Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Picking and collection of material from contaminated low grade ROM near Jhiriya Dump site at Dongri Buzurg Mine(MOIL/17-18/ET/117) | 21-07-2017 | 23-08-2017 | 23-08-2017 | 23-08-2017 | 03:30 PM | Active | View |
2. | Underground Development at 12th Level (North Section) at Balaghat Mine(MOIL/17-18/ET/115) | 21-07-2017 | 23-08-2017 | 23-08-2017 | 23-08-2017 | 03:30 PM | Active | View |
3. | Picking and collection of SM Grade Mn ore MSL-521 MSL-447 MSL-522 MSL-498 from dump at Munsar Mine(MOIL/17-18/ET/119) | 21-07-2017 | 30-08-2017 | 30-08-2017 | 30-08-2017 | 03:30 PM | Active | View |
4. | Construction of Community Hall at Village Ghubadghondi Distt Balaghat Under CSR(MOIL/17-18/ET/ 112) | 20-07-2017 | 18-08-2017 | 18-08-2017 | 18-08-2017 | 03:30 PM | Active | View |
5. | Fabrication, erection and installation of Over Head Retro reflective information Sign Board with allied civil works at Main Entrance near to PWD Road at Balaghat Mine(MOIL/17-18/ET/ 95) | 19-07-2017 | 31-07-2017 | 31-07-2017 | 31-07-2017 | 03:30 PM | Active | View |
6. | Water Proofing to old Electrical Sub station and H.T. room building at Chikla Mine.(MOIL/17-18/ET/ 91) | 17-07-2017 | 11-08-2017 | 11-08-2017 | 11-08-2017 | 03:30 PM | Active | View |
7. | SULPHURIC ACID(PUR/MOIL/C-11/3/WE-36 (MOIL/17-18/ET/114)) | 17-07-2017 | 31-07-2017 | 31-07-2017 | 31-07-2017 | 03:30 PM | Active | View |
8. | Construction of Bituminous Tar Road from State Highway near Bherveli Village Up to Central School /CRPF Cantonment Distt Balaghat Under CSR(MOIL/17-18/ET/111) | 17-07-2017 | 18-08-2017 | 18-08-2017 | 18-08-2017 | 03:30 PM | Active | View |
9. | Supply of Garbage Collection Trolly and Supply and Installation of Tree Guards along with Plantation in 26 Villages Under CSR.(MOIL/17-18/ET/109) | 17-07-2017 | 18-08-2017 | 18-08-2017 | 18-08-2017 | 03:30 PM | Active | View |
10. | Construction of Cement Concrete Road at Village Jagpur, Chargaon and Ratta District Balaghat under CSR(MOIL/17-18/ET/107) | 17-07-2017 | 18-08-2017 | 18-08-2017 | 18-08-2017 | 03:30 PM | Active | View |
11. | Construction of Cement Concrete Road at Village Banpuri DIstt Nagur ,Gudri, Kurmuda,and Other two villages Distt Bhandara Under CSR(MOIL/17-18/ET/110) | 17-07-2017 | 18-08-2017 | 18-08-2017 | 18-08-2017 | 03:30 PM | Active | View |
12. | Drilling of Borewells and Installation of Hand pumps at different villages of District Balaghat in (M.P) and District Bhandara and Nagpur in Maharashtra Under CSR(MOIL/17-18/ET/ 108) | 17-07-2017 | 18-08-2017 | 18-08-2017 | 18-08-2017 | 03:30 PM | Active | View |
13. | UNLOADING OF RAW MATERIALS AT FERRO MANGANESE PLANT, BALAGHAT MINE(MOIL/17-18/ET/102) | 15-07-2017 | 16-08-2017 | 16-08-2017 | 16-08-2017 | 03:30 PM | Active | View |
14. | JIGGING OF CRUDE METAL DUST AT FERRO MANGANESE PLANT, BALAGHAT MINE(MOIL/17-18/ET/103) | 15-07-2017 | 16-08-2017 | 16-08-2017 | 16-08-2017 | 03:30 PM | Active | View |
15. | PREPARATIONS OF SAMPLES AT FERRO MANGANESE PLANT, BALAGHAT MINE(MOIL/17-18/ET/104) | 15-07-2017 | 16-08-2017 | 16-08-2017 | 16-08-2017 | 03:30 PM | Active | View |
16. | Standby Winder Control System for Vertical Shaft Winder of Munsar Chikla and Kandri Mine(MOIL/17-18/ET/106) | 12-07-2017 | 11-08-2017 | 11-08-2017 | 11-08-2017 | 03:30 PM | Active | View |
17. | Manual Removal of Sludge from SK Tank at Integrated Manganese Beneficiation Plant, Balaghat Mine(IMB/BGT/TE/2017-18/2511) | 11-07-2017 | 17-07-2017 | 17-07-2017 | 17-07-2017 | 04:00 PM | Active | View |
18. | Picking and collectin of material from contaminated low grade ROM at Western side of Fagni Dump at Dongri Buzurg Mine(MOIL/17-18/ET/98) | 11-07-2017 | 11-08-2017 | 11-08-2017 | 11-08-2017 | 03:30 PM | Active | View |
19. | Picking and collection of material from contaminated low grade ROM at Western side of Quarry at Dongri Buzurg Mine(MOIL/17-18/ET/99) | 11-07-2017 | 11-08-2017 | 11-08-2017 | 11-08-2017 | 03:30 PM | Active | View |
20. | Maitenance of Gardens at various places at Chikla mine(MOIL/17-18/ET/ 92) | 11-07-2017 | 31-07-2017 | 31-07-2017 | 31-07-2017 | 03:30 PM | Active | View |
21. | Construction of Office Building and shed at Vertical shaft Chikla Mine.(MOIL/17-18/ET/ 90) | 11-07-2017 | 04-08-2017 | 04-08-2017 | 04-08-2017 | 03:30 PM | Active | View |
22. | Fabrication of Misccellaneous Items Balaghat Mine .(AGENT/BGT/MECH/MISC/17-18/ 2208) | 08-07-2017 | 15-07-2017 | 15-07-2017 | 15-07-2017 | 04:30 PM | Active | View |
23. | INVITATION OF PROPOSAL FOR APPOINTMENT OF COST AUDITOR FOR FINANCIAL YEAR 2017-18 | 08-07-2017 | 15-07-2017 | 15-07-2017 | 15-07-2017 | 2:00 | Active | View |
24. | INVITATION OF PROPOSAL FOR APPOINTMENT OF COST AUDITOR FOR FINANCIAL YEAR 2017-18 | 08-07-2017 | 25-07-2017 | 25-07-2017 | 25-07-2017 | 5:00 PM | Active | View |
25. | Instalation of CCTV System At Chikla Mi(TE/CH/CAPELECT/17-18/1252) | 07-07-2017 | 13-07-2017 | 13-07-2017 | 13-07-2017 | 03:30 PM | Active | View |
26. | Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPSs installed at Balaghat ,Ukwa Tirodi Mine(BGT/SYSTEM/AMC/2017-18/187 Date 06.07.2017) | 07-07-2017 | 13-07-2017 | 13-07-2017 | 13-07-2017 | 03:30 PM | Active | View |
27. | Crushing and Screening of low grade ROM by mobile crushing and screening plant for LGHS production at Dongri Buzurg Mine(MOIL/17-18/ET-105) | 07-07-2017 | 07-08-2017 | 07-08-2017 | 07-08-2017 | 03:30 PM | Active | View |
28. | PUSHING OF TUBS IN UNDERGROUND AT -250L AND -350 L AND AT SURFACE AT KANDRI MINE(GM(M)-III/UG/30/KAN/17-18/13) | 06-07-2017 | 14-07-2017 | 14-07-2017 | 14-07-2017 | 03:30 PM | Active | View |
29. | Tender for Refilling and maintenance of Fire Fighting Equipment and Extinguisher for the period of one year.(SDGM(SE)/63/FIRESTNG/17-18/07 dt.29-06-2017) | 01-07-2017 | 10-07-2017 | 10-07-2017 | 10-07-2017 | 03:00 PM | Active | View |
30. | Post construction Anti Termite Treatment to Guest House including Transit House and Annex Building at West Court premises, MOIL, Nagpur.(Civil /HO/17-18/HO/235) | 01-07-2017 | 19-07-2017 | 19-07-2017 | 19-07-2017 | 03:30 PM | Active | View |
31. | Wired/Wireless Internet Broadband Line Balaghat Mine(BG/System/Network/17-18/169 29.06.2017) | 30-06-2017 | 10-07-2017 | 10-07-2017 | 10-07-2017 | 03:30 PM | Active | View |
32. | Technical Bid for Wired/Wireless Internet Leased Line at Tirodi Mine.(BG/System/Network/17-18/170 29.06.2017) | 30-06-2017 | 10-07-2017 | 10-07-2017 | 10-07-2017 | 03:30 PM | Active | View |
33. | HIRING OF GOODWIN MAKE SUBMERSIBLE SLURRY PUMP FOR BALAGHAT MINE FOR 2 MONTHS(AGT/BGT/MECH/HIRPMP/17-18/2243 DTD 29.06.2017) | 30-06-2017 | 05-07-2017 | 05-07-2017 | 05-07-2017 | 04:25 PM | Active | View |
34. | Construction of Surface Infrastructure Buildings for second Vertical Shaft at Chikla Mine(MOIL/17-18/ET/ 83) | 30-06-2017 | 21-07-2017 | 21-07-2017 | 21-07-2017 | 03:30 PM | Active | View |
35. | DRILLING OF BORE HOLE 100 MM DIAMETER IN UNDERGROUND AT BALAGHAT MINE FOR THE 2017-18(AGENT/BGT/MECH/B-HOLE/17-18/ 2170) | 29-06-2017 | 13-07-2017 | 13-07-2017 | 13-07-2017 | 04:30 PM | Active | View |
36. | Replacement of transfer chute liners, bunker liners and chutes /bunker repair at IMB plant , Balaghat mine(AGENT/BGT/MECH/IMBP/17-18/2171 DTD 28.06.2017) | 29-06-2017 | 14-07-2017 | 14-07-2017 | 14-07-2017 | 04:30 pm | Active | View |
37. | Construction of Water Supply Scheme at Dongribuzurg Mine.(MOIL/17-18/ET/ 79) | 27-06-2017 | 10-07-2017 | 10-07-2017 | 10-07-2017 | 03:30 PM | Active | View |
38. | Extension of entrance adit RCC portal at 170 L at Munsar Mine(MOIL/17-18/ET/ 85) | 27-06-2017 | 27-07-2017 | 27-07-2017 | 27-07-2017 | 03:30 PM | Active | View |
39. | Construction of New OCF Shed at Kandri Mine(MOIL/17-18/ET/ 87) | 27-06-2017 | 27-07-2017 | 27-07-2017 | 27-07-2017 | 03:30 PM | Active | View |
40. | Repair of roof and fixing PVC false celling for back veranda and porch CMD Bunglow Nagpur(MOIL/17-18/ET/ 86) | 27-06-2017 | 27-07-2017 | 27-07-2017 | 27-07-2017 | 03:30 PM | Active | View |
41. | Providing furniture and interior works for company secretary, contract section and mechanical section on second floor MOIL Bhawan Nagpur.(MOIL/17-18/ET/ 84) | 27-06-2017 | 27-07-2017 | 27-07-2017 | 27-07-2017 | 03:30 PM | Active | View |
42. | Annual Repair to camp quarters at Kandri Mine(MOIL/17-18/ET/ 89) | 27-06-2017 | 28-07-2017 | 28-07-2017 | 28-07-2017 | 03:30 PM | Active | View |
43. | Construction of Cement concrete Road at Beldongri Mine.(MOIL/17-18/ET/ 88) | 27-06-2017 | 28-07-2017 | 28-07-2017 | 28-07-2017 | 03:30 PM | Active | View |
44. | TCT DRILL RODS - 4 ITEMS(WE-7 Dt.23/06/2017(e-Tender No. MOIL/17-18/ET/100)) | 23-06-2017 | 01-08-2017 | 01-08-2017 | 01-08-2017 | 03:30 PM | Active | View |
45. | Fabrication, supply, installation and commissioning of motorized tub Tippler arrangemant at Chikla.(TE/CH/MECH/17-18/1338 dated 20/06/2017) | 21-06-2017 | 28-06-2017 | 28-06-2017 | 28-06-2017 | 03:30 PM | Active | View |
46. | Modification of conveyor belt system by changing belt width from 400 mm to 600 mm for Chikla Mine.(TE/CH/MECH/17-18/1337 dated 20/06/2017) | 21-06-2017 | 28-06-2017 | 28-06-2017 | 28-06-2017 | 03:30 PM | Active | View |
47. | Fabrication and installation of new Grizzly and base frame for mounting of Tub tippler at Chikla.(TE/CH/MECH/17-18/1336 dated 20/06/2017) | 21-06-2017 | 28-06-2017 | 28-06-2017 | 28-06-2017 | 03:30 PM | Active | View |
48. | SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-5/28/E-81/88-M) | 21-06-2017 | 05-07-2017 | 05-07-2017 | 05-07-2017 | 03:30 PM | Active | View |
49. | e-procurement of Cage Suspension Gears - 3 items(PUR/MOIL/C-12/12/WE-35/ dt. 21/06/2017) | 21-06-2017 | 18-08-2017 | 18-08-2017 | 18-08-2017 | 03:30 PM | Active | View |
50. | HDPE WOOVEN SACK(PUR/MOIL/C-11/6/WE-32 (MOIL/17-18/ET/96) | 16-06-2017 | 20-07-2017 | 20-07-2017 | 20-07-2017 | 03:30 PM | Active | View |
51. | Excavation/stripping in manganiferrous rock at minu 300 ft level at Gumgaon Mine(GM(M)/28/UG-DEV/GUM/17-18/08) | 14-06-2017 | 23-06-2017 | 23-06-2017 | 23-06-2017 | 03:30 PM | Active | View |
52. | Modification of existing 24CFT tubs to 36CFT for enhancing the hosting capacity of Vertical shaft(TE/CH/MECH/17-18/1301 dated 12/06/2017) | 13-06-2017 | 19-06-2017 | 19-06-2017 | 19-06-2017 | 03:30 PM | Active | View |
53. | Water proofing by laying Dr. Fixit torch shield to Monglore tiled roof of A type quarters at Chikla Mine(TE/CH/CIVIL/17-18/959 dated 11/06/2017) | 13-06-2017 | 19-06-2017 | 19-06-2017 | 19-06-2017 | 03:30 PM | Active | View |
54. | Cleaning of surplus underground ROM at Munsar Mine(MOIL/17-18/ET/78) | 13-06-2017 | 12-07-2017 | 12-07-2017 | 12-07-2017 | 03:30 PM | Active | View |
55. | Additional excavation in manganiferous rock between (17 Nos. X-cut to 19 X-cut) at -200 Level at Gumgaon Mine(MOIL/17-18/ET/80) | 13-06-2017 | 12-07-2017 | 12-07-2017 | 12-07-2017 | 03:30 PM | Active | View |
56. | Transportation of underground and surface tub at Kandri Mine(MOIL/17-18/ET/77) | 13-06-2017 | 12-07-2017 | 12-07-2017 | 12-07-2017 | 03:30 PM | Active | View |
57. | Transportation of ROM tub from vertical shaft top to OCF at Beldongri Mine(MOIL/17-18/ET/76) | 13-06-2017 | 12-07-2017 | 12-07-2017 | 12-07-2017 | 03:30 PM | Active | View |
58. | e-procurement of Butterfly Valves-3 items- L and T or AUDCO Make(WE-33 e-tender No.MOIL/17-18/ET-82, Dt.12.06.2017) | 12-06-2017 | 08-08-2017 | 08-08-2017 | 08-08-2017 | 03:30 PM | Active | View |
59. | CLEANING OF SURPLUS OPENCAST ROM AT KANDRI MINE(MOIL/7-18/ET/72) | 09-06-2017 | 10-07-2017 | 10-07-2017 | 10-07-2017 | 03:30 PM | Active | View |
60. | SUPPLY OF BLACK GITTI FOR CONCRETING AT MUNSAR MINE(MOIL/7-8/ET/75) | 09-06-2017 | 10-07-2017 | 10-07-2017 | 10-07-2017 | 03:30 PM | Active | View |
61. | CLEANING OF SURPLUS UNDERGROUNG ROM AT KANDRI MINE(MOIL/17-18/ET/73) | 09-06-2017 | 10-07-2017 | 10-07-2017 | 10-07-2017 | 03:30 PM | Active | View |
62. | Rate Contract for rewinding of LT Motors upto 25HP, Submersible Pumps upto 45HP, Ceiling Fans and Exhaust Fans at Balaghat Mine for a period of one year(Elect/BGT/Rewinding/2017-18/1598 Date 04.06.2017) | 09-06-2017 | 30-06-2017 | 30-06-2017 | 30-06-2017 | 04:30 PM | Active | View |
63. | PICKING AND COOECTION OF UKI-448 FROM F/W DUMP AT UKWA MINE(MOIL/17-18/ET/74) | 09-06-2017 | 12-07-2017 | 12-07-2017 | 12-07-2017 | 03:30 PM | Active | View |
64. | Cleaning of ROM recovered from Pit No.6 at Sitapatore Mine(MOIL/17-18/ET/70) | 07-06-2017 | 06-07-2017 | 06-07-2017 | 06-07-2017 | 03:30 PM | Active | View |
65. | Picking and collection of material from South Staff Quarter waste dump at Tirodi Mine(MOIL/17-18/ET/67) | 07-06-2017 | 06-07-2017 | 06-07-2017 | 06-07-2017 | 03:30 PM | Active | View |
66. | Picking and collection of material to recover Ferro (TD-4505) and LGHS ore (TDL-439 and TDL-499) from waste dump (West side of D dump) at Tirodi Mine(MOIL/17-18/ET/68) | 07-06-2017 | 06-07-2017 | 06-07-2017 | 06-07-2017 | 03:30 PM | Active | View |
67. | Picking and collection of material from South A waste dump at Tirodi Mine(MOIL/17-18/ET/69) | 07-06-2017 | 06-07-2017 | 06-07-2017 | 06-07-2017 | 03:30 PM | Active | View |
68. | Cleaning of ROM recovered from Pit No.5 at Sitapatore Mine(MOIL/17-18/ET/71) | 07-06-2017 | 10-07-2017 | 10-07-2017 | 10-07-2017 | 03:30 PM | Active | View |
69. | e procurement of Tramline Accessories 07 Items(WE-31 e-tender No.MOIL/17-18/ET-81, Dt.07.06.2017) | 07-06-2017 | 11-07-2017 | 11-07-2017 | 11-07-2017 | 03:30 PM | Active | View |
70. | Cleaning of ROM recovered from Pit No.6 at Sitapatore Mine(MOIL/17-18/ET/70) | 07-06-2017 | 06-07-2017 | 06-07-2017 | 06-07-2017 | 03:30 PM | Active | View |
71. | Picking and collection of material from South Staff Quarter waste dump at Tirodi Mine(MOIL/17-18/ET/67) | 07-06-2017 | 06-07-2017 | 06-07-2017 | 06-07-2017 | 03:30 PM | Active | View |
72. | Picking and collection of material to recover Ferro (TD-4505) and LGHS ore (TDL-439 and TDL-499) from waste dump (West side of D dump) at Tirodi Mine(MOIL/17-18/ET/68) | 07-06-2017 | 06-07-2017 | 06-07-2017 | 06-07-2017 | 03:30 PM | Active | View |
73. | Picking and collection of material from South A waste dump at Tirodi Mine(MOIL/17-18/ET/69) | 07-06-2017 | 06-07-2017 | 06-07-2017 | 06-07-2017 | 03:30 PM | Active | View |
74. | LOADING AND UNLOADING OF STEEL SECTION AND STACKING AT NOS KANDRI MINE(MOIL/17-18/ET-52) | 06-06-2017 | 21-06-2017 | 21-06-2017 | 21-06-2017 | 03:30 PM | Active | View |
75. | Loading and Unloading of steel and various materials in Dongri Buzurg Mine stores.(ADGM/DB/store/Loading-unloading/16-17/1260) | 05-06-2017 | 15-06-2017 | 15-06-2017 | 15-06-2017 | 04:30 PM | Active | View |
76. | Picking and sorting of 3rd grade lump and 25 percent Sm grade lump from dump ROM at Kandri Mine.(KAN/MIN/HO/AGENT/17-18/593 DT 02.06.2017) | 03-06-2017 | 13-07-2017 | 13-06-2017 | 13-06-2017 | 03:30 PM | Active | View |
77. | Picking and collection of material from cont. low grade ROM at Western side of Fagni Dump at D.B.Mine(CGM(Pr)/II/CONT/CL-ROM/19/DB/2017-18/9) | 02-06-2017 | 12-06-2017 | 12-06-2017 | 12-06-2017 | 03:30 PM | Active | View |
78. | Picking and collection of material from contaminated low grade ROM at Western side of Quarry at Dong(CGM(Pr)/II/CONT/CL-ROM/21/DB/2017-18/10) | 02-06-2017 | 16-06-2017 | 16-06-2017 | 16-06-2017 | 03:30 PM | Active | View |
79. | Picking and collection of material from contaminated low grade ROM at Dongri Buzurg Mine(CGM(Pr)/II/CONT/CL-ROM/20/DB/2017-18/8) | 01-06-2017 | 09-06-2017 | 09-06-2017 | 09-06-2017 | 03:30 PM | Active | View |
80. | Pushing and unloading of ROM and rock tubs in underground at Munsar Mine (GM(M)-III/CONT/26/Pushing/MUN/17-18/07) | 01-06-2017 | 08-06-2017 | 08-06-2017 | 08-06-2017 | 3:30 pm | Active | View |
81. | Pushing and unloading of ROM and rock tubs in underground at Gumgaon mine (GM(M)-III/CONT/23/PUSHING/GUM/17-18/06) | 01-06-2017 | 08-06-2017 | 08-06-2017 | 08-06-2017 | 3:30 pm | Active | View |
82. | Accessories for Cable Bolting Machine(PUR/MOIL/C-5/13/WE-17 (MOIL/17-18/ET/66)) | 01-06-2017 | 28-06-2017 | 28-06-2017 | 28-06-2017 | 03:30 PM | Active | View |
83. | Construction of Cement Concrete Roads at Balaghat Mine (MOIL/17-18/ET/ 44) | 01-06-2017 | 30-06-2017 | 30-06-2017 | 30-06-2017 | 3:30 pm | Active | View |
84. | Reataining Wall for New Road near North C section at Tirodi Mine(TRD/Civil/A/2017-18/561) | 31-05-2017 | 09-06-2017 | 09-06-2017 | 09-06-2017 | 04:30 PM | Active | View |
85. | Raking of Raw Materials, Preparation of sand beds For casting of metal and Slag and other furnace Operating works of Ferro Manganese Plant at Balaghat Mine(MOIL/17-18/ET/59) | 31-05-2017 | 30-06-2017 | 30-06-2017 | 30-06-2017 | 03:30 PM | Active | View |
86. | Monsoon preperation work at open cast surface and 13 level area and desilting and cleaning of sump 100,200,400 at Gumgaon Mine(Min/Gum/17-18/506 Date 25.05.2017) | 27-05-2017 | 02-06-2017 | 02-06-2017 | 02-06-2017 | 04:30 PM | Active | View |
87. | Providing and Applying Distemper ,Snowcem ,White Wash ,Oil Painting and Other Civil Work at Mine Manager Boungalow Tirodi Mine.(TRD/Civil/A/2017-18/531) | 26-05-2017 | 01-06-2017 | 01-06-2017 | 01-06-2017 | 04:30 PM | Active | View |
88. | Drilling of small dia holes at Sitapatore Mine.(S-S/Drilling/HO/2017-18/551) | 26-05-2017 | 02-06-2017 | 02-06-2017 | 02-06-2017 | 04:30 PM | Active | View |
89. | e-Procurement of Miners Canvas Safety Boots from MSE- Micro Small Enterprise firms only(WE-21 e-tender No.MOIL/17-18/ET-65, Dt.26.05.2017) | 26-05-2017 | 29-06-2017 | 29-06-2017 | 29-06-2017 | 03:30 PM | Active | View |
90. | Designing and printing of Annual Report 2016-17 Deluxe Version in English, Hindi and Marathi Shareholder version and Abridged Version in English, Translation of text from English to Hindi and Marathi and handling charges(MOIL/17-18/ET/60) | 25-05-2017 | 15-06-2017 | 15-06-2017 | 15-06-2017 | 03:30 PM | Active | View |
91. | Sampling and analysis of respirable dust in all mines, EMD plant of DongriBuzurg mine and Ferro Manganese plant of Balaghat mine by personal dust sampler(MOIL/17-18/ET/57) | 25-05-2017 | 23-06-2017 | 23-06-2017 | 23-06-2017 | 03:30 PM | Active | View |
92. | e-Procurement of Safety Rubber Ankle Boots from MSE firms only(WE-20 e-tender No.MOIL/17-18/ET-63, Dt.25.05.2017) | 25-05-2017 | 27-06-2017 | 27-06-2017 | 27-06-2017 | 03:30 PM | Active | View |
93. | DISPATCH WORK OF ANNUAL REPORT AND ABRIDGED FINANCIAL STATEMENTS FOR 2016-17 OF MOIL LIMITED(MOIL/17-18/ET/61) | 25-05-2017 | 11-07-2017 | 11-07-2017 | 11-07-2017 | 03:30 PM | Active | View |
94. | Hydraulic Vibro Ripper attachment for Excavator for Tirodi Mine - 1 No.(Only Through e-procurement)(WE-16 DT.25/05/2017, eTENDER NO.MOIL/17-18/ET/62) | 25-05-2017 | 24-07-2017 | 24-07-2017 | 24-07-2017 | 03:30 PM | Active | View |
95. | Supply of Dry Density Separator Units for Munsar Mine - 2 Nos. (Only Through e-procurement)(WE-18 DT.25/05/2017, eTENDER NO.MOIL/17-18/ET/64) | 25-05-2017 | 24-07-2017 | 24-07-2017 | 24-07-2017 | 03:30 PM | Active | View |
96. | Supply of Dry Density Separator Units for Munsar Mine - 2 Nos. (Only Through e-procurement)(WE-18 DT.25/05/2017, eTENDER NO.MOIL/17-18/ET/64) | 25-05-2017 | 22-08-2017 | 22-08-2017 | 22-08-2017 | 03:30 PM | Active | View |
97. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SAFETY HELMETS CONF. TO IS-2925-1984 WITH ISI MARK FROM MSE MICRO SMALL ENTERPRISE FIRMS ONLY(PUR/MOIL/C-1/189/E-06/180 -M dt. 24/05/2017) | 24-05-2017 | 16-06-2017 | 16-06-2017 | 16-06-2017 | 03:30 PM | Active | View |
98. | Rendering technical assistance services for Structural Designing of Pre-fabricated/Pre Engineering Industrial Sheds of Ferro Manganese Plant at Balaghta Mine (Civil/ HO/ 17-18/162) | 23-05-2017 | 31-05-2017 | 31-05-2017 | 31-05-2017 | 03:30 PM | Active | View |
99. | Sinking of Ventilation shaft 4.5m. dia. and 99m. depth from surface to 6th level in south section at Balaghat Mine(SDGMT/BGT/S-V-Shft/Ten/17-18/43 - MOIL/17-18/ET/30) | 23-05-2017 | 04-07-2017 | 04-07-2017 | 04-07-2017 | 03:30 PM | Active | View |
100. | Loading and unloading of steel section and various material with stacking at NOS Kandri Mine store(MOIL/17-18/ET/52) | 22-05-2017 | 01-06-2017 | 01-06-2017 | 01-06-2017 | 03:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |