Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Cleaning of accumulated silt from cross cut of different level at Balaghat Mine(MIN/BGT/19-2/LT/816 DATE 17.05.2019) | 21-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 04:30 PM | Active | View |
2. | Transportation of sand from Kanki ghat to Balaghat Mine(Min/BGT/19-2/LT/841 DATE 20.05.2019) | 21-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 04:30 PM | Active | View |
3. | Additional excavation in Manganiferous rock for concreting of crosscut, manway and orepass etc. in underground at Munsar Mine(MOIL/19-20/ET/94) | 21-05-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
4. | Picking and collection of material to recover Ferro grade MS-3516 ore from sub-grade mineral reject through jigging at Munsar Mine(MOIL/19-20/ET/93) | 21-05-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
5. | Recovery of Ferro grade TD-4505 and SM grade TDL-439 and TDL-499 from South Magazine Dump at Tirodi Mine(MOIL/19-20/ET/95) | 21-05-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
6. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRY DENSITY SEPERATION PLANT AT MUNSAR MINE(PUR/MOIL/C-5/23/E-16/117-M Dt. 21-05-2019) | 21-05-2019 | 12-06-2019 | 12-06-2019 | 12-06-2019 | 03:30 PM | Active | View |
7. | Lifting of transformer and accessories from transformer floor to the ground and transporting to storage site in FMP, Balaghat(FMP/ELECT/19-20/55) | 20-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 04:30 PM | Active | View |
8. | PURCHASE OF ATLAS COPCO MAKE BBD 94W ROCK DRILL - 10 NOS. AND ALF 72D PUSHER LEGS - 10 NOS. FOR BALAGHAT MINE(M.P)(AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/115/E-17/178-M DT.20/05/2019) | 20-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
9. | Hiring of services of Design Engineering Firm for proposed new water supply scheme at Chikla Mine(MOIL/19-20/ET/72) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
10. | Maintenance, watch and ward of garden at various places at Munsar Mine.(MOIL/19-20/ET/65) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
11. | 1 Providing and fixing concertina coil fencing at 160L n 250L 2 Providing and fixing concertina coil fencing from Siding to Chikla B and 3 Construction of boundary wall in precast, prestressed column and panels along peripherial area of 2nd Ve(MOIL/19-20/ | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
12. | Construction of GSR of 2.00 lakh liter capacity for second vertical shaft near Gadhaghat at Chikla Mine(MOIL/19-20/ET/70) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
13. | Cleaning of surplus contaminated ROM to recover Ferro grade and LGHS ore at Vertical Shaft at Chikla Mine(MOIL/19-20/ET/91) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
14. | Cleaning of surplus contaminated ROM at Chikla B section of Chikla Mine(MOIL/19-20/ET/90) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
15. | Construction of Cement concrete plateform beside existing CC plateform at Kandri Mine.(MOIL/19-20/ET/62) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
16. | Providing and laying pipe line from service reservoir of guest house upto second level sand stowing plant at Balaghat Mine(MOIL/19-20/ET/66) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
17. | Concreting of shaft cross-cut at -450 L using Precast Slabs at Kandri Mine(MOIL/19-20/ET/92) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
18. | Construction of DAV Public school at village Munsar Distt Nagpur, under CSR(MOIL/19-20/ET/100) | 20-05-2019 | 24-06-2019 | 24-06-2019 | 24-06-2019 | 03:30 PM | Active | View |
19. | Repairing of Bucket Assembly TATA Hitachi 450-1 Hyd Excavator operating at Dongri Buzurg Mine(DB/MECH/19-20/SDGM(MECH)/52) | 18-05-2019 | 06-06-2019 | 06-06-2019 | 06-06-2019 | 04:30 PM | Active | View |
20. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF STAINLESS STEEL BALL VALVES(PUR/MOIL/C-11/14/E-12/114-M Dt. 17-05-2019) | 17-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
21. | Removal of waste rock and Manganiferous rock from Pit No.5 and handling the same by mechanized means at Sitapatore Sukli Mine(MOIL/19-20/ET/86) | 17-05-2019 | 17-06-2019 | 17-06-2019 | 17-06-2019 | 03:30 PM | Active | View |
22. | Purchase of sand required for Underground concreting work at Ukwa Mine(MOIL/19-20/ET/87) | 17-05-2019 | 17-06-2019 | 17-06-2019 | 17-06-2019 | 03:30 PM | Active | View |
23. | Transportation of underground tubs at Ch.5000 section of Ukwa Mine(MOIL/19-20/ET/89) | 17-05-2019 | 17-06-2019 | 17-06-2019 | 17-06-2019 | 03:30 PM | Active | View |
24. | Pushing and unloading of ROM and rock tubs in underground at Munsar Mine(MOIL/19-20/ET/88) | 17-05-2019 | 19-06-2019 | 19-06-2019 | 19-06-2019 | 03:30 PM | Active | View |
25. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF NON RETURN VALVES, GATE VALVES AND BUTTERFLY VALVES.(PUR/MOIL/C-11/148/E-13/116-M Dt. 17-05-2019) | 17-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
26. | Purchase of Traction Battery Chargers for Various Mines - 10 Nos. (5 Lots) (Only Through e-procurement)(WE-19(ET/115) DT.17/05/2019) | 17-05-2019 | 13-06-2019 | 13-06-2019 | 14-06-2019 | 03:30 PM | Active | View |
27. | Fabrication of wooden and Iron Clamps for lowering of 120 Sqmm XLPE copper cable from Production shaft surface inset to 13.5L Underground at Balaghat Mine(BGT/TE/Elect/19-20/123) | 16-05-2019 | 04-06-2019 | 04-06-2019 | 04-06-2019 | 04:30 PM | Active | View |
28. | Purchase of Hand Held Electro-Hydraulic Drill Machine for Underground Mining Application at Various Mines - 6 Nos.(4 Lots) with Operation and Maintenance Spares (Only Through e-procurement)(WE-7(ET/113) DT.16/05/2019) | 16-05-2019 | 06-06-2019 | 06-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
29. | Transporting one no. TATA Hitachi make Excavator (Tata from Tirodi Mine to Dongri Buzurg Mine through Truck Trailer.( DB/MECH/19-20/SDGM(MECH)/ 51) | 16-05-2019 | 21-05-2019 | 21-05-2019 | 21-05-2019 | 04:30 PM | Active | View |
30. | Designing and printing of Annual Report 2018-19 Deluxe Version in English, Hindi and Marathi, Shareholder version and Abridged Version in English, Translation of text from English to Hindi and Marathi and handling charges(MOIL/19-20/ET/83) | 16-05-2019 | 06-06-2019 | 06-06-2019 | 06-06-2019 | 03:30 PM | Active | View |
31. | Purchase of Ventilation Fan Complete for various Mines - 3 Sets.(2 Lots) (Only Through e-procurement)(WE-9(ET/114) DT.16/05/2019) | 16-05-2019 | 06-06-2019 | 06-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
32. | Purchase of Dry Type Transformers for Various Mines - 6 Nos.(4 Lots) (Only Through e-procurement)(WE-8(ET/112) DT.15/05/2019) | 15-05-2019 | 06-06-2019 | 06-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
33. | PURCHASE OF TRIMBLE MAKE (S-6 MODEL) TOTAL STATION BATTERY.(PUR/MOIL/C-13/19/E-15/151-M DT.14.05.2019) | 15-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
34. | Purchase of High Speed Diesel (HSD)(PUR/MOIL/C-2/163/E-14/142-M DT.14/05/2019) | 14-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 03:30 PM | Active | View |
35. | Purchase of Motorised Rotary Tub Tippler for Gumgaon Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-16 (ET/110) DT.14/05/2019) | 14-05-2019 | 03-06-2019 | 03-06-2019 | 04-06-2019 | 03:30 PM | Active | View |
36. | Purchase of Double Deck Circular Motion Vibratory Screen for Munsar Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-17 (ET/111) DT.14/05/2019) | 14-05-2019 | 03-06-2019 | 03-06-2019 | 04-06-2019 | 03:30 PM | Active | View |
37. | LOADING UNLOADING AND FILLING SPREADING AT -70 LEVEL AND 60 LEVEL OF CHIKLA-B SECTION AT CHIKLA MINE(TE-32 Dt.13052019) | 13-05-2019 | 20-05-2019 | 20-05-2019 | 20-05-2019 | 04:30 PM | Active | View |
38. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR RCC WORK AT CH 1830 OF -470 LEVEL AND CH 1920 OF -370 LEVEL AT CHIKLA MINE(TE-31 Dt.13052019) | 13-05-2019 | 20-05-2019 | 20-05-2019 | 20-05-2019 | 04:30 PM | Active | View |
39. | Maintenance, Distribution and Collection of Caplamps for One Month( Elect/BGT/Caplamps/19-20/111) | 13-05-2019 | 24-05-2019 | 24-05-2019 | 24-05-2019 | 04:30 PM | Active | View |
40. | Facility Management Services for ERP Data Center(MOIL/19-20/ET/68) | 13-05-2019 | 12-06-2019 | 12-06-2019 | 12-06-2019 | 03:30 PM | Active | View |
41. | Hiring of Excavator for cleaning of fines pond Niagara plant at Ukwa Mine(16/Mining/UM/19-20/195) | 11-05-2019 | 25-05-2019 | 25-05-2019 | 25-05-2019 | 04:30 PM | Active | View |
42. | Recovery of cleaned ore from O/C ROM at Parsoda Mine(MOIL/19-20/ET/85) | 10-05-2019 | 24-05-2019 | 24-05-2019 | 24-05-2019 | 03:30 PM | Active | View |
43. | Picking and collection of Ferro grade and SM grade ore TDL-439 TDL-499 and TDL-469 from South Staff Quarter Dump at Tirodi Mine(MOIL/19-20/ET/64) | 10-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
44. | Recovery of Ferro grade TD-4505 and SM grade ore TDL-439 and TDL-499 from North Magazine Dump at Tirodi Mine( MOIL/19-20/ET/74) | 10-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
45. | Hiring of tippers for ore transportation from C and S Plant to siding at Chikla Mine(MOIL/19-20/ET/73) | 10-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
46. | Maintenance and operation of pumps for drinking water supply in camp area at Kandri Mine(MOIL/19-20/ET/49) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
47. | Construction of Residential quarters Tirodi Mine.(MOIL/19-20/ET/61) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
48. | Providing and installation of Bio toilets at Dongri Buzurg and Chikla Mine.(MOIL/19-20/ET/43) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
49. | Annual service maintenance contract for Winder System installed at Various Mine(MOIL/19-20/ET/67) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
50. | Annual repairs to camp quarters at Balaghat Mine.(MOIL/19-20/ET/47) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
51. | TRANSPORT OF EXPLOSIVE DETONATOR FROM PWD ROAD TO CHIKLA MINE MAGAZINE AT CHIKLA MINE(TE-30 Dt.09052019) | 09-05-2019 | 16-05-2019 | 16-05-2019 | 16-05-2019 | 04:30 PM | Active | View |
52. | Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/19-20/640) | 09-05-2019 | 28-05-2019 | 28-05-2019 | 28-05-2019 | 04:30 PM | Active | View |
53. | Major repairs/overhauling Ashok Leyland Engine AL 412TC2/1 of JCB-3 loader operating at Balaghat Mine(AGT/BGT/MECH/JCB/19-20/641) | 09-05-2019 | 28-05-2019 | 28-05-2019 | 28-05-2019 | 04:30 PM | Active | View |
54. | Purchase of SODIUM LAURYL SULPHATE - 5875 KG(WE-6 e-tender No.MOIL/19-20/ET-96, Dt.09.05.2019) | 09-05-2019 | 03-06-2019 | 03-06-2019 | 04-06-2019 | 03:30 PM | Active | View |
55. | Construction of sewage treatment plant at new colony (Chandmara) at Dongri Buzurg Mine .(MOIL/19-20/ET/44) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
56. | Providing furniture and interior works and civil works for laboratory on ground floor and Geology and Survey department at second floor of MOIL BHAWAN Nagpur(MOIL/19-20/ET/48) | 09-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
57. | Construction of Hostel building for Navin Desai Residential school Panchgaon Distt Nagpur under CSR(MOIL/19-20/ET/45) | 09-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
58. | Construction of Canteen building at Kandri Mine.(MOIL/19-20/ET/50) | 09-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
59. | Construction of shed over mobile crusher unit at Munsar Mine.(MOIL/19-20/ET/46) | 09-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
60. | Repairing of Track Rollers Assembly of Side Dump Loader-3 Nos. operating at Balaghat Mine(AGT/BGT/MECH/SDL/19-20/127) | 08-05-2019 | 17-05-2019 | 17-05-2019 | 17-05-2019 | 04:30 PM | Active | View |
61. | Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine(16/Civil/UM/19-20/127) | 08-05-2019 | 22-05-2019 | 22-05-2019 | 22-05-2019 | 04:30 PM | Active | View |
62. | Retiling and Reroofing of camp quarters at Kandri mine.(Kan/Civil/NIT/19-20/436 Dated 10.05.2019) | 08-05-2019 | 18-05-2019 | 18-05-2019 | 18-05-2019 | 04:30 PM | Active | View |
63. | Cleaning of storm water drain of surface and underground sump at Kandri mine.(Kan/Civil/NIT/19-20/436 Dated 10.05.2019) | 08-05-2019 | 18-05-2019 | 18-05-2019 | 18-05-2019 | 04:30 PM | Active | View |
64. | Disposal and door to door collection of liquid and dry Garbage at camp qr. Ukwa Mine(16/Civil/UM/19-20/128) | 08-05-2019 | 22-05-2019 | 22-05-2019 | 22-05-2019 | 04:30 PM | Active | View |
65. | Making of stone pitching wall and Hiring of JCB for road repair work near Ch 10000 and New workshop premises Ukwa Mine(16/Civil/UM/19-20/129) | 08-05-2019 | 22-05-2019 | 22-05-2019 | 22-05-2019 | 04:30 PM | Active | View |
66. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT WATER PUMP.(PUR/MOIL/C-5/28/E-10/105-M Dt. 08-05-2019) | 08-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 03:30 PM | Active | View |
67. | Making and Supply of stemming material mud plug used for blasting at Ukwa Mine(MOIL/19-20/ET/60) | 07-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
68. | Loading and unloading steel sections cement bags and other materials with stacking at Balaghat Mine Store(MOIL/19-20/ET/59) | 07-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
69. | Skywater Generating System capacity 100 Liters( PUR/MOILDB/18-19/12/36) | 07-05-2019 | 22-05-2019 | 22-05-2019 | 22-05-2019 | 04:30 PM | Active | View |
70. | Construction of 25000 lit GSR RCC water tank for New sand stowing plant near Ist vertical shaft at Ukwa Mine.(16/Civil/UM/19-20/130) | 07-05-2019 | 21-05-2019 | 21-05-2019 | 21-05-2019 | 04:30 PM | Active | View |
71. | Repairs to roof of Labor and staff quarter Ukwa ,Gudma and Prem Nagar camp at Ukwa Mine .(16/Civil/UM/19-20/126) | 07-05-2019 | 21-05-2019 | 21-05-2019 | 21-05-2019 | 04:30 PM | Active | View |
72. | Washing Picking and collection of material from rejected dump West side of D dump at Tirodi Mine(MOIL/19-20/ET/63) | 07-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
73. | Dustworx Water Additive for Mine Haul Road dust suppression.(PUR/MOIL/DB/2019/119/35) | 06-05-2019 | 15-05-2019 | 15-05-2019 | 15-05-2019 | 04:30 PM | Active | View |
74. | Prov. consultancy for producing aggregates manufactured sand from waste rock reject generated at DB Mine((GM(MECH)/TEN/AGGRE/19-20/294) | 06-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 04;00 PM | Active | View |
75. | Underground development for winze -350 L to -450 L at Kandri Mine(MOIL/19-20/ET/58) | 06-05-2019 | 06-06-2019 | 06-06-2019 | 06-06-2019 | 03:30 PM | Active | View |
76. | Underground development at 7th and 8th level North section and OTC from 8th to 10th Level at Balaghat Mine(MOIL/19-20/ET/56) | 06-05-2019 | 06-06-2019 | 06-06-2019 | 06-06-2019 | 03:30 PM | Active | View |
77. | Horizontal and Vertical Development at -70 Level of Chikla Vertical Section at Chikla Mine(MOIL/19-20/ET/57) | 06-05-2019 | 06-06-2019 | 06-06-2019 | 06-06-2019 | 03:30 PM | Active | View |
78. | Hiring of Equipment for removal of soil without drilling and Blasting at Parsoda Mine.(ASDGM(M)/Min/Par/LT/19-20/07 Date 23.04.19) | 04-05-2019 | 06-05-2019 | 06-05-2019 | 06-05-2019 | 04:30 PM | Active | View |
79. | ANNUAL MAINTANCE CONTRACT FOR REPAIRS AND REWIRING OF RESIDENTIAL QUARTERS AND OFFICE BUILDINGS TRD(TRD/ELECT/19-20/7400002346/283) | 04-05-2019 | 11-05-2019 | 11-05-2019 | 11-05-2019 | 03:30 PM | Active | View |
80. | Drilling of 01 Bore along with starter panel and pump for Drinking water at Kandri Mine(KAN/CIvil/NIT/19-20/362 Date 01.05.2019) | 04-05-2019 | 10-05-2019 | 10-05-2019 | 10-05-2019 | 04:30 PM | Active | View |
81. | WEBSITE SINGLE TENDER ENQUIRY FOR PURCHASE OF CAR SKODA OCTAVIA STYLE 1.8TSI (AUTOMATIC TRANSMISSION) PETROL - 1 NO. (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/161/E-11/110-M DT.03.05.2019) | 03-05-2019 | 20-05-2019 | 20-05-2019 | 20-05-2019 | 03:30 PM | Active | View |
82. | Purchase of Dust Extraction System Complete with All Accessories with Ducting Work for Above Dust Extraction System - 1 Set (2 Lots.) for Munsar Mine(M.S) (Only Through e-procurement)(WE-2 DT.03/05/2019(ET/82)) | 03-05-2019 | 23-05-2019 | 23-05-2019 | 24-05-2019 | 03:30 PM | Active | View |
83. | Washing Picking and collection of material from South A waste dump at Tirodi Mine(MOIL/19-20/ET/53) | 03-05-2019 | 03-06-2019 | 03-06-2019 | 03-06-2019 | 03:30 PM | Active | View |
84. | Cleaning of excess ROM at Beldongri Mine(MOIL/19-20/ET/54) | 03-05-2019 | 03-06-2019 | 03-06-2019 | 03-06-2019 | 03:30 PM | Active | View |
85. | Picking and collection of 20 percent SM grade ore CHL-535 from cleaning of subgrade mineral reject from ROM at Magazine dump East side section of Chikla Mine(MOIL/19-20/ET/55) | 03-05-2019 | 03-06-2019 | 03-06-2019 | 03-06-2019 | 03:30 PM | Active | View |
86. | Picking collection and cleaning of 20 parcent Mn. ore from sub-grade mineral reject from underground ROM at Beldongri Mine(MOIL/19-20/ET/71) | 03-05-2019 | 03-06-2019 | 03-06-2019 | 03-06-2019 | 03:30 PM | Active | View |
87. | Major repairs/overhauling Ashok Leyland Engine H6ETIC3R23 of LT loader operating at Balaghat Mine from authorize service dealer of M/s. Ashok Leyland Ltd( AGT/BGT/MECH/LT/19-20/529) | 02-05-2019 | 06-05-2019 | 06-05-2019 | 06-05-2019 | 04:30 PM | Active | View |
88. | PURCHASE OF TRACTION BATTERIES(WE-135 DT.01.05.2019 (e-Tenderno. MOIL/19-20/ET/80) | 02-05-2019 | 06-06-2019 | 06-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
89. | ADDITIONAL PILLAR OF RCC AT CHIKLA B SECTION OF CHIKLA MINE(TE-29 Dt.02.05.2019) | 02-05-2019 | 09-05-2019 | 09-05-2019 | 09-05-2019 | 04:30 PM | Active | View |
90. | Making Stair case for outside approch to hospital building first floor to be converted into vocational training centre at Balalghat Mine(BGT/CIVIL/19-20/LT/15 DT. 01.05.2019) | 02-05-2019 | 10-05-2019 | 10-05-2019 | 10-05-2019 | 04:30 PM | Active | View |
91. | Collection of garbage and cleaning of drain at Balaghat Mine(BGT/CIVIL/19-20/LT/16 DATE 01.05.2019) | 02-05-2019 | 10-05-2019 | 10-05-2019 | 10-05-2019 | 04:30 PM | Active | View |
92. | Making and Supplying of stemming sticks material (Mud plug) used for blasting/fragmentation in underground at various levels at Balaghat mine( Min/BGT/19-20/LT/ 543 Date 02.05.2019) | 02-05-2019 | 10-05-2019 | 10-05-2019 | 10-05-2019 | 04:30 PM | Active | View |
93. | Repairing of boundary wall at Mine Manager Bunglow at Balaghat Mine(BGT/CIVIL/19-20/LT/17 DATE 01.05.2019) | 02-05-2019 | 10-05-2019 | 10-05-2019 | 10-05-2019 | 04:30 PM | Active | View |
94. | PURCHASE OF WELDING CABLE(WE-145 DT.01.05.2019 (e-Tender no.MOIL/19-20/ET/81) | 02-05-2019 | 30-05-2019 | 30-05-2019 | 31-05-2019 | 03:30 PM | Active | View |
95. | Construction of Rest Shelter at Parsoda Mine.(Civil/Parsoda/TE/19-20/12 Date 30.04.2019) | 01-05-2019 | 07-05-2019 | 07-05-2019 | 07-05-2019 | 04:30 PM | Active | View |
96. | Construction of Sedimentation Tank to comply as per MPCB Norms at Parsoda Mine.(Civil/Parsoda/TE/19-20/11 Date 30.04.2019) | 01-05-2019 | 07-05-2019 | 07-05-2019 | 07-05-2019 | 04:30 PM | Active | View |
97. | PURCHASE OF AMMONIUM NITRATE PRILLED(WE-152 DT.01.05.2019 (e-Tender No.MOIL/19-20/ET/79) | 01-05-2019 | 23-05-2019 | 23-05-2019 | 24-05-2019 | 03:30 PM | Active | View |
98. | Design and Detailed engineering, supply, erection, commissioning and testing of rotary kiln including all accessories for Manganese Ore reduction at EMD Plant, Dongri Buzurg Mine(MOIL/19-20/ET/51) | 30-04-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 03:30 PM | Active | View |
99. | Purchase of PPG CORRUGATED ROOF SHEET(WE-3 e-tender No.MOIL/19-20/ET-78, Dt.30.04.2019) | 30-04-2019 | 17-06-2019 | 17-06-2019 | 18-06-2019 | 03:30 PM | Active | View |
100. | Construction of Water tank and Laying RCC Hume Pipe Drain near Crushing Plant area at Chikla mine(TE Civil 424) | 29-04-2019 | 08-05-2019 | 08-05-2019 | 08-05-2019 | 03:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |