Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | A Construction of siding office by the side of weight bridge at Gumgaon Mine. And B Providing and fixing of paving block at front side of recreation hall cun sports club at Gumgaon Mine(MOIL/18-19/ET/228) | 06-09-2018 | 04-10-2018 | 04-10-2018 | 04-10-2018 | 03:30 PM | Active | View |
2. | Renovation of old B type quarter at Beldongri Mine(MOIL/18-19/ET/229) | 06-09-2018 | 05-10-2018 | 05-10-2018 | 05-10-2018 | 03:30 PM | Active | View |
3. | Trench cutting in ore stack for sampling at Tirodi Mine(MOIL/18-19/ET/250) | 06-09-2018 | 05-10-2018 | 05-10-2018 | 05-10-2018 | 03:30 PM | Active | View |
4. | Construction of childerns park at officers colony at Kandri Mine(MOIL/18-19/ET/231) | 06-09-2018 | 05-10-2018 | 05-10-2018 | 05-10-2018 | 03:30 PM | Active | View |
5. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PP MULTIFILAMENT FILTER CLOTH(PUR/MOIL/C-11/16/E-34/546-M Dt. 05-09-2018) | 05-09-2018 | 26-09-2018 | 26-09-2018 | 26-09-2018 | 03:30 PM | Active | View |
6. | Underground development at 15th Level at Balaghat Mine(MOIL/18-19/ET/245) | 05-09-2018 | 05-10-2018 | 05-10-2018 | 05-10-2018 | 03:30 PM | Active | View |
7. | Removal of waste rock and Manganiferous rock and handling the same by mechanized means from Pit No.6 at Sitapatore Mine(MOIL/18-19/ET/246) | 05-09-2018 | 05-10-2018 | 05-10-2018 | 05-10-2018 | 03:30 PM | Active | View |
8. | Retaining wall for new installation of pump house and platform for delivery section at ABC North Section at Tirodi Mine.(TRD/CIVIL/2018-19/2322-A) | 05-09-2018 | 12-09-2018 | 12-09-2018 | 12-09-2018 | 03:30 PM | Active | View |
9. | Providing of fencing to protected saplings at Tirodi Mine(TRD/CIVIL/2018-19/2322) | 05-09-2018 | 12-09-2018 | 12-09-2018 | 12-09-2018 | 03:30 PM | Active | View |
10. | Construction of OCF Jig section at Balaghat Mine(MOIL/18-19/ET/221) | 04-09-2018 | 28-09-2018 | 28-09-2018 | 28-09-2018 | 03:30 PM | Active | View |
11. | Transportation of underground tubs at Ch 10800 section of Ukwa Mine(16/Mining/UM/18-19/1170) | 03-09-2018 | 17-09-2018 | 17-09-2018 | 17-09-2018 | 04:30 PM | Active | View |
12. | Construction of RCC Wall for trammel near 2nd Vertical Shaft at Munsar Mine.(CIVIL/MUN/18-19/82 Dated 01.09.2018) | 03-09-2018 | 08-09-2018 | 08-09-2018 | 08-09-2018 | 04:30 PM | Active | View |
13. | Construction of RCC Platform for pouring Manganese Ore in Hopper of Mobile Crusher at Munsar Mine.( CIVIL/MUN/18-19/79 Dated 01.09.2018) | 03-09-2018 | 08-09-2018 | 08-09-2018 | 08-09-2018 | 04:30 PM | Active | View |
14. | Purchase of 40KVA D.G.Set - 1 No.(1 Lot) (Only Through e-procurement)( WE-86 DT.30/08/2018 (MOIL/18-19/ET/249)) | 30-08-2018 | 26-09-2018 | 26-09-2018 | 27-09-2018 | 03:30 PM | Active | View |
15. | Purchase of Corrective Surgery and Orthopaedic Appliances Unit - 6 Items (6 Lots) (Only Through e-procurement)( WE-85 DT.30/08/2018 (MOIL/18-19/ET/248)) | 30-08-2018 | 16-10-2018 | 16-10-2018 | 17-10-2018 | 03:30 PM | Active | View |
16. | A Construction of compound wall all around Agent bunglow at Balaghat Mine and B Interior renovation works for type quarter allotted to DGM in front of Administrative building at Balaghat Mine(MOIL/18-19/ET/223) | 29-08-2018 | 03-10-2018 | 03-10-2018 | 03-10-2018 | 03:30 PM | Active | View |
17. | A) Construction of new cement godown at Ukwa Mine and B) Shifting of vehicle parking shed at Ukwa Mine(MOIL/18-19/ET/224) | 29-08-2018 | 03-10-2018 | 03-10-2018 | 03-10-2018 | 03:30 PM | Active | View |
18. | A Construction of cement concrete road and cement concrete drains in 48 52 colony at Chikla mine and B Construction of Toilet block in Mine work shop at Chikla mine(MOIL/18-19/ET/226) | 29-08-2018 | 03-10-2018 | 03-10-2018 | 03-10-2018 | 03:30 PM | Active | View |
19. | laying of sewer Line(Civil/BGT/T.E./2017-18/3422) | 29-08-2018 | 08-09-2018 | 08-09-2018 | 08-09-2018 | 04:30 PM | Active | View |
20. | Installation of Bio Toilet(Civil/BGT/T.E./2018-19/3419) | 29-08-2018 | 08-09-2018 | 08-09-2018 | 08-09-2018 | 04:30 PM | Active | View |
21. | Reduction of Manganese Ore on Conversion basis for EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/237) | 28-08-2018 | 26-09-2018 | 26-09-2018 | 26-09-2018 | 03:30 PM | Active | View |
22. | TENDER ENQUIRY FOR PURCHASE OF MECHANICAL C CLASS ITEMS(TE/MOIL/FMP/MECH/18-19/163) | 27-08-2018 | 17-09-2018 | 17-09-2018 | 17-09-2018 | 03:30 PM | Active | View |
23. | PURCHASE OF ANALYTICAL BALANCE FOR FERRO MANGANESE PLANT, BALAGHAT MINE(PUR/MOIL/C-3/48/E-33/513-M DT.27.08.2018) | 27-08-2018 | 14-09-2018 | 14-09-2018 | 14-09-2018 | 03:30 PM | Active | View |
24. | Explosives and Accessories(PUR/MOIL/C-6/214/WE-55 (MOIL/18-19//ET/242)) | 25-08-2018 | 19-09-2018 | 19-09-2018 | 21-09-2018 | 09:30 AM | Active | View |
25. | Maintenance and operation of water supply scheme at at MOIL BHAWAN, CMD Bunglow, CMS with A type quarters, West Court with Guest huose, Transit House and Bansivilla area Compound MOIL, Nagpur(MOIL/18-19/ET/218) | 25-08-2018 | 12-09-2018 | 12-09-2018 | 12-09-2018 | 03:30 PM | Active | View |
26. | Equipping of 11KV Indoor substation at 5th level surface substation of Balaghat Mine(MOIL/18-19/ET/225) | 24-08-2018 | 21-09-2018 | 21-09-2018 | 21-09-2018 | 03:30 PM | Active | View |
27. | Setting up 54.25 KWp capacity, grid connected, Solar Power Trees at Corporate office MOIL Bhawan, Nagpur(MOIL/18-19/ET/232) | 24-08-2018 | 24-09-2018 | 24-09-2018 | 24-09-2018 | 03:30 PM | Active | View |
28. | Maintenance and operation of water supply scheme at Ukwa Mine(MOIL/18-19/ET/217) | 24-08-2018 | 24-09-2018 | 24-09-2018 | 24-09-2018 | 03:30 PM | Active | View |
29. | Maintenance and operation of water supply scheme at Balaghat Mine(MOIL/18-19/ET/216) | 24-08-2018 | 24-09-2018 | 24-09-2018 | 24-09-2018 | 03:30 PM | Active | View |
30. | Maintenance of Garden at Balaghat Mine(MOIL/18-19/ET/219) | 24-08-2018 | 24-09-2018 | 24-09-2018 | 24-09-2018 | 03:30 PM | Active | View |
31. | Procurement, installation and commissioning of Special Energy Meters(SEM) at Chikla, Kandri and Gumgaon Mine substation and respective substations of MSEDCL/MSPTCL(MOIL/18-19/ET/238) | 24-08-2018 | 31-08-2018 | 31-08-2018 | 31-08-2018 | 03:30 PM | Active | View |
32. | Purchase of Sand for Sand Stowing Plant at Kandri, Munsar and Beldongri Mine(MOIL/18-19/ET/235) | 24-08-2018 | 07-09-2018 | 07-09-2018 | 07-09-2018 | 03:30 PM | Active | View |
33. | Purchase of Sand for Sand Stowing Plant at Gumgaon Mine(MOIL/18-19/ET/236) | 24-08-2018 | 07-09-2018 | 07-09-2018 | 07-09-2018 | 03:30 PM | Active | View |
34. | Fabrication of Miscellaneous items a. Leather piston Packing for Air Legs b.Leather Cap Lamp Belts c. Rexin First Aid Kit Bag(AGENT/BGT/MECH/MISC/18-19/591 dtd 19.08.2018) | 23-08-2018 | 04-09-2018 | 04-09-2018 | 04-09-2018 | 04:30 PM | Active | View |
35. | Repairing of Track Components of Side Dump Loader no.6 in 11th Level Underground of Balaghat Mine( AGENT/BGT/MECH/SDL/18-19/616 Dtd 21.08.2018) | 23-08-2018 | 04-09-2018 | 04-09-2018 | 04-09-2018 | 04:30 PM | Active | View |
36. | PURCHASE OF C CLASS ITEMS -MISCELLANEOUS ITEM FOR KANDRI MINE.(AGT-GR.III/KD/2018-19/1653) | 22-08-2018 | 12-09-2018 | 12-09-2018 | 12-09-2018 | 03:30 PM | Active | View |
37. | Purchase of Reduction Gear Box-1 No.(1 Lot) for Man Winding Engine of Production Shaft at Balaghat Mine(M.P) (Only Through e-procurement)( WE-84 Dt.21/08/2018 (MOIL/18-19/ET/240)) | 21-08-2018 | 17-09-2018 | 17-09-2018 | 18-09-2018 | 03:30 PM | Active | View |
38. | Hiring of services for mobile/skid mounted crushing and screening plant with VSI unit for processing dump reject ore/sand pebbles including excavation transportation of raw materials and transportation of product for sand stowing at Balaghat Mine(MOIL/18- | 21-08-2018 | 19-09-2018 | 19-09-2018 | 19-09-2018 | 03:30 PM | Active | View |
39. | Blanket Rate Contract for one Year for supply of various types of Paints, Thinner etc( WE-78 DT.21.08.2018 (e-Tender no.MOIL/18-19/ET/241) | 21-08-2018 | 18-09-2018 | 18-09-2018 | 19-09-2018 | 03:30 PM | Active | View |
40. | Concreting of X cut between Ch.24 to Ch.30 at 300 Level for stope preparation at Gumgaon Mine(MOIL/18-19/ET/213) | 21-08-2018 | 21-09-2018 | 21-09-2018 | 21-09-2018 | 03:30 PM | Active | View |
41. | Making and Supply of stemming material Mud plug used for blasting at Gumgaon Mine(MOIL/18-19/ET/214) | 21-08-2018 | 21-09-2018 | 21-09-2018 | 21-09-2018 | 03:30 PM | Active | View |
42. | Procurement of C class Items for Ferro Manganese Plant(FMP/TE/Elect/18-19/160) | 21-08-2018 | 05-09-2018 | 05-09-2018 | 05-09-2018 | 03:30 PM | Active | View |
43. | PURCHASE OF FASTNERS,WIRE NAILS AND ROSE NAILS FOR BALAGHAT MINE(PUR/MOIL/BGT/FASTNER/18-19/607 dtd 20.08.2018) | 21-08-2018 | 11-09-2018 | 11-09-2018 | 11-09-2018 | 04:30 PM | Active | View |
44. | PURCHASE OF C CLASS ITEMS GRINDING WHEEL COTTON WASTE and WHITE CHINDI, TORCH CELL, HACKSAW BLADE, NYLON ROPE, MANILA ROPE, TEFLON TAPE and EMERY TAPE FOR KANDRI MINE( AGT-GR.III/KD/2018-19/1640) | 21-08-2018 | 11-09-2018 | 11-09-2018 | 11-09-2018 | 03:30 PM | Active | View |
45. | Replacement of Buntons of Holmes Shaft at Balaghat Mine( BGT/MECH/PS/18-19/3358) | 20-08-2018 | 28-08-2018 | 28-08-2018 | 28-08-2018 | 04:00 PM | Active | View |
46. | Agrico implements( PUR-MOIl-C-1-196-E-32 dt -20-08-2018) | 20-08-2018 | 03-09-2018 | 03-09-2018 | 03-09-2018 | 03:30 PM | Active | View |
47. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES (PUR/MOIL/C-5/27/E-31/493-M Dt. 20/08/2018) | 20-08-2018 | 19-09-2018 | 19-09-2018 | 19-09-2018 | 3:30 PM | Active | View |
48. | Repairing of Track Rollers Assembly of Side Dump Loader-3 Nos operating at Balaghat Mine(AGT/BGT/MECH/SDL/18-19/590 dtd 19.08.2018) | 20-08-2018 | 04-09-2018 | 04-09-2018 | 04-09-2018 | 04:30 PM | Active | View |
49. | PURCHASE OF C CLASS ITEMS - PACKING MATERIAL FOR KANDRI MINE( AGT-GR.III/KD/2018-19/1623) | 20-08-2018 | 11-09-2018 | 11-09-2018 | 11-09-2018 | 03:30 PM | Active | View |
50. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES(PUR/MOIL/C-5/27/E-31/493-M Dt. 20/08/2018) | 20-08-2018 | 12-09-2018 | 12-09-2018 | 12-09-2018 | 03:30 PM | Active | View |
51. | EXTENSION OF RETAINING WALL FOR STABILITY OF LOOSE OVERBURDEN AT MOBILE CRUSHER AT MUNSAR MINE.(MUN/CIVIL/18-19/72 DT 17.08.2018) | 18-08-2018 | 24-08-2018 | 24-08-2018 | 24-08-2018 | 04:30 PM | Active | View |
52. | Underground Development Horizontal and Vertical at 170 Level of Vertical section at Chikla Mine(MOIL/18-19/ET/211) | 17-08-2018 | 17-09-2018 | 17-09-2018 | 17-09-2018 | 03:30 PM | Active | View |
53. | Removal of accumulated pebbles near sand stowing plants at Chikla Mine( MOIL/18-19/ET/212) | 17-08-2018 | 17-09-2018 | 17-09-2018 | 17-09-2018 | 03:30 PM | Active | View |
54. | Transportation of manganese ore from Gumgaon mine siding to Kandri Mine siding(MOIL/18-19/ET/215) | 17-08-2018 | 27-08-2018 | 27-08-2018 | 27-08-2018 | 03:30 PM | Active | View |
55. | Purchase of Tipper - 5 Nos for Various Mines (1 Lot) (Only Through e-procurement)( WE-71 DT.16/08/2018 (MOIL/18-19/ET/239)) | 16-08-2018 | 17-09-2018 | 17-09-2018 | 18-09-2018 | 03:30 PM | Active | View |
56. | PURCHASE OF C CLASS ITEMS PIPE FITTING ACCESSORIES FOR KANDRI MINE(AGT-GR.III/KD/2018-19/1562) | 13-08-2018 | 03-09-2018 | 03-09-2018 | 03-09-2018 | 03:30 PM | Active | View |
57. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF TENOVA DELKOR MAKE BUTTERFLY VALVE AND ACTUATOR(PUR/MOIL/C-11/129/E-29/481-M Dt. 13-08-2018) | 13-08-2018 | 05-09-2018 | 05-09-2018 | 05-09-2018 | 03:30 PM | Active | View |
58. | RCC work at CH-1800 and CH-2665 in -470 Level and -270 Level of Chikla Mine(TE-14 Dt.13082018) | 13-08-2018 | 20-08-2018 | 20-08-2018 | 20-08-2018 | 04:30 PM | Active | View |
59. | PURCHASE OF HIGH ENERGY EFFICIENT AXIAL FLOW FRP FAN - 2 SETS (1 SET CONTAINTS - 12 NOS.BLADES) (AS PER ANNEXURE A ENCLOSED).(PUR/MOIL/C-4/148/E-30/484-M Dt.09/08/2018) | 10-08-2018 | 03-09-2018 | 03-09-2018 | 03-09-2018 | 03:30 PM | Active | View |
60. | Purchase of Electrically Operated Auxiliary Ventilation Fan for Various Mines - 7 Nos. (2 Lots) (Only Through e-procurement)(WE-82 Dt.09/08/2018 (MOIL/18-19/ET/210)) | 09-08-2018 | 17-09-2018 | 17-09-2018 | 18-09-2018 | 03:30 PM | Active | View |
61. | Manual Removal of Sludge from S.K. Tank at I.M.B. Plant at Balaghat Mine(MOIL/18-19/ET/187) | 09-08-2018 | 06-09-2018 | 06-09-2018 | 06-09-2018 | 03:30 PM | Active | View |
62. | Raking of Raw Materials and Preparation of Sand beds and associated works at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/186) | 09-08-2018 | 06-09-2018 | 06-09-2018 | 06-09-2018 | 03:30 PM | Active | View |
63. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-28/472-M Dt. 09-08-2018) | 09-08-2018 | 31-08-2018 | 31-08-2018 | 31-08-2018 | 03:30 PM | Active | View |
64. | Purchase of Electrical HT/LT Cables (Assorted Size)( WE-56 DT.08.08.2018 (e-TenderNo.MOIL/18-19/ET-209)) | 09-08-2018 | 11-09-2018 | 11-09-2018 | 12-09-2018 | 03:30 PM | Active | View |
65. | Overhauling of Pollution Control Unit with Material at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/188) | 09-08-2018 | 07-09-2018 | 07-09-2018 | 07-09-2018 | 03:30 PM | Active | View |
66. | SUPPLY OF JAW PLATES FOR SAYAJI MAKE CRUSHER 20 X 12(SDGM/CHIKLA/MECH/TE/2018-19, 08/08/2018) | 08-08-2018 | 29-08-2018 | 29-08-2018 | 29-08-2018 | 03:30 PM | Active | View |
67. | Purchase of Head Gear Sheave Wheels, 3.6 Mtrs Dia. for Balaghat Mine - 2 Sets.(1 Lot) (Only Through e-procurement)( WE-81 Dt.08/08/2018 (MOIL/18-19/ET/208)) | 08-08-2018 | 10-09-2018 | 10-09-2018 | 11-09-2018 | 03:30 PM | Active | View |
68. | Additional excavation in Mangeniferous rock between Ch.24 to Ch.30 at 300 Level at Gumgaon Mine(MOIL/18-19/ET/196) | 06-08-2018 | 06-09-2018 | 06-09-2018 | 06-09-2018 | 03:30 PM | Active | View |
69. | Underground development at 13.5th Level at Balaghat Mine(MOIL/18-19/ET/195) | 06-08-2018 | 06-09-2018 | 06-09-2018 | 06-09-2018 | 03:30 PM | Active | View |
70. | Underground development at 11th Level South Section at Balaghat Mine(MOIL/18-19/ET/199) | 06-08-2018 | 06-09-2018 | 06-09-2018 | 06-09-2018 | 03:30 PM | Active | View |
71. | PURCHASE OF C CLASS ITEMS - WIRE and ROSE NAILS AND FASTENERS FOR KANDRI MINE(AGT-GR.III/KD/2018-19/1486) | 06-08-2018 | 27-08-2018 | 27-08-2018 | 27-08-2018 | 03:30 PM | Active | View |
72. | Handling of spillage ore and fines from various places of IMB plant at Dongri Buzurg Mine(MOIL/18-19/ET/197) | 06-08-2018 | 06-09-2018 | 06-09-2018 | 06-09-2018 | 03:30 PM | Active | View |
73. | Purchase of Hose Fittings for Rock Drill and Air Leg Machines(WE-68 e-tender No.MOIL/18-19/ET-207, Dt.06.08.18) | 06-08-2018 | 30-08-2018 | 30-08-2018 | 31-08-2018 | 03:30 PM | Active | View |
74. | Procurement of 33kV residual voltage transformer for capacitor bank..(fmp/elect/18-19/147) | 04-08-2018 | 24-08-2018 | 24-08-2018 | 24-08-2018 | 04:30 PM | Active | View |
75. | Procurement of Industrial man cooler pedestal fan(fmp/elect/18-19/146) | 04-08-2018 | 24-08-2018 | 24-08-2018 | 24-08-2018 | 04:30 PM | Active | View |
76. | SAPLING AT MINE DUMP AREA AT TIRODI MINE(TRD/CIVIL/2018-19/1065-A) | 04-08-2018 | 11-08-2018 | 11-08-2018 | 11-08-2018 | 03:30 PM | Active | View |
77. | Purchase of Undercarriage assemblies for Sandvik Make DI-500 Drilling Machine and BEML Make Dozer BD-85 and BD-155.(WE-75 e-tender No.MOIL/18-19/ET-206, Dt.03.08.18) | 03-08-2018 | 28-08-2018 | 28-08-2018 | 29-08-2018 | 03:30 PM | Active | View |
78. | Underground Concreting work at Chikla Mine(MOIL/18-19/ET/192) | 03-08-2018 | 03-09-2018 | 03-09-2018 | 03-09-2018 | 03:30 PM | Active | View |
79. | Pushing and unloading of tubs in underground and on surface at vertical shaft section at Ukwa Mine(MOIL/18-19/ET/193) | 03-08-2018 | 03-09-2018 | 03-09-2018 | 03-09-2018 | 03:30 PM | Active | View |
80. | Removal of waste rock and handling the same by mechanized means from South dump at Tirodi Mine(MOIL/18-19/ET/194) | 03-08-2018 | 03-09-2018 | 03-09-2018 | 03-09-2018 | 03:30 PM | Active | View |
81. | PURCHASE OF MATHER AND PLATT MAKE BARE PUMP (WITHOUT MOTOR AND ACCESSORIES) - 1 NO. FOR IMB PLANT, BALAGHAT MINE (M.P), AS PER ANNEXURE - A ENCLOSED.(PUR/MOIL/C-4/78/E-6/459 -M DT.03/08/2018) | 03-08-2018 | 31-08-2018 | 31-08-2018 | 31-08-2018 | 03:30 PM | Active | View |
82. | Purchase of Transformer - 14 Nos. (10 Lots) (Only Through e-procurement)(WE-72 DT.02/08/2018 (MOIL/18-19/ET/205)) | 02-08-2018 | 03-09-2018 | 03-09-2018 | 04-09-2018 | 03:30 PM | Active | View |
83. | Purchase of Cable Bolting Machine for Various Mines - 10 Nos.(2 Lots) (Only Through e-procurement)(WE-70 DT.01/08/2018 (MOIL/18-19/ET/203)) | 01-08-2018 | 04-09-2018 | 04-09-2018 | 05-09-2018 | 03:30 PM | Active | View |
84. | Purchase of High Mast Lighting System for Various Mines - 13 Nos. (2 Lots)(WE-73 DT.01/08/2018 (MOIL/18-19/ET/204)) | 01-08-2018 | 30-08-2018 | 30-08-2018 | 31-08-2018 | 03:30 PM | Active | View |
85. | Purchase of Steel Braided Rubber Hose(WE-69 e-tender No.MOIL/18-19/ET-202, Dt.01.08.18) | 01-08-2018 | 06-09-2018 | 06-09-2018 | 07-09-2018 | 03:30 PM | Active | View |
86. | PURCHASE OF C CLASS MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-12 DT.25072018) | 31-07-2018 | 20-08-2018 | 20-08-2018 | 20-08-2018 | 04:30 PM | Active | View |
87. | Underground Horizontal Development at 270 Level of Vertical section at Chikla Mine( MOIL/18-19/ET/189) | 31-07-2018 | 31-08-2018 | 31-08-2018 | 31-08-2018 | 03:30 PM | Active | View |
88. | Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine(MOIL/18-19/ET/190) | 31-07-2018 | 31-08-2018 | 31-08-2018 | 31-08-2018 | 03:30 PM | Active | View |
89. | Washing Picking and collection of material from 6 No. dumps of Sitapatore Mine(MOIL/18-19/ET/191) | 31-07-2018 | 31-08-2018 | 31-08-2018 | 31-08-2018 | 03:30 PM | Active | View |
90. | Annual repairs to camp quarters Munsar Mine and Construction of pitching of un-course rubble masonry for stability of siding plateform at Kandri Mine(MOIL/18-19/ET/165) | 30-07-2018 | 27-08-2018 | 27-08-2018 | 27-08-2018 | 03:30 PM | Active | View |
91. | Providing expoxy flooring for old and new workshop building of Balaghat Mine(MOIL/18-19/ET/167) | 30-07-2018 | 27-08-2018 | 27-08-2018 | 27-08-2018 | 03:30 PM | Active | View |
92. | Providing furniture and interial works for Marketing Department on first floor of MOIL Bhawan Nagpur(MOIL/18-19/ET/170) | 30-07-2018 | 28-08-2018 | 28-08-2018 | 28-08-2018 | 03:30 PM | Active | View |
93. | Painting to plant structure of integrated Manganese Beneficiation Plant IMB of Balaghat Mine(MOIL/18-19/ET/166) | 30-07-2018 | 27-08-2018 | 27-08-2018 | 27-08-2018 | 03:30 PM | Active | View |
94. | Construction of sample room, weight bridge room, metal beam crush barrier along the WBM road at Beldongri Mine and construction of Electric meter room at old Satak mine(MOIL/18-19/ET/163) | 30-07-2018 | 27-08-2018 | 27-08-2018 | 27-08-2018 | 03:30 PM | Active | View |
95. | Drilling of bore hole with installation of pump at Dongri Buzurg Mine(MOIL/18-19/ET/161) | 30-07-2018 | 27-08-2018 | 27-08-2018 | 27-08-2018 | 03:30 PM | Active | View |
96. | ADDITIONAL PILLAR OF RCC AT CHIKLA B SECTION OF CHIKLA MINE(TE-13 Dt.28072018) | 28-07-2018 | 06-08-2018 | 06-08-2018 | 06-08-2018 | 04:30 PM | Active | View |
97. | Manpower towards plantation under Plantation Drive at Munsar Mine.(MUN/CIVIL/18-19/59 Date 27.08.2018) | 28-07-2018 | 04-08-2018 | 04-08-2018 | 04-08-2018 | 04:30 PM | Active | View |
98. | Maintenance of Gardens at Ukwa Mine. (16/Civil/UM/18-19/878) | 26-07-2018 | 09-08-2018 | 09-08-2018 | 09-08-2018 | 4:30 PM | Active | View |
99. | Maintenance and operation of water supply scheme at Ukwa Mine (16/Civil/UM/18-19/879) | 26-07-2018 | 09-08-2018 | 09-08-2018 | 09-08-2018 | 4:30 PM | Active | View |
100. | Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine (16/Civil/UM/18-19/880) | 26-07-2018 | 09-08-2018 | 09-08-2018 | 09-08-2018 | 4:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |