Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Drilling of 08 No. Bore holes in U/G at Munsar mine (MUN/MIN/GM (M) III/Agent/16-17/ 717 dt 07/09/2016) 07-09-2016 14-09-2016 14-09-2016 14-09-2016 4:30 PM Active View
2. Hutch Drain Cleaning of Jig Section of OCF at Balaghat Mine. (Agent Sr.DGM(M)/Mining/BGT/16-17/4063Date 31.08.16) 07-09-2016 09-09-2016 09-09-2016 09-09-2016 4:30 PM Active View
3. Removal of Garbage/shrubs cutting cleaning of septic tanks and drain cleaning for Camp Quarters at Balaghat Mine (83/Civil/BGT/Welfare/16-17/3929 Date 26.08.16) 07-09-2016 09-09-2016 09-09-2016 09-09-2016 4:30 PM Active View
4. Recovery of SM Grade ore (SPL-463) from dumps at Sitapatore Mine (GR.-II/GM(M)/CONT/R-DUMP/36/SITA/2016-17/19) 07-09-2016 16-09-2016 16-09-2016 16-09-2016 3:30 PM Active View
5. Providing, Supplying, Laying and Installation of 3.5 C x 50 Sqmm PVC Armoured Aluminum Conductor cable for 2 nos High mast lighting tower of footwall side at Dongri Buzurg Mine (DB/ELECT/16-17/485 DTD 01.09.2016) 03-09-2016 13-09-2016 13-09-2016 13-09-2016 4:30 PM Active View
6. REPAIRING OF RHS FINAL DRIVE SPARES (HUB, CAGE INNER AND OUTER) OF BEML DUMPER NO 16, SWING MOTOR SHAFT MALE AND FEMALE OF BE 700 NO 2 HYDRAULIC EXCAVATOR AND ROTARY HEAD SHAFT FOR SANDVIK DI 500 OPERATING AT DONGRI BUZURG MINE (DB/MECH/16-17/484 Date 01. 03-09-2016 15-09-2016 15-09-2016 15-09-2016 4:30 PM Active View
7. Screening, picking, collection and stacking of 25 per Mn small ore (MSL-498) through trammel at Munsar Mine from various dumps. (GM(M)-III/CONT/15/DUMP/MUN/2016-17/32) 02-09-2016 09-09-2016 09-09-2016 09-09-2016 3:30 PM Active View
8. Picking and collection of SM grade ore from contaminated rom at old satuk section at Beldongri Mine (GM(M)-III/CONT/17/ROM/OLD-SATUK/2016-17/33) 02-09-2016 09-09-2016 09-09-2016 09-09-2016 3:30 PM Active View
9. Providing and supplying of C class item of Electrical Dept. Of Gumgaon Mine (GM/Elect/TEN/16-17/1685, Dated - 01.09.2016) 02-09-2016 15-09-2016 15-09-2016 15-09-2016 3:30 pm Active View
10. Erection of 3 Phase, 3 Wire L.T. Over head line from IMB Plant (MCC-2) to North Sand Stowing Plant of Balaghat Mine (SDGM(E)/8/ BGT/16-17/ 183 dated 02/09/2016) 02-09-2016 22-09-2016 22-09-2016 22-09-2016 3:30 PM Active View
11. Fabrication of fixed gauge heavy duty tramline sleepers suitable for 30LB and 60LB Rail to Underground Tramline Works at Balaghat Mine (BGT/MECH/TRAMLINE SLEEPER/16-17/4040 Date 30.08.16) 01-09-2016 09-09-2016 09-09-2016 09-09-2016 5:00 pm Active View
12. Purchase of Boom and Arm Cylinder for Tata Hitachi 450H Hydraulic Excavator (PUR/MOIL/C-5/4/WE-31 (MOIL/16-17/ET/85)) 01-09-2016 28-09-2016 28-09-2016 28-09-2016 3:30 pm Active View
13. Cleaning of surplus underground ROM at Beldongri Mine (GM(M)-III/CONT/24/S-U/G-ROM/BEL/16-17/31) 31-08-2016 08-09-2016 08-09-2016 08-09-2016 3:30 PM Active View
14. Design, Engineering, procurement and supply, construction, erection, testing and commissioning and comprehensive operation operation and maintenance for 25 years of Solar PV Plant with tracking system on turnkey basis of 5 MW at Munsar Mine of MOIL. (MOI 31-08-2016 21-10-2016 21-10-2016 21-10-2016 3:30 PM Active View
15. Design engineering procurement and supply construction erection testing and commissioning and comprehensive operation and maintenance for 25 yeas of solar PV Plant with tracking system on turnkey basis of 5.5 MW capacity at mines of Madhya Pradesh. (MOIL/ 31-08-2016 21-10-2016 21-10-2016 21-10-2016 3:30 PM Active View
16. Drilling of 03 nos of Bore holes for drinking water supply for New residential quarter and wahitola camp at Munsar Mine (MUN/C/HO/AGENT/16-17/674 DATE 26.08.2016) 30-08-2016 06-09-2016 06-09-2016 06-09-2016 3:00PM Active View
17. Providing and fixing vetrified tiles on floor of varandah of guest house at Tirodi Mine (Civil/HO/16-17/TRD/446 Dt-21/08/2016) 30-08-2016 07-09-2016 07-09-2016 07-09-2016 4:30 PM Active View
18. Annual Repair for Camp and Residential Quarters at Balaghat Mine. ( Civil /HO/16-17 /BGT/35 Dated - 29/08/2016 ) 29-08-2016 15-09-2016 15-09-2016 15-09-2016 3:30 PM Active View
19. Security Guard for Diamond Drilling site at Ukwa Mine. (A and Sr.Dy.G.M.(M) /Civil / UM/ 16-17/1490) 27-08-2016 07-09-2016 07-09-2016 07-09-2016 4:30 PM Active View
20. Sulphuric Acid (PUR/MOIL/C-11/3/WE-62 (MOIL/16-17/ET/80)) 26-08-2016 16-09-2016 16-09-2016 16-09-2016 3:30 PM Active View
21. M S LANCING PIPE (PUR/MOIL/C-11/114/WE-59 (MOIL/16-17/ET/81)) 26-08-2016 19-09-2016 19-09-2016 19-09-2016 3:30 PM Active View
22. Providing and constructing slotted pipe filter gallery and infiltration work in Bawanthadi river at existing head work for water supply scheme at Dongri Buzurg Mine. ( CIVIL/HO/16-17 /DB/30 Dt- 24/06/2016 ) 25-08-2016 09-09-2016 09-09-2016 09-09-2016 3:30 PM Active View
23. Construction of Sewerage Treatment Plant at Dongri Buzurg Mines (TE-Civil/HO/DB/2016-17/2 DT.23/08/2016) 25-08-2016 16-09-2016 16-09-2016 16-09-2016 3:30 PM Active View
24. Construction of Exhibition Hall near Corporate Training Centre at MOIL Bhawan premises, Nagpur. (Civil /HO/16-17 /HO/34 Dated - 23/08/2016) 24-08-2016 08-09-2016 08-09-2016 08-09-2016 3:30 PM Active View
25. Construction of classroom Kitchen room for Mid Day meal and boundary wall toilets in Govt. school village Manegaon, Anwlajhari, RNT school village Bherweli Distt Balaghat ( M.P) Under MOIL CSR (CIVIL/HO/16-17 /CSR/BGT/28 Dt 25/08/2016) 24-08-2016 15-09-2016 15-09-2016 15-09-2016 3:30 PM Active View
26. M.S. Welding Electrodes - 4 Items. (Only Through e-procurement) (WE-67 DT.24/08/2016, e-TENDER NO.MOIL/16-17/ET/82) 24-08-2016 26-09-2016 26-09-2016 26-09-2016 3:30 PM Active View
27. M.S. Welding Electrodes - 4 Items. (Only Through e-procurement) (WE-67 DT.24/08/2016, e-TENDER NO.MOIL/16-17/ET/82) 24-08-2016 30-09-2016 30-09-2016 30-09-2016 3:30 PM Active View
28. Construction of 150 HP, 170 HP,10 HP pump Foundation and Shed at 6no. North section Tirodi Mine (TRD/Civil/A/2016-17/TRD/1401A Dated07.08.2016) 23-08-2016 31-08-2016 31-08-2016 31-08-2016 4:30 PM Active View
29. Providing and fixing Glass Partition and Ceiling work for Union Office at Central Laboratory at MOIL Bhawan, Nagpur. (Civil /HO/16-17 /HO/33 Dated - 23/08/2016) 23-08-2016 31-08-2016 31-08-2016 31-08-2016 3:30 PM Active View
30. PURCHASE OF ROTARY SCREW COMPRESSOR WITH AIR DRIER FOR I.M.B PLANT AT BALAGHAT MINE - 1 SET. (AS PER ANNEXURE - A ENCLOSED) (PUR/MOIL/C-4/112/E-32/952-M DT.22/08/2016) 23-08-2016 14-09-2016 14-09-2016 14-09-2016 3:30 PM Active View
31. RECASTING OF 6 NOS. CONTACT CLAMP OF FERRO MANGANESE PLANT (TE/MOIL/BGT/FMP/ELECT/16-17/446 DT. 23/08/2016) 23-08-2016 29-09-2016 29-09-2016 29-09-2016 4:30 PM Active View
32. Extension of Compressor Shed Building at 5th Level at Balaghat Mine. ( Civil /HO/16-17 /BGT/25 Dated - 22/08/2016 ) 22-08-2016 30-08-2016 30-08-2016 30-08-2016 3:30 PM Active View
33. Equipping of 32 Fill pass winze of 3.6 Mtr dia and 168 Mtr depth with buntons, sollars and ladders at Balaghat Mine. (SDGM (MECH)/Tender-32 Fill pass-winze/2016-17/285) 22-08-2016 20-09-2016 20-09-2016 20-09-2016 3:30 PM Active View
34. AIR RECEIVER TANK FOR VARIOUS MINES - 9 NOS. (CAP.0.5 CU.M - 7 NOS. AND CAP.3 CU.M - 2 NOS.) (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-61 DT.22/08/2016, e-TENDER NO.MOIL/16-17/ET/79) 22-08-2016 07-10-2016 07-10-2016 07-10-2016 3:30 PM Active View
35. Land Scapping and Plantation for development of garden at Guest House at tirodi mine (Civil/HO/2016-17/TRD/420 Dated 14.08.2016) 20-08-2016 30-08-2016 30-08-2016 30-08-2016 4:30 PM Active View
36. Purchase of Sand for sand Stowing Plant at Balaghat Mine (Gr.-I/CGM(PR)/CONT/PUR-SAND/12/BGT/16-17/8) 20-08-2016 08-09-2016 08-09-2016 08-09-2016 3:30 PM Active View
37. Providing, Supplying and installation of 2 x 250 KVAR, 11 KV Outdoor Type HT Capacitor Bank for 2 x 700 KW, 11 KV Compressor of Balaghat Mine. (SDGM(E)/8/ BGT/16-17/ 163 ) 20-08-2016 23-09-2016 23-09-2016 23-09-2016 3:30 PM Active View
38. KEPS FOR CAGES OF KANDRI MINE - 4 SETS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-58 DT.19/08/2016, e-TENDER NO.MOIL/16-17/ET/77) 20-08-2016 27-09-2016 27-09-2016 27-09-2016 3:30 PM Active View
39. D.C MOTOR - 350 H.P, 1000 RPM - 1 NO. AND 450 H.P, 1000 RPM - 1 NO. FOR BALAGHAT MINE (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-60 DT.20/08/2016, e-TENDER NO.MOIL/16-17/ET/76) 20-08-2016 17-10-2016 17-10-2016 17-10-2016 3:30 PM Active View
40. D.C MOTOR - 350 H.P, 1000 RPM - 1 NO. AND 450 H.P, 1000 RPM - 1 NO. FOR BALAGHAT MINE (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-60 DT.20/08/2016, e-TENDER NO.MOIL/16-17/ET/76) 20-08-2016 17-10-2016 17-10-2016 17-10-2016 3:30 PM Active View
41. Supply, installation, commissioning and two years on-site comprehensive warranty maintenance of wired/wireless networking equipment with necessary accessories at Balaghat Mine And Ukwa mine. (BGT/SYSTEM/NETWORKING/2016-17/3705 DT. 19/08/2016) 19-08-2016 25-08-2016 25-08-2016 25-08-2016 4:30 PM Active View
42. Construction of Store room for heavy vehicle in work shop premises at Dongri Buzurg Mine. (Civil /HO/16-17 / DB/26 Dated - 19/08/2016) 19-08-2016 30-08-2016 30-08-2016 30-08-2016 3:30 PM Active View
43. Designing, supplying, providing, installation and commissioning of 450 HP DC Drive and PLC Control Panel including SCADA and PLC based distributed signalling system for Skip Winder of Balaghat Mine.(SDGM(E)/8/ BGT/16-17/ 157) 18-08-2016 07-09-2016 07-09-2016 07-09-2016 03:30 PM Active View
44. Picking and collection of SM grade Mn ore from dumps at Munsar Mine(GM(M)-III/CONT/SM/30/MUN/2016-17/30) 17-08-2016 24-08-2016 24-08-2016 24-08-2016 03:30 PM Active View
45. Reduction of Manganese Ore on Conversion basis for EMD Plant, Dongri Buzurg Mine.( MOIL/16-17/ET/75) 17-08-2016 16-09-2016 16-09-2016 16-09-2016 03:30 PM Active View
46. providing and fixing vitrified tiles in floor and dodo at MOIL HOSPITAL premises at Tirodi Mine ( TRD/Civil/A/2016-17/TRD/907B Dated 07.08.2016 ) 16-08-2016 25-08-2016 25-08-2016 25-08-2016 4:30 PM Active View
47. Construction of Cement Concrete Road in Devnara, Pavnara, Pathri, Distt Bhandara under CSR. (Civil /HO/16-17/ CSR/BHN/32 Dated - 16/08/2016) 16-08-2016 31-08-2016 31-08-2016 31-08-2016 3:30 PM Active View
48. Construction of Classrooms for conducting vocational Training at Deaf and Dumb Residential School, Saoner under CSR. (Civil /HO/16-17/ CSR/NGP/31 Dated - 16/08/2016) 16-08-2016 31-08-2016 31-08-2016 31-08-2016 3:30 PM Active View
49. Construction of Multipurpose Community hall at Tahsil Baihar Distt Balaghat and Village Dongri Buzurg Distt Bhandara Under CSR..(Civil/HO/16-17/BGT/BHN/CSR/19- DT.08/08/2016) 16-08-2016 02-09-2016 02-09-2016 02-09-2016 03:30 PM Active View
50. Loading of crude into truck manually from differenct sections of Tirodi Mine(GR.II/GM(M)/CONT/LOADING/30/TRD/2016-17/18) 12-08-2016 22-08-2016 22-08-2016 22-08-2016 03:30 PM Active View
51. Cement Concrete Road at Village Lagma District Balaghat Under CSR.(Civil/HO/16-17/BGT/CSR/20 DT.08/08/2016) 12-08-2016 31-08-2016 31-08-2016 31-08-2016 03:30 PM Active View
52. Drilling of Bore Wells and Installation of Hand pumps at different villages of District Balaghat in ( M.P.) and District Bhandara and Nagpur in ( M.S.) under CSR.(Civil /HO/16-17/CSR/BGT/BHN/NGP/24 Dt 12/08/2016) 12-08-2016 26-08-2016 26-08-2016 26-08-2016 03:30 PM Active View
53. Construction of RCC Storm Water Drain at Village Umari, Tahsil Saoner, Distt Nagpur Under CSR.(Civil /HO/16-17/ CSR/NGP/22 Dated - 12/08/2016) 12-08-2016 26-08-2016 26-08-2016 26-08-2016 03:30 PM Active View
54. Construction of Girls Toilet at Kashidevi High School, Musewadi, Tahsil Ramtek, Distt- Nagpur.(Civil /HO/16-17 /CSR/NGP/23 Dated - 12/08/2016) 12-08-2016 26-08-2016 26-08-2016 26-08-2016 03:30 PM Active View
55. Construction of Bus Shelter, Public Toilets and deepening of water Pond in Village Rampayali, Distt Balaghat under CSR..(Civil /HO/16-17 /CSR/BGT/27 Dated - 12/08/2016) 12-08-2016 30-08-2016 30-08-2016 30-08-2016 03:30 PM Active View
56. Construction of Cement Concrete Road at Village Rantoli (Dongri Buzurg) District Bhandara Under CSR..(Civil/HO/16-17/CSR/BHN/21 DT 08/08/2016) 12-08-2016 02-09-2016 02-09-2016 02-09-2016 03:30 PM Active View
57. Undercarriage Assemblies for various Drilling Machines.(PUR/MOIL/C-5/75/WE-13 (MOIL/16-17/ET/74)) 12-08-2016 07-09-2016 07-09-2016 07-09-2016 03:30 PM Active View
58. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM PURCHASE OF GYMNASIUM ITEM VIZ. AEROFIT COMMERCIAl ELLIPTICAL (AF-6690E) - 1NO.(PUR/MOIL/C-4/301/E-28/860-M Dt.11/08/2016) 11-08-2016 18-08-2016 18-08-2016 18-08-2016 03:30 PM Active View
59. Underground cocnreting for stope block preparation at Munsar Mine(GM(M)-III/CONT/23/U/G-cont/MUN/2016-17/27) 11-08-2016 19-08-2016 19-08-2016 19-08-2016 03:30 PM Active View
60. Cleaning of surplus underground ROM at Munsar Mine(GM(M)-III/CONT/29/S-U/G-ROM/MUN/2016-17/29) 11-08-2016 19-08-2016 19-08-2016 19-08-2016 03:30 PM Active View
61. Sinking of four winzes from minus 30 ft level and minu 130 ft level by Drop Raising Method at Munsar Mine(GM(M)-III/CONT/09/Winze/MUN/2016-17/28) 11-08-2016 19-08-2016 19-08-2016 19-08-2016 03:30 PM Active View
62. Maintenance, distribution and collection of Cap Lamp at Chikla Mine(TE/CH/ELECT/16-17/406 dated 08.08.2016) 11-08-2016 23-08-2016 23-08-2016 23-08-2016 04:30 PM Active View
63. Repairing of Bucket PC 450 Hyd Excvator of Tirodi Mine.(SDGM/MECH/TRD/16-17/211/392) 11-08-2016 20-08-2016 20-08-2016 20-08-2016 03:30 PM Active View
64. Maintenance, distribution and collection of Cap Lamp at Chikla Mine(TE/CH/ELECT/16-17/406 dated 08.08.2016) 11-08-2016 23-08-2016 23-08-2016 23-08-2016 04:30 PM Active View
65. Designing, supplying, providing, installation and commissioning of DC Drive and PLC Control Panel including SCADA and PLC based distributed signalling system for Cage Winder of Holmes Shaft of Balaghat Mine(SDGM(E)/8/ BGT/16-17/ 151) 10-08-2016 07-09-2016 07-09-2016 07-09-2016 03:30 PM Active View
66. Cement Concrete Road at Village Tavejhari and Bhatera District Balaghat Under CSR.(CIVIL/HO/16-17/BGT/CSR/18) 09-08-2016 31-08-2016 31-08-2016 31-08-2016 03:30 PM Active View
67. Construction of New Ventilation Fan Room Portal Evasee at 170 level at Munsar Mine.(Civil /HO/16-17/MUN /17 Dt 06/08/2016) 08-08-2016 19-08-2016 19-08-2016 19-08-2016 03:30 PM Active View
68. PNEUMATICALLY OPERATED ANGLE GRINDER FOR VARIOUS MINES - 14 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-57 DT.08/08/2016, e-TENDER NO.MOIL/16-17/ET/70) 08-08-2016 08-09-2016 08-09-2016 08-09-2016 03:30 PM Active View
69. Handling of spillage ore and fines in IMB plant,Dongri Buzurg Mine.(Agen and DGM(M)/DB/IMB/16-17/368) 06-08-2016 16-08-2016 16-08-2016 16-08-2016 04:30 PM Active View
70. Transportation of Copper Mill Tailing from Ukwa Mine to Balaghat Mine for stowing purpose(Gr.-I/CGM(PR)/CONT/MILL TAILING/11/BGT/16-17/7) 06-08-2016 12-08-2016 12-08-2016 12-08-2016 03:30 PM Active View
71. PURCHASE OF SAFETY BELTS.(PUR/MOIL/C-1/190/E-29/862-M Dt. 06/08/2016) 06-08-2016 26-08-2016 26-08-2016 26-08-2016 03:30 PM Active View
72. Picking and collection of LGHS (O/C) ore from dumps through off the pit working at Gumgaon Mine(GM(M)-III/CONT/21/GUM/P and C DUMP/2016-17/26) 05-08-2016 12-08-2016 12-08-2016 12-08-2016 03:30 PM Active View
73. PURCHASE OF RUBBER TUB BUFFER.(PUR/MOIL/C-12/13/E-30/866-M Dt. 05/08/2016) 05-08-2016 26-08-2016 26-08-2016 26-08-2016 03:30 PM Active View
74. Blanket Rate Contract for supply of various all types and sizes of Bearings, Sleeves with Nuts, C.I. Pedestal Etc.(WE-41 DT.04/08/2016 (e-Tender No.MOIL/16-17/ET/68)) 05-08-2016 13-09-2016 13-09-2016 13-09-2016 03:30 PM Active View
75. PURCHASE OF CENTRIFUGAL MULTISTAGE PUMP - BARE, MAKE MAXFLOW PUMPS INDIA PVT.LIMITED - 1 NO. FOR BALAGHAT MINE (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/78/E-27/855-M DT.04/08/2016) 04-08-2016 07-09-2016 07-09-2016 07-09-2016 03:30 PM Active View
76. REPAIRING OF TRACK CHAIN ASSY- 2 Nos,SPROCKET ASSY- 2 Nos AND IDLER ASSY- 2 Nos OF DI 500 No.1 SANDVIK MAKE DRILLING MACHINE OPERATING AT DONGRI BUZURG MINE(A-II/CHK/DB/16-17/387 dtd 03.08.2016) 03-08-2016 09-08-2016 09-08-2016 09-08-2016 04:30 PM Active View
77. Cleaning of surplus underground and open cast ROM at Kandri Mine(GM(Mines)-III/CONT/22/CL-S-ROM/KAN/2016-17/24) 03-08-2016 10-08-2016 10-08-2016 10-08-2016 03:30 PM Active View
78. Construction Drain in front of country tiles roof south staff quarters at Tirodi Mine(Civil/HO/2016-17/TRD/333 Dated 16.07.2016) 03-08-2016 13-08-2016 13-08-2016 13-08-2016 04:30 PM Active View
79. Construction of Stone Masonary retaining wall at Mine area Sitapatore(Civil/HO/2016-17/SITA/332 Dated 16.07.2016) 03-08-2016 13-08-2016 13-08-2016 13-08-2016 04:30 PM Active View
80. DISPOSAL OF SLUDGE AT EMD PLANT AT EMD PLANT D.B. MINE(MOIL/EMD/CH/ADGM/2016-17/386 dtd 03.08.2016) 03-08-2016 17-08-2016 17-08-2016 17-08-2016 04:30 PM Active View
81. Picking and collection of SM grade Mn ore from dumps at Munsar Mine(GM(M)-III/CONT/27/P AND C -DUMP/MUN/16-17/25) 02-08-2016 10-08-2016 10-08-2016 10-08-2016 03:30 PM Active View
82. Development of Bio diversity park with chain link fencing at Gumgaon Mine(CIVIL/GUM/16-17/1321 DT 30.07.2016) 02-08-2016 11-08-2016 11-08-2016 11-08-2016 03:30 PM Active View
83. Trench cutting in ore stacks for sampling at Tirodi Mine(GR.II/GM(M)/CONT/TRENCH-CUT/29/TRD/2016-17/17) 02-08-2016 11-08-2016 11-08-2016 11-08-2016 03:30 PM Active View
84. Laying of CC flooring besides B and c type quarters at Gumgaon Mine(CIVIL/GUM/16-17/1320 DT 30.07.2016) 02-08-2016 11-08-2016 11-08-2016 11-08-2016 03:30 PM Active View
85. Construction of Anaerobic type septic tank at Gumgaon Mine(CIVIL/GUM/16-17/1343 DT 02.08.2016) 02-08-2016 11-08-2016 11-08-2016 11-08-2016 03:30 PM Active View
86. Supplying and filling of Non flotable type HDPE or PP filling media at GUmgaon Mine(CIVIL/GUM/16-17/1319 DT 30.07.2016) 02-08-2016 19-08-2016 19-08-2016 19-08-2016 03:30 PM Active View
87. Interior Renovation Works for Mine Managers Cabin, Conference Room and PA Rooms of Main Administrative Building at Balaghat Mine(83/Civil/BGT/16-17/3203 Date 31.07.2016) 01-08-2016 12-08-2016 12-08-2016 12-08-2016 04:30 PM Active View
88. Construction of Toilet and Bathroom at Premises of MOIL Canteen at Tirodi Mine(Civil/HO/2016-17/TRD/330 Dated 16.07.2016) 30-07-2016 09-08-2016 09-08-2016 09-08-2016 04:30 PM Active View
89. Monsoon preparatory works for repar to RCC roof of labour staff quarter officers quarters at Tirodi(Civil/HO/2016-17/TRD/327 Dated 16.07.2016) 30-07-2016 12-08-2016 12-08-2016 12-08-2016 04:30 PM Active View
90. Removal of spillage material during hoisting of skip from 15th Level Production Shaft at Balaghat Mine(Agent SDGM(M)/BGT/Mining/16-17/3145 Date 28.07.16) 29-07-2016 08-08-2016 08-08-2016 08-08-2016 04:30 PM Active View
91. Replacing old damaged A.C. Sheet with colour coated Galvalume profile sheet of D.G. Set Shed at MOIL Bhawan premises,MOIL,Nagpur.(Civil /HO/16-17 /HO/16 Dated - 28/07/2016) 28-07-2016 09-08-2016 09-08-2016 09-08-2016 03:30 PM Active View
92. Providing and Fixing MS Door old Residential Quarter at Tirodi Mine(Civil/HO/2016-17/TRD/334 Dated 16.07.2016) 28-07-2016 09-08-2016 09-08-2016 09-08-2016 04:30 PM Active View
93. Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine(GM(M)-III/CONT/28/Tub/GUM/16-17/23) 28-07-2016 04-08-2016 04-08-2016 04-08-2016 03:30 PM Active View
94. PURCHASE OF SHOT FIRING CABLE(PUR/MOIL/C-3/30/E-26/812-M DT.27/07/2016) 28-07-2016 10-08-2016 10-08-2016 10-08-2016 03:30 PM Active View
95. Construction of Drain in front of country tiles roof south staff quarters and near A type quarters(Civil/HO/2016-17/TRD/333 dated 16.07.2016) 28-07-2016 13-08-2016 13-08-2016 13-08-2016 04:30 PM Active View
96. Construction of stone masonry retaining wall at mine area at Sitapator(Civil/HO/2016-17/SITA/332 dated 16.07.2016) 28-07-2016 13-08-2016 13-08-2016 13-08-2016 04:30 PM Active View
97. Construction of store room and tool room at Sitapatore Mine(Civil/HO/2016-17/Sita/331 dated 16.07.2016) 28-07-2016 13-08-2016 13-08-2016 13-08-2016 04:30 PM Active View
98. Removal of waste rock and manganiferrous rock and handling the same by mech. means at Old Satuk section at Beldongri Mine(MOIL/2016-17/ET/67) 28-07-2016 30-08-2016 30-08-2016 30-08-2016 03:30 PM Active View
99. Construction of Shed for Sabhamandap at Village Fetri,Dist-Nagpur Under MOIL CSR.(Civil /HO/16-17 /CSR/15 Dated - 25/07/2016) 26-07-2016 03-08-2016 03-08-2016 03-08-2016 03:30 PM Active View
100. Requirement of Special Purpose CTD Rod Turning Machine for Balaghat Mine(BGT/MECH/CTD/16-17/3055 Date 24/07/2016) 25-07-2016 09-08-2016 09-08-2016 09-08-2016 04:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.