Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Purchase of Grid Connected Roof Top Solar Power System - 3 Nos (3 Lots) (Only Through e-procurement)(WE-138 DT.07/02/2019 (ET/440)) 07-02-2019 05-03-2019 05-03-2019 06-03-2019 03:30 PM Active View
2. Purchase of LED Flood Lights for High Mast Towers - 492 Nos. (2 Lots) (Only Through e-procurement)(WE-140 Dt.07/02/2019 (ET/441)) 07-02-2019 05-03-2019 05-03-2019 06-03-2019 03:30 PM Active View
3. Extension of Stone pitching parafit wall around mine dump in between mine lease and purchase land at Balaghat Mine( CIVIL/BGT/T.E./2018-19/6417 DATE 21.01.2019) 06-02-2019 12-02-2019 12-02-2019 12-02-2019 04:30 PM Active View
4. WEB SITE TENDER ENQUIRYINTWO BIDSYSTEM FOR PURCHASE OF SET OF WORM WHEEL and SHAFT FOR GEAR BOX OF CONVEYOR BELT BC 2 OF CandS PLANT OF GUMGAON MINE 1 SET AS PER ANNEXURE A ENCLOSED(A-III/MUN/GUM/18-19/770 Date 05/02/2019) 06-02-2019 09-02-2019 09-02-2019 09-02-2019 04;00 PM Active View
5. Comprehensive Annual Maintenance Contract (CAMC) of computer hardware and peripherals(Agent an Sr DGM Group-III Mines/SYS/2018-19/765) 06-02-2019 16-02-2019 16-02-2019 16-02-2019 04:30 PM Active View
6. Railing and Transportation of ore at Kandri Mine(MOIL/18-19/ET/425) 05-02-2019 05-03-2019 05-03-2019 05-03-2019 03:30 PM Active View
7. Railing and Transportation of ore at Munsar Mine(MOIL/18-19/ET/426) 05-02-2019 05-03-2019 05-03-2019 05-03-2019 03:30 PM Active View
8. WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF STAINLESS STEEL BALL VALVES(PUR/MOIL/C-11/14/E-57/842-M Dt. 05-02-2019) 05-02-2019 20-03-2019 20-03-2019 20-03-2019 03:30 PM Active View
9. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF MS-CI - NRV, GATE VALVES AND BUTTERFLY VALVES(PUR/MOIL/C-11/148/E-58/843-M Dt. 05-02-2019) 05-02-2019 20-03-2019 20-03-2019 20-03-2019 03:30 PM Active View
10. SUPPLY, INSTALLATION COMMISSIONING OF OFC WIRED Armoured LAN CONNECTIVITY TO FERRO MANGANESE PLANT, AGENT OFFICE, FROM ADMIN BUILDING AT BALAGHAT MINE(BG/SYSTEM/NETWORK/2018-19/1535) 04-02-2019 12-02-2019 12-02-2019 12-02-2019 04;00 PM Active View
11. Purchase of Single Axis Joystick of Gessmann for Balaghat Mine(BGT/ELECT/TE/18-19/1517) 04-02-2019 11-03-2019 11-03-2019 11-03-2019 04;00 PM Active View
12. PURCHASE OF CUMMINS DIESEL ENGINE - 1 NO. SUITABLE FOR BEML MAKE BH35-2 DUMPER OPERATING AT DONGRI BUZURG MINE(M.S) (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/139/E-66/1006-M Dt.01/02/2019) 01-02-2019 22-02-2019 22-02-2019 22-02-2019 03:30 PM Active View
13. Railing and Transportation of ore at Beldongri Mine(MOIL/18-19/ET/428) 01-02-2019 01-03-2019 01-03-2019 01-03-2019 03:30 PM Active View
14. Railing and Transportation of ore at Tirodi Mine(MOIL/18-19/ET/424) 01-02-2019 01-03-2019 01-03-2019 01-03-2019 03:30 PM Active View
15. Railing and Transportation of ore at Sitapatore Mine(MOIL/18-19/ET/429) 01-02-2019 01-03-2019 01-03-2019 01-03-2019 03:00 PM Active View
16. Railing and Transportation of ore at Gumgaon Mine(MOIL/18-19/ET/427) 01-02-2019 01-03-2019 01-03-2019 01-03-2019 03:30 PM Active View
17. Construction of shed for 1500 KVA DG set for Khosla Compressor at Chikla Mine(MOIL/18-19/ET/409) 31-01-2019 08-03-2019 08-03-2019 08-03-2019 03:30 PM Active View
18. Construction of 3.3 KV Substation building, Panel room near crushing plant and store room near main vertical shaft at Chikla Mine.(MOIL/18-19/ET/410) 31-01-2019 08-03-2019 08-03-2019 08-03-2019 03:30 PM Active View
19. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR GODREJ SULLAIR MAKE COMPRESSOR(PUR/MOIL/C-5/34/E-61/943-M Dt. 31/01/2019) 31-01-2019 22-02-2019 22-02-2019 22-02-2019 03:30 PM Active View
20. Interior and exterior renovation works for Mine Managers Bungalow at Munsar Mine(MOIL/18-19/ET/413) 31-01-2019 01-03-2019 01-03-2019 01-03-2019 03:30 PM Active View
21. Construction of ventilation fan evassi with substation building at Gadhaghat, Chikla Mine.( MOIL/18-19/ET/408) 31-01-2019 01-03-2019 01-03-2019 01-03-2019 03:30 PM Active View
22. Maintenance and operation of water supply pumps for drinking water supply in camp quarters, officers colony, Adm building, Industrial buildings etc at Gumgaon Mine.(MOIL/18-19/ET/412) 31-01-2019 01-03-2019 01-03-2019 01-03-2019 03:30 PM Active View
23. Annual repairs to camp quarters, Officers quarters at Gumgaon Mine.(MOIL/18-19/ET/414) 31-01-2019 01-03-2019 01-03-2019 01-03-2019 03:30 PM Active View
24. Construction of Residences for Directors and Sr. Executives at West court compound of MOIL LTD at Nagpur(MOIL/18-19/ET/411) 31-01-2019 01-03-2019 01-03-2019 01-03-2019 03:30 PM Active View
25. Purchase of ERW PIPE-3 items(WE-134 e-tender No.MOIL/18-19/ET-431, Dt.30.01.19) 30-01-2019 26-02-2019 26-02-2019 27-02-2019 03:30 PM Active View
26. Purchase of M.S.LANCING PIPE - 24 MT(WE-137 e-tender No.MOIL/18-19/ET-430, Dt.30.01.19) 30-01-2019 11-03-2019 11-03-2019 12-03-2019 03:30 PM Active View
27. Railing and Transportation of ore at Balaghat Mine(MOIL/18-19/ET/421) 29-01-2019 28-02-2019 28-02-2019 28-02-2019 03:30 PM Active View
28. Railing and Transportation of ore at Dongri Buzurg Mine(MOIL/18-19/ET/422) 29-01-2019 28-02-2019 28-02-2019 28-02-2019 03:30 PM Active View
29. Railing and Transportation of ore at Chikla Mine(MOIL/18-19/ET/423) 29-01-2019 28-02-2019 28-02-2019 28-02-2019 03:30 PM Active View
30. Underground Horizontal development at 370 Level and 470 Level from 2nd Vertical section at Chikla Mine(MOIL/18-19/ET/417) 25-01-2019 25-02-2019 25-02-2019 25-02-2019 03:30 PM Active View
31. Obtaining Environment Clearance of mining lease below 5 Hectare of Sitapatore, Bharweli and Tirodi Mine(MOIL/18-19/ET/402) 25-01-2019 25-02-2019 25-02-2019 25-02-2019 03:30 PM Active View
32. Underground Horizontal and Vertical development at 470 Level of Chikla Vertical section at Chikla Mine(MOIL/18-19/ET/403) 25-01-2019 25-02-2019 25-02-2019 25-02-2019 03:30 PM Active View
33. PURCHASE OF LABORATORY CHEMICALS(PUR/MOIL/C-3/43/E-64/1969-M Dt. 23/01/2019) 23-01-2019 13-02-2019 13-02-2019 13-02-2019 03:30 PM Active View
34. Security guard for diamond drilling site at Chikla Mine( MOIL/18-19/ET/405) 22-01-2019 21-02-2019 21-02-2019 21-02-2019 03:30 PM Active View
35. Picking and collection of 3rd grade and LGHS ore from diluted ROM at South Pit North side at Tirodi Mine(MOIL/18-19/ET/404) 22-01-2019 21-02-2019 21-02-2019 21-02-2019 03:30 PM Active View
36. Ore tolley breaking work at CH22 Ukwa Mine(16/Mining/UM/18-19/2229) 22-01-2019 05-02-2019 05-02-2019 05-02-2019 04:30 PM Active View
37. Underground transportation of tubs at 1750Level Vertical shaft Ukwa Mine( 16/Mining/UM/18-19/2232) 22-01-2019 05-02-2019 05-02-2019 05-02-2019 04:30 PM Active View
38. Underground transportation of tubs at 1850Level Vertical shaft Ukwa Mine(16/Mining/UM/18-19/2235) 22-01-2019 05-02-2019 05-02-2019 05-02-2019 04:30 PM Active View
39. Purchase of Oil and Lubricants - 28 Items (Only Through e-procurement)(WE-117 DT.22/01/2019 (ET-419 AND ET-420)) 22-01-2019 12-02-2019 12-02-2019 13-02-2019 03:30 PM Active View
40. Trench cutting in ore stacks at Beldongri Mine(MOIL/18-19/ET/418) 22-01-2019 22-02-2019 22-02-2019 22-02-2019 03:30 PM Active View
41. Drilling of bore holes at Kesari camp, Sitasaongi of Chikla mine.(TE/MECH/19-20/7600003237/561 date 16/01/2019) 21-01-2019 28-01-2019 28-01-2019 28-01-2019 03:30 PM Active View
42. TENDER ENQUIRY IN SINGLE BID SYSTEM FOR SCREENING OF SIDING DEBRIDGE TO PRODUCE 340MT ORE(Lumpy) AND 300 MT FINES AT CHIKLA MINE(TE-24 Dt.21012019) 21-01-2019 28-01-2019 28-01-2019 28-01-2019 04:30 PM Active View
43. Providing, supplying, installation and commissioning of 33KV Outdoor type Vaccum Circuit Breaker with control panel at supply end for the feeder for proposed Vertical Shaft at Gumgaon Mine(MOIL/18-19/ET/401) 21-01-2019 20-02-2019 20-02-2019 20-02-2019 03:30 PM Active View
44. Inset Lighting Work at Various levels of Underground in vertical shaft of Munsar Mine(ELECT/MUN/ADGM/18-19/719) 19-01-2019 28-01-2019 28-01-2019 28-01-2019 03:30 PM Active View
45. Construction of retaining wall l at Jamrapani siding in end portion area at Tirodi Mine( TRD/CIVIL/2018-19/3273-A) 19-01-2019 29-01-2019 29-01-2019 29-01-2019 03:30 PM Active View
46. Flourscent Jackets( PUR-MOIL-C-1-190-E-63 dt. 19-01-2019) 19-01-2019 11-02-2019 11-02-2019 11-02-2019 03:30 PM Active View
47. Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine(16/Civil/UM/18-19/2169 Date 17-1-2019) 17-01-2019 31-01-2019 31-01-2019 31-01-2019 04:30 PM Active View
48. Safety Belts(PUR-MOIL-C-1-190-E-62 Dt. 17.01.2019) 17-01-2019 06-02-2019 06-02-2019 06-02-2019 03:30 PM Active View
49. Purchase of SODIUM CARBONATE - 24 MT(WE-132 e-tender No.MOIL/18-19/ET-416, Dt.17.01.19) 17-01-2019 14-02-2019 14-02-2019 15-02-2019 03:30 PM Active View
50. Purchase of Valveless DTH Hammers and Bits for ICM 260 Drilling Machine(WE-129 e-tender No.MOIL/18-19/ET-415, Dt.17.01.19) 17-01-2019 14-02-2019 14-02-2019 15-02-2019 03:30 PM Active View
51. Purchase of SODIUM CARBONATE - 24 MT(WE-132 e-tender No.MOIL/18-19/ET-416, Dt.17.01.19) 17-01-2019 14-02-2019 14-02-2019 15-02-2019 03:30 PM Active View
52. Purchase of Valveless DTH Hammers and Bits for ICM 260 Drilling Machine(WE-129 e-tender No.MOIL/18-19/ET-415, Dt.17.01.19) 17-01-2019 14-02-2019 14-02-2019 15-02-2019 03:30 PM Active View
53. Purchase of Cement Injection Pump Sets for Various Mines - 11 Nos (2 Lots) (Only Through e-procurement)( WE-116 DT.16/01/2019 (MOIL/18-19/ET/406)) 16-01-2019 11-02-2019 11-02-2019 12-02-2019 03:30 PM Active View
54. Purchase of Anchorage Testing Machines for various Mines - 4 Nos. (2 Lots) (Only Through e-procurement)(WE-133 DT.16/01/2019 (MOIL/18-19/ET/407)) 16-01-2019 11-02-2019 11-02-2019 12-02-2019 03:30 PM Active View
55. CONCRETING 25m3 OF FAN DRIFT (WINZE) AT CH-2830 OF CHIKLA MINE( TE-23 Dt.15012019) 15-01-2019 22-01-2019 22-01-2019 22-01-2019 04:30 PM Active View
56. Con of Guard Room at Mine Manager Premises at Balaghat Mine.(Civil/BGT/T.E./2018-19/22) 15-01-2019 24-01-2019 24-01-2019 24-01-2019 04:30 PM Active View
57. Renovation of Gymnasium at west court premises MOIL Nagpur.(MOIL/18-19/ET/377) 15-01-2019 04-02-2019 04-02-2019 04-02-2019 03:30 PM Active View
58. ADDITIONAL PILLAR OF RCC AT CHIKLA-B SECTION OF CHIKLA MINE(TE-22 Dt.14012019) 14-01-2019 21-01-2019 21-01-2019 21-01-2019 04:30 PM Active View
59. Purchase of Rear Dumpers with operation and maintenance spares (excluding tyres and tubes, oil and lubricants only) for Dongri Buzurg Mine(M.S) - 3 Nos.(2 Lots) (Only Through e-procurement)(WE-130 DT.14/01/2019 (MOIL/18-19/ET/400)) 14-01-2019 05-02-2019 05-02-2019 06-02-2019 03:30 PM Active View
60. Purchase of Remote Controlled, Light Weight, Electro-Hydraulic Drill Cum Loading Equipment with CAMC for Underground Mining Application at Balaghat Mine(M.P) - 1 No.(2 Lots) (Only Through e-procurement)(WE-128 DT.14/01/2019 (MOIL/18-19/ET/399)) 14-01-2019 05-02-2019 05-02-2019 06-02-2019 03:30 PM Active View
61. Construction of shed for Rectifier transformer in EMD plant( EMD/C/HO/18-19/422 DT 08/01/2019) 12-01-2019 19-01-2019 19-01-2019 19-01-2019 04:30 PM Active View
62. Explosives and Accessories - e-reverse auction(PUR/MOIL/C-6/214/WE/126 (MOIL/18-19//ET/396)) 11-01-2019 31-01-2019 31-01-2019 01-02-2019 03:30 PM Active View
63. Purchase of Electrically Operated Submersible Polder Pump - 4 Sets (2 Lots) (2 Sets each for Balaghat and Gumgaon Mine) (Only Through e-procurement)(WE-115 DT.10/01/2019 (MOIL/18-19/ET/398)) 10-01-2019 07-02-2019 07-02-2019 08-02-2019 03:30 PM Active View
64. Purchase of Undercarriage assemblies for Sandvik Make DI-500 Drilling Machine, Tata Hitachi EX-1200V Excavator and ZX-220LC Excavator and BEML make BE-700 Excavator( WE-127 e-tender No.MOIL/18-19/ET-397, Dt.10.01.19) 10-01-2019 07-02-2019 07-02-2019 08-02-2019 03:30 PM Active View
65. Comprehensive technical study for Slope Stability, Drilling and Blasting and Subsidence of Satuk Opencast mine over an area 5.62 HA. of MOIL Ltd., Nagpur(MOIL/18-19/ET/388) 09-01-2019 23-01-2019 23-01-2019 23-01-2019 03:30 PM Active View
66. Purchase of Incremental Encoder of Hubner Baumer for Balaghat Mine(BGT/Elect./TE/18-19/1316) 09-01-2019 25-01-2019 25-01-2019 25-01-2019 03:30 PM Active View
67. Providing and fixing barbed wire fencing to protect the saplings planted near D-dump area at Tirodi Mine(MOIL/18-19/ET/387) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
68. Maintenance of Garden at Kandri Mine(MOIL/18-19/ET/381) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
69. Drilling of borewell and installation hand pumps at different villages of district Balaghat (M.P.) and District Bhandara and Nagpur in (M.S.) under CSR for year 2018-2019(MOIL/18-19/ET/383) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
70. Construction of substation building at 50-52 section at Tirodi Mine(MOIL/18-19/ET/392) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
71. Maintenance of water filtration plant and operation and mainetnence of water supply scheme for new A type quarters at Tirodi Mine(MOIL/18-19/ET/382) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
72. Painting to plant structure of Integreted Manganese Benificiation plant IMB, at Balaghat Mine(MOIL/18-19/ET/389) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
73. Purchase of Crawler Mounted Side Dump Loader for Munsar Mine - 1 No.(2 Lots)(Only Through e-procurement)(WE-125 DT.07/01/2019 (MOIL/18-19/ET/395)) 08-01-2019 04-02-2019 04-02-2019 05-02-2019 03:30 PM Active View
74. Purchase of Load Haul Dump Machines along with all the spares (except oil and lubricants) required for operation and maintenance of offered equipment for 2000 Hours of operation for various mines - 3 Nos. (4 Lots)(Only Through e-procurement)(WE-124 DT.07/ 08-01-2019 05-02-2019 05-02-2019 06-02-2019 03:30 PM Active View
75. Supply of Timber (as per Annexure C Enclosed) (27 Lots)(Only Through e-procurement)( WE-118 DT.07/01/2019 (MOIL/18-19/ET/393)) 08-01-2019 05-02-2019 05-02-2019 06-02-2019 03:30 PM Active View
76. Purchase of Flange Mounted 37KW Sq Cage IM of Lakshmi Hydraulic Pvt Ltd(TE/18-19/1317) 07-01-2019 25-01-2019 25-01-2019 25-01-2019 04:00 PM Active View
77. Erection of new HT Overhead line from Gadhaghat 2nd Vertical substation to proposed Gadhaghat Ventilation Fan at Chikla Mine(MOIL/18-19/ET/385) 07-01-2019 06-02-2019 06-02-2019 06-02-2019 03:30 PM Active View
78. Hiring of equipments for removal of sub grade mineral reject of Underground ROM to recover SM Grade at Balaghat Mine(MOIL/18-19/ET/391) 07-01-2019 07-02-2019 07-02-2019 07-02-2019 03:30 PM Active View
79. Removal of Underground sub grade mineral reject and handling the same by mechanical means at Ukwa Mine(MOIL/18-19/ET/390) 07-01-2019 07-02-2019 07-02-2019 07-02-2019 03:30 PM Active View
80. Operation of dump screen to recover BGL-523 at Balaghat Mine(Mining/BGT/18-19/5831 Date 03.01.2019) 04-01-2019 10-01-2019 10-01-2019 10-01-2019 04:30 PM Active View
81. Procurement, Installation and Commissioning of HT VCB Panel, LT ACB Panel and transformer for operation of proposed 250 HP Ventilation fan at Gadhaghat of Chikla Mine(MOIL/18-19/ET/384) 04-01-2019 04-02-2019 04-02-2019 04-02-2019 03:30 PM Active View
82. PURCHASE OF MISCELLENEOUS ITEMS C CLASS AS PER ANNEXURE IV(MOIL/EMD/CH/ASDGM/2018-19/540) 02-01-2019 11-01-2019 11-01-2019 12-01-2019 03:30 PM Active View
83. Purchase of Miscellaneous Items C Class as per Annx III For emd plant.(MOIL/EMD/CH/ASDGM/2018-19/539) 02-01-2019 11-01-2019 11-01-2019 12-01-2019 03:30 PM Active View
84. Strength and heightning of Compound wall of MM bunglow at Balaghat Mine(BGT/CIVIL/18-19/18 DATE 31.12.2018) 01-01-2019 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active View
85. Fixing of chain link fencing with concertina coil fencing at Balaghat mine.(BGT/CIVIL/18-19/17 DATE 31.12.2018) 01-01-2019 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active View
86. Const of Guard room at Agent Bunglow premises Balaghat Mine(BGT/CIVIL/18-19/19 DATE 31.12.2018) 01-01-2019 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active View
87. Underground Development work at Kandri Mine(MOIL/18-19/ET/386) 01-01-2019 14-01-2019 14-01-2019 14-01-2019 03:30 PM Active View
88. Underground concreting at 1750 Level at Ukwa Mine(MOIL/18-19/ET/378) 01-01-2019 04-02-2019 04-02-2019 04-02-2019 03:30 PM Active View
89. Pushing and unloading of ROM and rock tubs at surface at Chikla Mine(MOIL/18-19/ET/376) 01-01-2019 01-02-2019 01-02-2019 01-02-2019 03:30 PM Active View
90. Operation of vibrating screen to screen sub grade mineral reject of underground ROM at Balaghat Mine( MOIL/18-19/ET/380) 01-01-2019 01-02-2019 01-02-2019 01-02-2019 03:30 PM Active View
91. Removal of spillage material accumulated during hoisting of skip from 15th Level of production shaft at Balaghat Mine(MOIL/18-19/ET/379) 01-01-2019 01-02-2019 01-02-2019 01-02-2019 03:30 PM Active View
92. Additional excavation in Mangeniferous rock between Ch.33 to Ch.35 at 300 Level at Gumgaon Mine(MOIL/18-19/ET/374) 31-12-2018 31-01-2019 31-01-2019 31-01-2019 03:30 PM Active View
93. Picking and collection of 20 percent SM Grade ore CHL 535 from cleaning of sub-grade mineral reject from ROM at Magazine Dump West side section of Chikla Mine(MOIL/18-19/ET/375) 31-12-2018 31-01-2019 31-01-2019 31-01-2019 03:30 PM Active View
94. Transportation of sand from Kalaphata Ghat to Beldongri Mine(MOIL/18-19/ET/373) 31-12-2018 11-02-2019 11-02-2019 11-02-2019 03:30 PM Active View
95. WASHING OF BOTTOM EMD AT EMD PLANT DONGRI BUZURG MINE(MOIL/EMD/CH/SDGM/18-19/527) 29-12-2018 08-01-2019 08-01-2019 09-01-2019 10:30 AM Active View
96. Recovery of Reduced ore and EMD powder(MOIL/EMD/CH/SDGM/18-19/528) 29-12-2018 08-01-2019 08-01-2019 09-01-2019 10:30 AM Active View
97. Supply, Fabrication, Erection, Installation and Commissioning of belt Conveyor Charging System at Ferro Manganese Plant, Balaghat Mine.(MOIL/18-19/ET/364) 27-12-2018 25-01-2019 25-01-2019 25-01-2019 03:30 PM Active View
98. Removal of waste rock in the H W benches from Ch.39 to Ch.50 and handling the same by mechanized means at Dongri Buzurg Mine( MOIL/18-19/ET/369) 27-12-2018 28-01-2019 28-01-2019 28-01-2019 03:30 PM Active View
99. Construction of stone pitching and RCC Ramp for Diesel Pump at Munsar Mine( MUN/CIVIL/NIT/18-19/144 DT 25.12.2018) 25-12-2018 05-01-2019 05-01-2019 05-01-2019 04:30 PM Active View
100. Hiring of Excavator for cleaning of fines pond Niagara plant at Ukwa Mine( 16/Mining/UM/18-19/1991) 24-12-2018 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (205) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.