-M DT.07/06/2016) | 07-06-2016 | 27-06-2016 | 27-06-2016 | 27-06-2016 | 3:30 PM | Active | View |
19. | BLANKET RATE CONTRACT FOR ONE YEAR FOR SUPPLY OF VARIOUS SPARES FOR SANDVIK SURFACE DRILL MACHINE MODEL DI500(PUR/MOIL/C-5/75/E-10/399-M) | 07-06-2016 | 22-06-2016 | 22-06-2016 | 22-06-2016 | 3:30 PM | Active | View |
20. | Renovation Works for Mine Manager Bungalow at Balaghat Mine(83/Civil/BGT/16-17/1798 Date 05.06.2016) | 06-06-2016 | 13-06-2016 | 13-06-2016 | 13-06-2016 | 4:30 PM | Active | View |
21. | Cleaning of spillage material under and around all the equipment of Integrated Manganese Beneficiation Plant at Balaghat Mine.(Agent DGM(M)/Mining/BGT/16-17/1756 Date 03.06.2016) | 06-06-2016 | 13-06-2016 | 13-06-2016 | 13-06-2016 | 4:30 PM | Active | View |
22. | REPAIR OF WATER SUPPLY PIPELINE FROM BHATERA PUMP STATION TO BALAGHAT AND INSTALLATION OF AIR VALVE AT BHATERA PUMP STATION(83/Civil/BGT/16-17/1303 Date 20.05.2016) | 06-06-2016 | 20-06-2016 | 20-06-2016 | 20-06-2016 | 4:30 PM | Active | View |
23. | Sinking of four winzes from minus 30 ft level and minu 130 ft level by Drop Raising Method at Munsar Mine(SDGM(M)-III/CONT/09/WINZE/MUN/2016-17/16) | 06-06-2016 | 14-06-2016 | 14-06-2016 | 14-06-2016 | 3:30 PM | Active | View |
24. | supply of Size good quality black gitti for UG concreting at Chikla Mine.(TE/CH/UG/MINE/16-17/128) | 04-06-2016 | 09-06-2016 | 09-06-2016 | 09-06-2016 | 4:30 PM | Active | View |
25. | Providing, Supplying and Installation of 60 W LED Street fitting at Gumgaon Mine(GM/Elect/TEN/16-17/677, Dated - 02.06.2016N) | 04-06-2016 | 15-06-2016 | 15-06-2016 | 15-06-2016 | 3:30 PM | Active | View |
26. | TILTING TUBS FOR VARIOUS MINES - 360 NOS. (I.E 24 CFT TUBS, TRB TYPE - FOR MP MINES - 170 NOS.AND FOR MAHARASHTRA MINES - 190 NOS) (AS PER ANNEXURE - C ENCLOSED)(WE-17 DT.03/06/2016, e-TENDER NO.MOIL/16-17/ET/38) | 03-06-2016 | 14-07-2016 | 14-07-2016 | 14-07-2016 | 3:30 PM | Active | View |
27. | Designing and printing of Full Annual Report(s)-2015-16 as per details given in tender documents(CS/ARP-2015-16-PRT) | 02-06-2016 | 23-06-2016 | 23-06-2016 | 23-06-2016 | 4:00 PM | Active | View |
28. | CABLE BOLTING MACHINE FOR VARIOUS MINES - 7 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-23 DT.02/06/2016, e-TENDER NO.MOIL/16-17/ET/37) | 02-06-2016 | 04-07-2016 | 04-07-2016 | 04-07-2016 | 3:30 PM | Active | View |
29. | DISPATCH WORK OF ANNUAL REPORT AND ABRIDGED FINANCIAL STATEMENTS FOR 2015-16 OF MOIL LIMITED(CS/ ARP-2015-16-Dispatch) | 02-06-2016 | 11-07-2016 | 11-07-2016 | 11-07-2016 | 4:00 PM | Active | View |
30. | e-Procurement of Miners Canvas Safety Boots -3500 Pairs(WE-32, e-tender No.MOIL/16-17/ET-35, Dt.02.06.2016) | 02-06-2016 | 14-07-2016 | 14-07-2016 | 14-07-2016 | 3:30 PM | Active | View |
31. | e-Procurement of C.I.Ball Valves - 4 items(WE-33, e-tender No.MOIL/16-17/ET-36, Dt.02.06.2016) | 02-06-2016 | 14-07-2016 | 14-07-2016 | 14-07-2016 | 3:30 PM | Active | View |
32. | Removal of old dump and handling the waste rock at various dump at Munsar Mine (SDGM(M)-III/CONT/12/OCD/MUN/16-17/15) | 01-06-2016 | 09-06-2016 | 09-06-2016 | 09-06-2016 | 3:30 PM | Active | View |
33. | Washing and neutralization of sludge (MOIL/EMD/CH/AGDM/2016-17/190) | 01-06-2016 | 18-06-2016 | 18-06-2016 | 18-06-2016 | 4:30 PM | Active | View |
34. | BATTERY LOCOMOTIVES, CAPACITY 3 TON - 2 NOS. AND 4 TON - 2 NOS. FOR VARIOUS MINES (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-21 DT.31/05/2016, e-TENDER NO.MOIL/16-17/ET/33) | 01-06-2016 | 01-07-2016 | 01-07-2016 | 01-07-2016 | 3:30 PM | Active | View |
35. | CRAWLER MOUNTED SIDE DUMP LOADER - 2 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-24 DT.01/06/2016, e-TENDER NO.MOIL/16-17/ET/34) | 01-06-2016 | 01-07-2016 | 01-07-2016 | 01-07-2016 | 3:30 PM | Active | View |
36. | Manual winzing from minus 30 ft level to minus 130 ft level at Munsar Mine(SDGM(M)-III/CONT/02/WINZE/MUN/16-17/14) | 31-05-2016 | 07-06-2016 | 07-06-2016 | 07-06-2016 | 3:30 PM | Active | View |
37. | Recovery of SM Grade ore (SPL-463) from waste dumps at Sitapatore Mine(GR.-II/SDGM(M)/CONT/R-DUMP/18/SITA/2016-17/11) | 31-05-2016 | 10-06-2016 | 10-06-2016 | 10-06-2016 | 03:30 PM | Active | View |
38. | Recovery of LGHS ore and SM grade ore from 320 feet Level North dump at Chikla Mine.(GR.-II/SDGM(M)/CONT/R-DUMP/9/CH/2016-17/12) | 31-05-2016 | 10-06-2016 | 10-06-2016 | 10-06-2016 | 3:30 PM | Active | View |
39. | e procurement of HDPE Pipes, Bends and Pipe Ends 10 Items(WE-11, e-tender No.MOIL/16-17/ET-20, Dt.31.05.2016) | 31-05-2016 | 30-06-2016 | 30-06-2016 | 30-06-2016 | 3:30 PM | Active | View |
40. | Maintenance of Garden at Rest House, Canteen, South Staff Garden and Manager Bunglow etc.(TRD/CIVIL/HO/2016-17/583A, 24.5.2016) | 30-05-2016 | 07-06-2016 | 07-06-2016 | 07-06-2016 | 10:00 AM | Active | View |
41. | Augmentation of 33 KV Outdoor and 11 KV Indoor Substation of Ukwa Mine, Dist. Balaghat (MP).(DGM(E)/3/ UKW/16-17/ 52) | 30-05-2016 | 12-07-2016 | 12-07-2016 | 12-07-2016 | 3:30 PM | Active | View |
42. | HT VCB PANEL VARIOUS TYPES-12 SETS (AS PER ANNEXURE - C ENCLOSED)(WE-16 DT 30/05/16, E-TENDER NO. MOIL/16-17/32) | 30-05-2016 | 04-07-2016 | 04-07-2016 | 04-07-2016 | 3:30 PM | Active | View |
43. | PURCHASE OF SPARES FOR STERLING WILSON MAKE DG SET(PUR/MOIL/C-5/47/E-115/2474-M) | 27-05-2016 | 15-06-2016 | 15-06-2016 | 15-06-2016 | 3:30 PM | Active | View |
44. | MOBILE LIGHTING TOWER 9 MTR.HEIGHT WITH 5 KVA GENERATOR SET - 5 NOS. (AS PER ANNEXURE - C ENCLOSED)(WE-7 DT.27/05/2016, e-TENDER NO.MOIL/16-17/ET/30) | 27-05-2016 | 28-06-2016 | 28-06-2016 | 28-06-2016 | 3:30 PM | Active | View |
45. | TCT DRILL RODS - 4 ITEMS(WE-18 DT.27/05/2016(e-tender no. MOIL/16-17/ET/31)) | 27-05-2016 | 12-07-2016 | 12-07-2016 | 12-07-2016 | 3:30 PM | Active | View |
46. | Limited Tender for Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPS(BGT/SYSTEM/AMC/2016-17/1444) | 26-05-2016 | 02-06-2016 | 02-06-2016 | 02-06-2016 | 4:00 PM | Active | View |
47. | Replacement of buntons of Holmes Shaft Skip Compartment from 4th Level to 6th Level Balaghat Mine(BGT/ENGG/16-17/1299A Date 20.05.2016) | 26-05-2016 | 10-06-2016 | 10-06-2016 | 10-06-2016 | 5:00 PM | Active | View |
48. | Fabrication of steel rings 1.80m diax0.80m height for Underground Offsetting works at Balaghat Mine(BGT/ENGG/16-17/1248 Date 18.05.2016) | 26-05-2016 | 10-06-2016 | 10-06-2016 | 10-06-2016 | 5:00 PM | Active | View |
49. | Repairing of corroded chequered plates of floor area of picking belt and BC 14 conveyor belt at IMB Plant and Production Shaft Pit Top(BGT/ENGG/16-17/1284 Date 19.05.2016) | 26-05-2016 | 08-06-2016 | 08-06-2016 | 08-06-2016 | 5:00 PM | Active | View |
50. | Removal of old dump and handling the waste rock at Munsar Mine (MOIL/2016-17/ET/24) | 26-05-2016 | 29-06-2016 | 29-06-2016 | 29-06-2016 | 3:30 PM | Active | View |
51. | Removal of Waste Rock and Mn rock at 50 ft level O/C section at Kandri mine (MOIL/2016-17/ET/23) | 26-05-2016 | 29-06-2016 | 29-06-2016 | 29-06-2016 | 3:30 PM | Active | View |
52. | e-procurement of Butterfly Valves-3 items (L and T/AUDCO Make).(WE-30, e-tender No.MOIL/16-17/ET-29, Dt.26.05.2016) | 26-05-2016 | 30-06-2016 | 30-06-2016 | 30-06-2016 | 3:30 PM | Active | View |
53. | SPLIT AIR CONDITIONER 1.5 TON CAPACITY - 1 NO. AND 2 TON CAPACITY - 5 NOS. FOR CORPORATE OFFICE MOIL LTD NAGPUR (AS PER ANNEXURE - C ENCLOSED)(WE-29 DT.25/05/2016, e-TENDER NO.MOIL/16-17/ET/28) | 25-05-2016 | 01-06-2016 | 01-06-2016 | 01-06-2016 | 3:30 PM | Active | View |
54. | Recovery of LGHS ore and SM grade ore from 320 feet Level South dump at Chikla Mine.(GR.-II/SDGM(M)/CONT/R-DUMP/2/CH/2016-17/10) | 25-05-2016 | 03-06-2016 | 03-06-2016 | 03-06-2016 | 3:30 PM | Active | View |
55. | SPLIT AIR CONDITIONER 1.5 TON CAPACITY - 1 NO. AND 2 TON CAPACITY - 5 NOS. FOR CORPORATE OFFICE MOIL LTD NAGPUR (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-29 DT.25/05/2016, e-TENDER NO.MOIL/16-17/ET/28) | 25-05-2016 | 03-06-2016 | 03-06-2016 | 03-06-2016 | 3:30 PM | Active | View |
56. | Recovery of LGHS lumpy ore and SM grade ore from waste dump near Sidha Baba Mandir at Tirodi Mine.(GR.-II/SDGM(M)/CONT/R-DUMP/5/TRD/2016-17/9) | 25-05-2016 | 03-06-2016 | 03-06-2016 | 03-06-2016 | 3:30 PM | Active | View |
57. | PURCHASE OF SLURRY TRANSFER HOSE(PUR/MOIL/C-11/30/E-8/358-M) | 25-05-2016 | 08-06-2016 | 08-06-2016 | 08-06-2016 | 3:30 PM | Active | View |
58. | FULLY AUTOMATIC STAR DELTA STARTER WITH ACCESSORIES - 34 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-8 DT.24/05/2016, e-TENDER NO.MOIL/16-17/ET/25) | 25-05-2016 | 29-06-2016 | 29-06-2016 | 29-06-2016 | 3:30 PM | Active | View |
59. | Fabrication of various crossings at various levels of Vertical Shaft at Munsar Mine(A-III/MUN/16-17/635) | 25-05-2016 | 14-06-2016 | 14-06-2016 | 14-06-2016 | 4:00 PM | Active | View |
60. | e procurement of G I Pipes of assorted sizes 6 Items(WE-12, e-tender No.MOIL/16-17/ET-27, Dt.25.05.2016) | 25-05-2016 | 28-06-2016 | 28-06-2016 | 28-06-2016 | 3:30 PM | Active | View |
61. | Comprehensive Annual Maintenance of Computers, Printers,UPS and LAn at GR-II Mines.(TE/CH/SYSTEM/AMC/2016-17/1) | 24-05-2016 | 31-05-2016 | 31-05-2016 | 31-05-2016 | 4:00 PM | Active | View |
62. | Underground concreting work at -270 feet L and -370 feet L of vertical section at Chikla Mine(GR.-II/SDGM(M)/CONT/UG-CONC/11/CH/2016-17/8) | 24-05-2016 | 03-06-2016 | 03-06-2016 | 03-06-2016 | 3:30 PM | Active | View |
63. | Supplying, providing, and installation of protection with Alarm System for Centralized Data Centre of ERP at Corporate Office, Nagpur(DGM(E)/86/ HO/16-17/ 48) | 24-05-2016 | 02-06-2016 | 02-06-2016 | 02-06-2016 | 3:30 PM | Active | View |
64. | PURCHASE OF AGRICO IMPLEMENTS (MAKE TATA STEEL LIMITED ONLY).(PUR/MOIL/C-1/196/E-07/355-M dt.24.05.2016) | 24-05-2016 | 15-06-2016 | 15-06-2016 | 15-06-2016 | 3:30 PM | Active | View |
65. | Repairing of Air Conditioning Unit of Heavy earth Moving Machineries Operating at Dongri Buzurg Mine(A-II/CHK/DB/16-17/133 dtd 23.05.2016) | 23-05-2016 | 31-05-2016 | 31-05-2016 | 31-05-2016 | 4:30 PM | Active | View |
66. | Cleaning, collection and stacking of fines at Kandri Mine(SDGM(M)-III/CONT/10/FINES/KAN/2016-17/13) | 23-05-2016 | 31-05-2016 | 31-05-2016 | 31-05-2016 | 3:30 PM | Active | View |
67. | Picking and collection of SM grade Mn ore from dumps at Munsar Mine(SDGM(M)-III/CONT/07/DUMP/MUN/2016-17/12) | 23-05-2016 | 31-05-2016 | 31-05-2016 | 31-05-2016 | 3:30 PM | Active | View |
68. | Recovery of Ferro grade, LGHS and SM Grade ore from North magazine dump (waste dump) at Tirodi Mine.(GR.-II/SDGM(M)/CONT/R-DUMP/6/TRD/2016-17/4) | 23-05-2016 | 02-06-2016 | 02-06-2016 | 02-06-2016 | 3:30 PM | Active | View |
69. | Recovery of LGHS and SM Grade ore from North waste dump at Tirodi Mine(GR.-II/SDGM(M)/CONT/R-DUMP/4/TRD/2016-17/5) | 23-05-2016 | 02-06-2016 | 02-06-2016 | 02-06-2016 | 3:30 PM | Active | View |
70. | Underground vertical development for second outlet at vertical section of Chikla Mine(GR.-II/SDGM(M)/CONT/UG-DEV/3/CH/2016-17/6) | 23-05-2016 | 02-06-2016 | 02-06-2016 | 02-06-2016 | 3:30 PM | Active | View |
71. | Recovery OF SM Grade ore from South Side of South staff quarters dump (waste dump) at Tirodi Mine(GR.-II/SDGM(M)/CONT/R-DUMP/10/TRD/2016-17/7) | 23-05-2016 | 02-06-2016 | 02-06-2016 | 02-06-2016 | 3:30 PM | Active | View |
72. | Rate Contract for rewinding of LT Motors(Upto 25HP) for a period of 1oneYears at Balaghat Mine.(Elect/BGT/Rewinding/16-17/1307 Date 20.05.2016) | 23-05-2016 | 20-06-2016 | 20-06-2016 | 20-06-2016 | 4:30 PM | Active | View |
73. | Raking of raw materials and preparation of sand bed for casting of metal and slag at Ferro Manganese Plaant Balaghat Mine(SDGM (MECH)/FMP/16-17/01) | 23-05-2016 | 15-06-2016 | 15-06-2016 | 15-06-2016 | 3:30 PM | Active | View |
74. | L.T.ACB PANEL FOR VARIOUS MINES (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-15 DT.23/05/2016, e-TENDER NO.MOIL/16-17/ET/22) | 23-05-2016 | 29-06-2016 | 29-06-2016 | 29-06-2016 | 3:30 PM | Active | View |
75. | Providing manpower for maintenance of under ground machineries for twelve months,(A-III/MUN/GUM/16-17/495) | 20-05-2016 | 30-05-2016 | 30-05-2016 | 30-05-2016 | 4:30 PM | Active | View |
76. | DISMENTALING OF IPS FLOOR(TRD/CIVIL/A/2016-17/529, DT. 10.5.16) | 19-05-2016 | 25-05-2016 | 25-05-2016 | 25-05-2016 | 11:55 AM | Active | View |
77. | Waterproofing works by means of laying Dr.Fixit Torchshield to roof of Electrical Substation Building at 6th Level, Balaghat Mine.(83/Civil/BGT/16-17/1244 Date 18.05.2016) | 19-05-2016 | 25-05-2016 | 25-05-2016 | 25-05-2016 | 4:30 PM | Active | View |
78. | DISMENTALING OF IPS FLOOR(TRD/CIVIL/A/2016-17/529, DT. 10.5.16) | 19-05-2016 | 25-05-2016 | 25-05-2016 | 25-05-2016 | 12:10 PM | Active | View |
79. | PRE STRESSED STEEL WIRE ROPE(WE-10 DT.19/05/2016(e-tender no. MOIL/16-17/et/21)) | 19-05-2016 | 24-06-2016 | 24-06-2016 | 24-06-2016 | 3:30 PM | Active | View |
80. | Pneumatic Tyre, Tube and Flaps and Solid Tyres(WE-19 DT.19/05/2016(e-Tender No. MOIL/16-17/ET/19)) | 19-05-2016 | 27-06-2016 | 27-06-2016 | 27-06-2016 | 3:30 PM | Active | View |
81. | Picking and collection of SM grade Mn ore from dumps at Munsar Mine(SDGM(M)-III/CONT/42/DUMP/MUN/2016-17/11) | 18-05-2016 | 21-06-2016 | 21-06-2016 | 21-06-2016 | 3:30 PM | Active | View |
82. | Fabrication of Steel Orepasses and Steel manways for Balaghat Mine(SDGM (MECH)/Tender-Orepass/BGT/16-17/85) | 18-05-2016 | 22-06-2016 | 22-06-2016 | 22-06-2016 | 3:30 PM | Active | View |
83. | Fabrication of Steel Orepasses and Steel manways for Kandri Mine(SDGM (MECH)/Tender-Orepass/KND/16-17/87) | 18-05-2016 | 22-06-2016 | 22-06-2016 | 22-06-2016 | 3:30 PM | Active | View |
84. | Fabrication of Steel Orepasses and Steel manways for Chikla Mine (SDGM (MECH)/Tender-Orepass/CHK/16-17/86) | 18-05-2016 | 22-06-2016 | 22-06-2016 | 22-06-2016 | 3:30 PM | Active | View |
85. | Rate contract for Repairing and retreading of vehicle and OTR Tyres(WE- 9 Dt. 18/05/16(e -Tender No.MOIL/16-17/ET/18)) | 18-05-2016 | 30-06-2016 | 30-06-2016 | 30-06-2016 | 3:30 PM | Active | View |
86. | Supplying, providing, and installation of Biometric Access Control System for Data Centre of ERP at Corporate Office, Nagpur.(DGM(E)/86/ HO/16-17/ 40) | 17-05-2016 | 25-05-2016 | 25-05-2016 | 25-05-2016 | 3:30 PM | Active | View |
87. | PICKING AND COLLECTION OF MATERIAL AT UKWA MINE (Gr.-I/GM(Sand E)/CONT/R-DUMP/34/UK/2016-17/3) | 17-05-2016 | 26-05-2016 | 26-05-2016 | 26-05-2016 | 3:30 pm | Active | View |
88. | Various miscellaneous contract works at EMD Plant Dongri Buzurg Mine (SDGM (MECH)/EMD/16-17/01) | 17-05-2016 | 07-06-2016 | 07-06-2016 | 07-06-2016 | 3:30 PM | Active | View |
89. | PROCESS PUMPS WITHOUT MOTOR FOR EMD PLANT, DONGRI BUZURG MINE - 2 NOS. (AS PER ANNEXURE - C ENCLOSED). (WE-27 DT.17/05/2016, e-TENDER NO.MOIL/16-17/ET/17) | 17-05-2016 | 07-06-2016 | 07-06-2016 | 07-06-2016 | 3:30 PM | Active | View |
90. | PURCHASE OF SAFETY HELMETS FROM MSE FIRMS ONLY (PUR/MOIL/C-1/189/E-5/290-M Dt. 17/05/2016) | 17-05-2016 | 08-06-2016 | 08-06-2016 | 08-06-2016 | 3:30 pm | Active | View |
91. | UNDERGROUND DEVELOPMENT AT 12TH L (SOUTH SECTION) AT BALAGHAT MINE (MOIL/16-17/ET/16) | 17-05-2016 | 22-06-2016 | 22-06-2016 | 22-06-2016 | 3:30 pm | Active | View |
92. | UNDERGROUND DEVELOPMENT AT -270 feet L AND -370 feet LEVEL OF VERTICAL SECTION AT CHIKLA MINE ( MOIL/16-17/ET/14 ) | 17-05-2016 | 28-06-2016 | 28-06-2016 | 28-06-2016 | 3:30 pm | Active | View |
93. | ANNUAL REPAIRING OF SCHOOL BUS 5 NOS OF DONGRI BUZURG MINE(A-II/CHK/DB/16-17/106 dtd 14.05.2016) | 16-05-2016 | 20-05-2016 | 20-05-2016 | 20-05-2016 | 4:30 PM | Active | View |
94. | Trench cutting in ore stacks at Kandri Mine(SDGM(M)-III/CONT/08/TRENCH/KAN/16-17/10)SDGM(M)-III/CONT/08/TRENCH/KAN/16-17/10 | 16-05-2016 | 24-05-2016 | 24-05-2016 | 24-05-2016 | 3:30 PM | Active | View |
95. | PURCHASE OF LINE INTERACTIVE UPS - 59 NOS. (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/138/E-6/293-M DT.16./05/2016) | 16-05-2016 | 06-06-2016 | 06-06-2016 | 06-06-2016 | 3:30 PM | Active | View |
96. | Maintenance of Garden(TRD/CIVIL/HO/2016-17/91, 7.5.2016) | 14-05-2016 | 24-05-2016 | 24-05-2016 | 24-05-2016 | 05:55 PM | Active | View |
97. | Desilting and Cleaning of Sump at -100L,-200L,-400L at Gumgaon Mine(GUM/Mining/16-17/473 Dt. 11.05.2016) | 13-05-2016 | 20-05-2016 | 20-05-2016 | 20-05-2016 | 4:30 PM | Active | View |
98. | Monsoon Preparation work at Open cast Surface at Gumgaon Mine(GUM/Mining/16-17/472 Dt. 11.05.2016) | 13-05-2016 | 20-05-2016 | 20-05-2016 | 20-05-2016 | 4:30 PM | Active | View |
99. | Repair of road dividers and horticultural works for beautification of approach road in front of Agent Office to Guest House at Balaghat Mine.(83/Civil/BGT/16-17/1074 Date 11.05.2015) | 12-05-2016 | 23-05-2016 | 23-05-2016 | 23-05-2016 | 4:30 PM | Active | View |
100. | Construction and Installation of Water Filtration Plant at Tirodi Mine.(CIVIL/HO/16-17 /TRD/12) | 12-05-2016 | 24-05-2016 | 24-05-2016 | 24-05-2016 | 3:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |