Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Cleaning of Spillage Material Under and Around all the Equipment at I.M.B Plant at Balaghat Mine( MOIL/18-19/ET/353) | 17-12-2018 | 16-01-2019 | 16-01-2019 | 16-01-2019 | 03:30 PM | Active | View |
2. | Electrical heating system for electrolyte, in place of steam boiler heating system at new 500MT EMD Plant at Dongri Buzurg(MOIL/18-19/ET/352) | 15-12-2018 | 15-01-2019 | 15-01-2019 | 15-01-2019 | 03:30 PM | Active | View |
3. | Excavation, Cutting and Dressing Works towards development of approach road near Second Vertical Shaft at Munsar Mine.( MUN/CIVIL/NIT/18-19/134 Date 11.12.2018) | 14-12-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 04:30 PM | Active | View |
4. | PURCHASE OFGEARED MOTOR FOR 14.5 LEVEL CONVEYOR BELT AT BALAGHAT MINE(PUR/MOIL/BGT/18-19/1191 Dt. 10.12.2018) | 14-12-2018 | 26-12-2018 | 26-12-2018 | 26-12-2018 | 04:30 PM | Active | View |
5. | Fabrication of steel ore-pass and manways for Underground Mines i.e Balaghat, Ukwa Chikla Beldongri Munsar Kandri and Gumgaon Mine( MOIL/18-19/ET/351) | 14-12-2018 | 14-01-2019 | 14-01-2019 | 14-01-2019 | 03:30 PM | Active | View |
6. | PURCHASE OF STEEL WIRE ROPE - 12 MM (USHA MARTIN MAKE)(PUR/MOIL/C-3/23/E-40/588-M DT.13/12/2018) | 13-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | View |
7. | PURCHASE OF CONTROL VALVE FOR CTH141F FOR SANDVIK MAKE JUMBO DRILL MACHINE PN-77793404 AT BALAGHAT MINE( PUR/MOIL/BGT/18-19/1190 dtd 10.12.2018) | 13-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 04:30 PM | Active | View |
8. | Providing contractual manpower in IMB Plant for smooth operation of Plant at Dongri Buzurg Mine(MOIL/18-19/ET/356) | 11-12-2018 | 10-01-2019 | 10-01-2019 | 10-01-2019 | 03:30 PM | Active | View |
9. | Making a Retaining Wall on entry of IMB Plant at Balaghat Mine(Civil/BGT/T.E./2018-19/5372) | 10-12-2018 | 19-12-2018 | 19-12-2018 | 19-12-2018 | 04:30 PM | Active | View |
10. | Making of hume Pipe Culvert on Junction of Entry of Entry of IMB Plant at Balaghat Mine( Civil/BGT/T.E./2018-19/5386) | 10-12-2018 | 19-12-2018 | 19-12-2018 | 19-12-2018 | 04:30 PM | Active | View |
11. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HAMMER MILL( PUR/MOIL/C-11/23/E-54/836-M Dt. 10-12-2018) | 10-12-2018 | 02-01-2019 | 02-01-2019 | 02-01-2019 | 03:30 PM | Active | View |
12. | Renewal of Environmental Clearance in respect of Three Sand Mining leases i.e. Rajna, Ramdongri (Gumgaon), Kalaphata (Kandri) and Pathri (Chikla) of MOIL Ltd.(MOIL/18-19/ET/349) | 07-12-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 03:30 PM | Active | View |
13. | Hiring of 50 MT Capacity 2 Nos. Mobile Crane with 360 Degree revolving Telescopic Extended Boom for unloading and assembling of BH 60M Dumper 3 Nos. at Dongri Buzurg Mine(MOIL/18-19/ET/350) | 07-12-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 05:30 PM | Active | View |
14. | Obtaining Environmental Clearance for Ferro Alloy Plant (Metallurgical Ferrous and Non Ferrous Industry) at Gumgaon Mine (Maharashtra)(MOIL/18-19/ET/357) | 07-12-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 03:30 PM | Active | View |
15. | Construction of GSR for newly constructed A and C type Qtrs at Balaghat Mine(MOIL/18-19/ET/336) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | View |
16. | Maintenance of garden at Various places at Dongri Buzurg Mine(MOIL/18-19/ET/337) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | View |
17. | Maintenance and opration of water supply scheme at Dongri Buzurg Mine(MOIL/18-19/ET/338) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | View |
18. | Cleaning of sanitary pipe line drain chambers and removal of garbage from MOIL Premises Nagpur(MOIL/18-19/ET/339) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | View |
19. | Construction of Bituminous Tar road including widening of existing concrete road from village Mouli to kalaphata sand ghat tehsil Ramtek Distt Nagpur Under CSR(MOIL/18-19/ET/340) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | View |
20. | Strengthening of Foundation of 132 kw in IMB Plant at Balaghat Mine(Civil/BGT/T.E./2018-19/5332) | 06-12-2018 | 14-12-2018 | 14-12-2018 | 14-12-2018 | 04:30 PM | Active | View |
21. | Repairing of Roads from Arjun colony to Manegaon Mine Magazine and Agent Bungalaow to Service Magine at Balaghat Mine(Mining/BGT/T.E./18-19/5335) | 06-12-2018 | 14-12-2018 | 14-12-2018 | 14-12-2018 | 04:30 PM | Active | View |
22. | Purchase of Main PLC Control Panel with HMI for Operation of IMB Plant, Balaghat Mine(M.P) - 1 Set (1 Lot) (Only Through e-procurement)(WE-121 DT.05/12/2018 (MOIL/18-19/ET/358)) | 05-12-2018 | 01-01-2019 | 01-01-2019 | 02-01-2019 | 03:30 PM | Active | View |
23. | PURCHASE OF HIGH ENERGY EFFICIENT AXIAL FLOW FRP FAN BLADE - 2 SETS FOR NORTH AND SOUTH VENTILATION FAN AT BALAGHAT MINE(M.P) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/148/E-56/827-M DT.03/12/2018) | 03-12-2018 | 02-01-2019 | 02-01-2019 | 02-01-2019 | 03:30 PM | Active | View |
24. | Purchase of Steel RAILS 50 LBS/YARD for Vertical Shaft( WE-107 DT.01.12.2018(e-TenderNo. MOIL/18-19/ET/348) | 01-12-2018 | 26-12-2018 | 26-12-2018 | 27-12-2018 | 03:30 PM | Active | View |
25. | Purchase of Electrically Operated Air Cooled Screw Air Compressor with VFD, Capacity-1000 CFM - 2 Nos. (1 No.each for Gumgaon and Kandri Mine)(1 Lot.) (Only Through e-procurement)( WE-101 DT.30/11/2018 (MOIL/18-19/ET/347)) | 30-11-2018 | 14-01-2019 | 14-01-2019 | 15-01-2019 | 03:30 PM | Active | View |
26. | Purchase of Pneumatically operated Double Diaphragm Pumps for Various Mines - 11 Nos.(2 Lots) (Only Through e-procurement)(WE-119 DT.30/11/2018 (MOIL/18-19/ET/346)) | 30-11-2018 | 31-12-2018 | 31-12-2018 | 01-01-2019 | 03:30 PM | Active | View |
27. | Transportation of Coal to EMD Plant Dongri Buzurg Mine- 4800 MT(WE-114 e-tender No.MOIL/18-19/ET-345, Dt.29.11.18) | 29-11-2018 | 11-12-2018 | 11-12-2018 | 12-12-2018 | 03:30 PM | Active | View |
28. | Providing internet connectivity at Kandri., Munsar, Beldongri, Gumgaon, Ukwa Mines and and Nagpur Office(MOIL/18-19/ET/318) | 29-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 03:30 PM | Active | View |
29. | Transportation of Coal to EMD Plant Dongri Buzurg Mine- 4800 MT(WE-114 e-tender No.MOIL/18-19/ET-345, Dt.29.11.18) | 29-11-2018 | 11-12-2018 | 11-12-2018 | 12-12-2018 | 03:30 PM | Active | View |
30. | Providing internet connectivity at Kandri., Munsar, Beldongri, Gumgaon, Ukwa Mines and and Nagpur Office(MOIL/18-19/ET/318) | 29-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 03:30 PM | Active | View |
31. | Miscellaneous Contract Works to be carried out at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/316) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | View |
32. | Collection of canteen food items Collection of canteen food items and servicing it to mine employees at Chikla Mine through outside agency(MOIL/18-19/ET/335) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | View |
33. | Collection of canteen food items and servicing it to mine employees at Tirodi Mine through outside agency(MOIL/18-19/ET/334) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | View |
34. | Cleaning and sorting of ROM recovered from Pit No.6 at Sitapatore Mine(MOIL/18-19/ET/332) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | View |
35. | Trench cutting in ore stacks at Kandri Mine(MOIL/18-19/ET/331) | 27-11-2018 | 27-12-2018 | 27-12-2018 | 27-12-2018 | 03:30 PM | Active | View |
36. | Purchase of Sand for Sand Stowing Plant at Gumgaon Mine(MOIL/18-19/ET/329) | 27-11-2018 | 27-12-2018 | 27-12-2018 | 27-12-2018 | 03:30 PM | Active | View |
37. | Purchase of Sand for Sand Stowing Plant at Kandri Munsar and Beldongri Mine(MOIL/18-19/ET/328) | 27-11-2018 | 27-12-2018 | 27-12-2018 | 27-12-2018 | 03:30 PM | Active | View |
38. | Loading of Slag at Ferro Manganese Plant, Balaghat Mine( MOIL/18-19/ET/315) | 27-11-2018 | 26-12-2018 | 26-12-2018 | 26-12-2018 | 03:30 PM | Active | View |
39. | Purchase of HIGH DENSITY POLY ETHYLENE-HDPE WOOVEN SACKS - 30150 NOS.(WE-108 e-tender No.MOIL/18-19/ET-344, Dt.27.11.18) | 27-11-2018 | 01-01-2019 | 01-01-2019 | 02-01-2019 | 03:30 PM | Active | View |
40. | Extra excavation in Mangeniferous rock at 5th Level of vertical shaft section of Chikla Mine(MOIL/18-19/ET/330) | 26-11-2018 | 10-12-2018 | 10-12-2018 | 10-12-2018 | 03:30 PM | Active | View |
41. | Extra excavation in Mangeniferous rock at 70 Level of Chikla B section of Chikla Mine(MOIL/18-19/ET/333) | 26-11-2018 | 10-12-2018 | 10-12-2018 | 10-12-2018 | 03:30 PM | Active | View |
42. | PURCHASE OF MOTOR REDUCER (TRACK DRIVE GEAR BOX) (MAKE - SANDVIK ASIA PVT.LTD.) - 1 NO.FOR BALAGHAT MINE(M.P) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/240/E-55/794-M DT.26/11/2018) | 26-11-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 03:30 PM | Active | View |
43. | REPAIRING OF AIR CONDITIONING UNIT OF HEAVY EARTH MOVING MACHINERIES AT DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/482) | 26-11-2018 | 07-12-2018 | 07-12-2018 | 07-12-2018 | 04:30 PM | Active | View |
44. | REPAIRING OF TRACK ROLLERS OF BEML DOZER BD155 NO.3 OF DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/483) | 26-11-2018 | 07-12-2018 | 07-12-2018 | 07-12-2018 | 04:30 PM | Active | View |
45. | REPAIRING OF BOOM CYLINDER OF TATAT HITACHI 450 HYDRAULIC EXCAVATOR OPERTING AT DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/481) | 26-11-2018 | 07-12-2018 | 07-12-2018 | 07-12-2018 | 04:30 PM | Active | View |
46. | Drilling of 57 mm dia holes apremining support for installing cabel bolt in Manginifferous rock in between ch 07 to 11 Level at Balaghat Mine( Mining/BGT/T.E./18-19/5214) | 26-11-2018 | 04-12-2018 | 04-12-2018 | 04-12-2018 | 04:30 PM | Active | View |
47. | PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE(PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) | 23-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 04:30 PM | Active | View |
48. | PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE(PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) | 23-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 04:30 PM | Active | View |
49. | PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE( PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) | 23-11-2018 | 03-12-2018 | 03-12-2018 | 03-12-2018 | 04:30 PM | Active | View |
50. | Annual Rate Contract for supply of Cement Capsules - 446700 Nos.(WE-109 DT.22.11.2018(e-TenderNo. MOIL/18-19/ET/342) | 22-11-2018 | 13-12-2018 | 13-12-2018 | 14-12-2018 | 03:30 PM | Active | View |
51. | Designing, Engineering, Supplying, Installation, Commissioning and Testing of 2 X 1600KVA, 11KV/433V Indoor Substation for Second Vertical Shaft Project at Ukwa Mine(MOIL/18-19/ET/307) | 22-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | View |
52. | Diamond Drill Bits and Accessories- 7 Items.(WE-105 DT.22.11.2018 (e-TenderNo.MOIL/18-19/ET/343) | 22-11-2018 | 24-01-2019 | 24-01-2019 | 25-01-2019 | 03:30 PM | Active | View |
53. | DUST MASK, EAR PLUGS, EAR MUFF(PUR-MOIL-C-1 190-WE-103-ET-327 dt. 20/11/2018) | 20-11-2018 | 17-12-2018 | 17-12-2018 | 18-12-2018 | 03:30 PM | Active | View |
54. | C. I. SHEAVE WHEEL 2800mm DIA(PUR-MOIL-C-12-50-WE-113-ET-326 dt. 19-11-2018) | 19-11-2018 | 10-12-2018 | 10-12-2018 | 11-12-2018 | 03:30 PM | Active | View |
55. | Purchase of Jaw Plates for Sayaji Make Jaw Crushers(WE-110 e-tender No.MOIL/18-19/ET-325, Dt.19.11.18) | 19-11-2018 | 11-12-2018 | 11-12-2018 | 12-12-2018 | 03:30 PM | Active | View |
56. | Purchase of Jaw Plates for Sayaji Make Jaw Crushers(WE-110 e-tender No.MOIL/18-19/ET-325, Dt.19.11.18) | 19-11-2018 | 11-12-2018 | 11-12-2018 | 12-12-2018 | 03:30 PM | Active | View |
57. | Extension of existing old metering room at Kandri Mine.(KAN/Civil/NIT/2018-19/2624 Dated 17.11.2018) | 19-11-2018 | 26-11-2018 | 26-11-2018 | 26-11-2018 | 04:30 PM | Active | View |
58. | Printing of Company Diary 2019(PUR-MOIL-C-12-26-WE-111-ET-323 dt.16/11/2018) | 17-11-2018 | 05-12-2018 | 05-12-2018 | 06-12-2018 | 03:30 PM | Active | View |
59. | Renovation of Vertical Shaft by replacement of Guide Rails, Buntons, Sollars, Laaders and Fencing at Chikla Mine( MOIL/18-19/ET/303) | 17-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | View |
60. | Providing, Supplying, Installation and Commissioning of heavy duty centrifugal pump with drive and operating valves at Chikla Mine(MOIL/18-19/ET/306) | 17-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | View |
61. | Purchase of Steel Cages for Munsar Mine - 3 Nos.(1 Lot) (Only Through e-procurement)( WE-112 DT.17/11/2018 (MOIL/18-19/ET/324)) | 17-11-2018 | 17-12-2018 | 17-12-2018 | 18-12-2018 | 03:30 PM | Active | View |
62. | Construction of Rest Shelter Near Screening Plant, near Siding Region at Munsar Mine(MOIL/18-19/ET/313) | 16-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | View |
63. | Construction of collection tank and circulation network for sewage treatment plant at Munsar Mine(MOIL/18-19/ET/312) | 16-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | View |
64. | Replacement of old damage steel doors and windows with new steel doors and windows for camp quarters at UKWA mine(MOIL/18-19/ET/308) | 16-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | View |
65. | Civil House Keeping Works to Industrial and Alliied Building inside Mine premises for upcoming Safety Week at Balaghat Mine(Civil/BGT/T.E./2018-19/4959) | 16-11-2018 | 23-11-2018 | 23-11-2018 | 23-11-2018 | 04:30 PM | Active | View |
66. | Construction of foundation and extended platform for Elevated feeding hopper of Mobile Crusher at Munsar Mine(MOIL/18-19/ET/311) | 16-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | View |
67. | Construction and installation of bio toilet for underground in Kandri Mine(KAN/CIVIL/NIT/2018-19/2544 Date 10.11.2018) | 16-11-2018 | 17-11-2018 | 17-11-2018 | 17-11-2018 | 04:30 PM | Active | View |
68. | COMPANY CALENDAR(PUR/MOIL/C-12/26/E-52/781-M dt. 16/11/2018) | 16-11-2018 | 30-11-2018 | 30-11-2018 | 30-11-2018 | 03:30 PM | Active | View |
69. | Construction of Durga Stage including other amenities at Football ground at Kandri Mine(MOIL/18-19/ET/310) | 16-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | View |
70. | Providing and fixing of paving blocks in rest house at Chikla Mine.(TE/CH/CIVIL/18-19/432 date 25/10/2018) | 15-11-2018 | 21-11-2018 | 21-11-2018 | 21-11-2018 | 03:30 PM | Active | View |
71. | Erection of HT overhead line from 5th level substation to south ventilation fan and Pro, sup, inst and comm of new HT line through aerial bunch cable from 33KV substation to production shaft substation and from production substation to 6th level sur(MOIL/ | 15-11-2018 | 14-12-2018 | 14-12-2018 | 14-12-2018 | 03:30 PM | Active | View |
72. | Drilling of 57 mm dia holes a premium support for installing cabel bolt in a Manginifferous rock in bolt in a Manginiferrous rock(Mining/BGT/T.E./18-19/4864 A) | 15-11-2018 | 22-11-2018 | 22-11-2018 | 22-11-2018 | 04:30 PM | Active | View |
73. | Painting to residential quarters at Balaghat and Ukwa Mine( MOIL/18-19/ET/314) | 15-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | View |
74. | HIRING OF 80MT CRANE FOR UNLOADING OF TATAHITACHI MAKE TATA1200V HYD EXCAVATOR AT MOIL LTD DONGRI BUZURG MINE.( DB/MECH/18-19/SDGM(MECH)/ 465) | 15-11-2018 | 20-11-2018 | 20-11-2018 | 20-11-2018 | 04:30 PM | Active | View |
75. | Modification of Structure Fabrication work to Transformer Building for Transformer replacement at Ferro Manganese plant Balaghat Mine(MOIL/18-19/ET/309) | 15-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | View |
76. | Setting up Cloud Based Disaster Recovery Site for MOILs SAP Data Centre(MOIL/18-19/ET/277) | 14-11-2018 | 14-12-2018 | 14-12-2018 | 14-12-2018 | 03:30 PM | Active | View |
77. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF VALVES FOR PIPE LINE(PUR/MOIL/C-11/148/E-50/705-M Dt. 14-11-2018) | 14-11-2018 | 05-12-2018 | 05-12-2018 | 05-12-2018 | 03:30 PM | Active | View |
78. | LED based Miners Safety Cap Lamp Assembly with Charging Rack and spares.(WE-100 DT.13.11.2018 (e-Tenderno.MOIL/18-19/ET/322) | 14-11-2018 | 05-12-2018 | 05-12-2018 | 06-12-2018 | 03:30 PM | Active | View |
79. | Providing telephone communication for 2nd vertical shaft, residential quarters and other mine areas at Munsar mine(MOIL/18-19/ET/304) | 13-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 03:30 PM | Active | View |
80. | Providing telephone communication for 2nd vertical shaft, residential quarters and other mine areas at Munsar mine(MOIL/18-19/ET/304) | 13-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 03:30 PM | Active | View |
81. | Comprehensive Annual Maintenance Contract for Road Weigh-Bridges(MOIL/18-19/ET/302) | 09-11-2018 | 07-12-2018 | 07-12-2018 | 07-12-2018 | 03:30 PM | Active | View |
82. | HDPE Pipes, Bends and Pipe Ends(MOIL/18-19/WE-106/ET/ 321 dt. 09.11.2018) | 09-11-2018 | 29-11-2018 | 29-11-2018 | 30-11-2018 | 03:30 PM | Active | View |
83. | Mannual Removal of Sludge From S.K. Tank at Balaghat Mine(Mining/BGT/T.E./18-19/4657) | 07-11-2018 | 16-11-2018 | 16-11-2018 | 16-11-2018 | 04:30 PM | Active | View |
84. | Cleaning of spillage Material under and around all the Equipment at Balaghat Mine(Mining/BGT/T.E./2018-19/4650A) | 07-11-2018 | 16-11-2018 | 16-11-2018 | 16-11-2018 | 04:30 PM | Active | View |
85. | Purchase of Remote Controlled, Light Weight, Electro-Hydraulic Drill Cum Loading Equipment with CAMC for Underground Mining Application at Balaghat Mine (M.P) - 1 No.(2 Lots) (Only Through e-procurement)(WE-93 DT.06/11/2018 (MOIL/18-19/ET/320)) | 06-11-2018 | 27-12-2018 | 27-12-2018 | 28-12-2018 | 03:30 PM | Active | View |
86. | Additional excavation in Mangeniferous rock between Ch.41 to Ch.45 at Gumgaon Mine(MOIL/18-19/ET/317) | 06-11-2018 | 05-12-2018 | 05-12-2018 | 05-12-2018 | 03:30 PM | Active | View |
87. | Picking and collection of 25 PERCENT Mn SM grade BGL 462 from sub grade mineral reject of Underground ROM at Balaghat Mine(MOIL/18-19/ET/298) | 06-11-2018 | 05-12-2018 | 05-12-2018 | 05-12-2018 | 03:30 PM | Active | View |
88. | Muffling for blasting at 6A 6B and 6C section of North Tirodi Mine(MOIL/18-19/ET/299) | 06-11-2018 | 05-12-2018 | 05-12-2018 | 05-12-2018 | 03:30 PM | Active | View |
89. | Operation of vibrating screen to screen sub grade mineral reject of underground ROM at Balaghat Mine(MOIL/18-19/ET/301) | 06-11-2018 | 05-12-2018 | 05-12-2018 | 05-12-2018 | 03:30 PM | Active | View |
90. | Screening shorting picking stacking of jigging Ferro manganese metal at ferro Plant (BGT/FMP/T.E./2018-19/244 ) | 05-11-2018 | 21-11-2018 | 21-11-2018 | 21-11-2018 | 4:30 pm | Active | View |
91. | Purchase of Backhoe Loader along with Rock Breaker for Sitapatore Mine (M.P) - 1 No. (2 Lots) (Only Through e-procurement)(WE-102 DT.05/11/2018 (MOIL/18-19/ET/319)) | 05-11-2018 | 10-12-2018 | 10-12-2018 | 11-12-2018 | 03:30 PM | Active | View |
92. | PURCHASE OF VIBRATING FEEDER COMPLETE WITH DRIVE - 1 NO.FOR BALAGHAT MINE (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/212/E-51/753-M DT.03/11/2018) | 03-11-2018 | 26-11-2018 | 26-11-2018 | 26-11-2018 | 03:30 PM | Active | View |
93. | Waterproofing to Cap Lamp room and Record room of Mine hospital at Munsar Mine(MUN/CIVIL/18-19/114 DT 02.11.2018) | 03-11-2018 | 30-11-2018 | 30-11-2018 | 30-11-2018 | 04:30 PM | Active | View |
94. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR PLUG ASSEMBLY AUDIO VISUAL ALARMS AND LIGHTING SPARES OF LHD AND SDL MACHINES-MAKE EIMCO ELECON(PUR/MOIL/C-5/27/E-41/600-M Dt. 02/11/2018) | 02-11-2018 | 14-11-2018 | 14-11-2018 | 14-11-2018 | 03:30 PM | Active | View |
95. | Design, Procurement, Supply, Fabrication, Erection, Installation and Commissioning of new CandS Plant of 40 TPH capacity and one additional bunker of 100MT capacity near 2nd Vertical Shaft at Chikla Mine(MOIL/18-19/ET/292) | 01-11-2018 | 01-12-2018 | 01-12-2018 | 01-12-2018 | 03:30 PM | Active | View |
96. | Providing and fixing of paving blocks in rest house at Chikla Mine.(TE/CH/CIVIL/18-19/432 date 25/10/2018) | 31-10-2018 | 10-11-2018 | 10-11-2018 | 10-11-2018 | 03:30 PM | Active | View |
97. | Purchase of Pump - Various Types - 10 Nos. for Balaghat Mine (6 Lots) (Only Through e-procurement)(WE-104 DT.31/10/2018 (MOIL/18-19/ET/300)) | 31-10-2018 | 03-12-2018 | 03-12-2018 | 04-12-2018 | 03:30 PM | Active | View |
98. | Consstruction of RCC Gantry Wall at Ch 10000 at Ukwa Mine(16/Civil/UM/18-19/1578) | 29-10-2018 | 12-11-2018 | 12-11-2018 | 12-11-2018 | 04:30 PM | Active | View |
99. | MAINTENANCE OF GARDEN OF MOIL TRAINING CENTRE AT MUNSAR MINE.(MUN/CIVIL/18-19/107 DT 27.10.2018) | 28-10-2018 | 12-11-2018 | 12-11-2018 | 12-11-2018 | 04:30 PM | Active | View |
100. | Extension and rising of RCC walls both sides of Mobile at Munsar(MUN/CIVIL/18-19/110 DT 27.10.2018) | 28-10-2018 | 03-11-2018 | 03-11-2018 | 03-11-2018 | 04:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |