Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. PURCHASE OF PEOPLELINK EXTENSION MICROPHONE(PUR/MOIL/C-4/138/E-13/176-M DT.28.07.2020) 28-07-2020 14-08-2020 14-08-2020 14-08-2020 03:30 PM Active View
2. Tender For 10 Mbps Wired Wireless Internet Broadband Line 1 1 at Ukwa Mine(BG/SYSTEM/Network/2020-21/433) 23-07-2020 07-08-2020 07-08-2020 07-08-2020 03:30 PM Active View
3. Maintenance, Distribution and Collection of Cap Lamps at Kandri Mine through outsourcing for the period of one year(MOIL/20-21/ET/74) 23-07-2020 24-08-2020 24-08-2020 24-08-2020 03:30 PM Active View
4. WEBSITE SNGLE TENDER ENQUIRY IN TWO BID SYSTEM TO ENTER INTO BLANKET RATE CONTRACT FOR TWO YEARS-2020-22- FOR PURCHASE OF HOLMAN-ROCKWELL MAKE SPARES FOR ROCK DRILL AN AIR LEG MACHINES- HOLMAN AND ROCKEWELL ONLY.(PUR/MOIL/C-5/16/E-08/169-M Dt. 23/07/2020) 23-07-2020 05-08-2020 05-08-2020 05-08-2020 03:30 PM Active View
5. Purchase of Strata Monitoring Instrument MPBX for Chikla Mine(TE-04 DT.21072020) 21-07-2020 11-08-2020 11-08-2020 11-08-2020 04:30 PM Active View
6. PURCHASE OF SPARES FOR SIGNALLING SYSTEM OF 150HP WINDER FOR KANDRI MINE(PUR/KD/ELECT/20-21/) 21-07-2020 28-07-2020 28-07-2020 28-07-2020 04:30 PM Active View
7. OUTSOURCING OF GENERAL MAINTENANCE AND REGULAR CHECKUP OF DUMPERS AND TIPPERS ONLY REGISTERED CONTRACTORS WHO DOING THIS TYPE OF SIMILAR WORK SINCE ATLEAST FROM LAST YEAR(MOIL/HO/MECH/2020/56 DT 23.05.2020) 20-07-2020 25-07-2020 25-07-2020 25-07-2020 03:30 PM Active View
8. Designing and printing of Annual Report 2019-20 (Deluxe Version in English, Hindi and Marathi)(MOIL/20-21/ET/99) 20-07-2020 10-08-2020 10-08-2020 10-08-2020 03:30 PM Active View
9. OUTSOURCING OF GENERAL MAINTENANCE AND REGULAR CHECKUP OF DOZER AND EXCAVATOR(MOIL/HO/MECH/2020/57 DT. 23.05.2020) 19-07-2020 25-07-2020 25-07-2020 25-07-2020 03:30 PM Active View
10. Scanning and Digitization of Company Records(MOIL/20-21/ET/102) 18-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
11. Development of Vendor Invoice Tracking System(MOIL/20-21/ET/100) 18-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
12. Maintenance and operation of water supply scheme at Dongri Buzurg Mine(MOIL/20-21/ET/89) 17-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
13. Construction of RCC sump and laying of pipe line for supply of water to new A type quarters and Medical Administrative building at MOIL Nagpur(MOIL/20-21/ET/103) 17-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
14. Ultrasonic and Magnetic Particle NDT Testing of CSG Components of all winders at Balaghat mine(AGENT/BGT/MECH/NDT/20-21/395) 16-07-2020 05-08-2020 05-08-2020 05-08-2020 04:30 PM Active View
15. Maintenance repair of HT/LT overhead lines for the three months at Balaghat Mine(BGT/ELECT/20-21/376) 14-07-2020 31-07-2020 31-07-2020 31-07-2020 04:30 PM Active View
16. Repairing of Bucket assembly 5.6 Cu M -- 4 Nos of TATAHitachi 1200-3 Hydraulic Excavator of DB Mine.(DB/MECH/20-21/JGM(MECH)/321) 14-07-2020 21-07-2020 21-07-2020 21-07-2020 04:30 PM Active View
17. Replacement of 6mm thick liner plates at 14.5th Level loading station of Production shaft at Balaghat Mine(AGT/BGT/MECH/WINDER/20-21/374) 13-07-2020 04-08-2020 04-08-2020 04-08-2020 04:30 PM Active View
18. Replacement of liner plates of the transfer chute, bunker and repair of transfer chute/bunker at various location at IMB plant of Balaghat Mine(AGENT/BGT/MECH/IMBP/20-21/ 371) 11-07-2020 28-07-2020 28-07-2020 28-07-2020 04:30 PM Active View
19. Construction of Drain around Service Winze beside I st Vertical Shaft at Munsar Mine(MUN/CIVIL/NIT/20-21/51 DT 08.07.2020) 10-07-2020 15-07-2020 15-07-2020 15-07-2020 04:30 PM Active View
20. Purchase of Steel Cages - 5 Nos.(2 LOTS.) (Only Through e-procurement)(WE-25(ET-88) DT.10/07/2020) 10-07-2020 03-08-2020 03-08-2020 04-08-2020 03:30 PM Active View
21. Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Tirodi and Sitapatore Mine(BGT/SYSTEM/AMC/2020-21/354) 07-07-2020 17-07-2020 17-07-2020 17-07-2020 03:30 PM Active View
22. Purchase of PEARL COKE with Transportation - 6900 MT(MOIL/20-21/ET-87 dt.06.07.2020) 06-07-2020 05-08-2020 05-08-2020 06-08-2020 03:30 PM Active View
23. Repairing kachha road at North and South Section mine road at Tirodi Mine.(TRD/CIVIL/2020-21/528 Dated 21.06.2020) 04-07-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
24. Retaining wall for installation of pump shed and foundation for 170HP pump150HP pump north C section at Tirodi Mine.(TRD/CIVIL/2020-21/481 Dated 19.06.2020) 04-07-2020 09-07-2020 09-07-2020 10-07-2020 03:30 PM Active View
25. New installation of pump foundation and retaining wall for 170HP, 150HP north section at Tirodi Mine.(TRD/CIVIL/2020-21/467 Dated 11.06.2020) 04-07-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
26. Cleaning of septic tank with vacuum cleaning machine at camp/colony area at Tirodi Mine.(TRD/CIVIL/2020-21/527 Dated 21.06.2020) 04-07-2020 08-07-2020 08-07-2020 09-07-2020 03:30 PM Active View
27. Expression of Interest (EoI) for Setting up X- Ray based sorting system(PUR-MOIL-X RAY OCS/ET-85) 01-07-2020 29-09-2020 29-09-2020 29-09-2020 03:30 PM Active View
28. Purchase of Flexible Trailing Copper Conductor Cable(WE-21 DT.01.07.2020 (e-Tender no.MOIL/20-21/ET/86)) 01-07-2020 29-07-2020 29-07-2020 30-07-2020 03:30 PM Active View
29. BLANKET RATE CONTRACT FOR TWO YEARS FOR SUPPLY OF SIEMENS MAKE SWITCHGEARS PRODUCTS(PUR/MOIL/C-3/13/E-06/80-M DT.29.06.2020) 01-07-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
30. Loading transportation and unloading of manganese ore ROM at Beldongri Mine(Bel/Min/20-21/600 Dated 28.06.2020) 30-06-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
31. Tnder inviting in single bid system for Construction of switch and NGR panel room and 11KV cable teach at Chikla mine.(TE/CH/CIVIL/20-21/309) 30-06-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
32. Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Balaghat Mine(BGT/SYSTEM/AMC/2020-21/315) 29-06-2020 10-07-2020 10-07-2020 10-07-2020 03:30 PM Active View
33. Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Ukwa Mine(BGT/SYSTEM/AMC/2020-21/317) 29-06-2020 10-07-2020 10-07-2020 10-07-2020 03:30 PM Active View
34. Cleaning of Underground Sumps and Underground Level Drains under Monsoon Preparatory Works at Munsar Mine(ADGM/Mining/LT/2020-21/46 Date 26.06.2020) 27-06-2020 06-07-2020 06-07-2020 06-07-2020 04:30 PM Active View
35. Tender inviting in single bid system for Providing Water by Tanker in Residential Colonies at Chikla mine.(TE-CIVIL20-21-280) 27-06-2020 11-07-2020 11-07-2020 11-07-2020 04:00 PM Active View
36. Cleaning of surface drains and making of earthen bunds for North and south section for Monsoon preparatory works at Tirodi Mine.(TRD/CIVIL/2020-21/524 Dated 20/06/2020) 26-06-2020 30-06-2020 30-06-2020 01-07-2020 03:30 PM Active View
37. Repairing of Track Components of Side Dump Loader no.9 in 12th Level Underground of Balaghat Mine(AGT/BGT/MECH/SDL/20-21/291) 26-06-2020 15-07-2020 15-07-2020 15-07-2020 04:30 PM Active View
38. Tender for Laying of 6 inch and 4 inch GI pipe line for compressed air in underground at balaghat mine(AGT/BGT/MECH/PIPE/20-21/290) 26-06-2020 15-07-2020 15-07-2020 15-07-2020 04:30 PM Active View
39. Fabrication of Miscellaneous Items for Balaghat Mine(BGT/MECH/MISC ITEM/20-21/289) 25-06-2020 06-07-2020 06-07-2020 06-07-2020 04:30 PM Active View
40. Purchase of Pneumatic Stopper with Telescopic Air Leg for various Mines - 2 Lots.(Only Through e-procurement)(WE-14(ET-84) DT.25/06/2020) 25-06-2020 15-07-2020 15-07-2020 16-07-2020 03:30 PM Active View
41. Removal of waste rock from the dump at 265 MRL near Jawahar Shaft at Chikla Mine.(TE/CHIKLA/MECH/2020-21/94) 24-06-2020 30-06-2020 30-06-2020 30-06-2020 03:30 PM Active View
42. Operation Maintenance, watch and ward of Solid Waste Management Plant at Munsar Mine(MUN/CIVIL/AGT/NIT/20-21/44 DT.24.06.2020) 24-06-2020 30-06-2020 30-06-2020 30-06-2020 04:30 PM Active View
43. Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas Cylinders(MOIL/20-21/ET-83 dt.24.06.2020) 24-06-2020 16-07-2020 16-07-2020 17-07-2020 03:30 PM Active View
44. Purchase of Cable Bolting Machines for Various Mines - 6 Nos.(1 Lot) (Only Through e-procurement)(WE-18(ET-81) DT.24/06/2020) 24-06-2020 20-07-2020 20-07-2020 21-07-2020 03:30 PM Active View
45. Purchase of Pneumatic Rock Drill Machines and Pusher Leg for various Mines (4 Lots.) (Only Through e-procurement)(WE-19(ET-82) DT.24/06/2020) 24-06-2020 16-07-2020 16-07-2020 17-07-2020 03:30 PM Active View
46. Annual Underground Sand cleaning work at Balaghat Mine(MOIL/20-21/ET/70) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
47. Hiring of machinery for loading, unloading and transportation of Hutch from Hutch settling pond and hutch drain at Ukwa Mine(MOIL/20-21/ET/69) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
48. Loading and unloading of steel section and various material with stacking at NOS Kandri Mine(MOIL/20-21/ET/71) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
49. Handling of Manganese Ore in to Trucks for dispatch by Manual and Mechanized means at Ukwa Mine(MOIL/20-21/ET/68) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
50. PURCHASE OF HT PANELS VARIOUS TYPES - 7 LOTS (only through e-procurement)(WE-22(ET-78) DT.18/06/2020) 18-06-2020 13-07-2020 13-07-2020 14-07-2020 03:30 PM Active View
51. e Procurement of HDPE Pipes, Bends and Pipe Ends(PUR/MOIL/C-1/199/WE-05/ET/80) 18-06-2020 14-07-2020 14-07-2020 15-07-2020 03:30 PM Active View
52. Providing Installation and testing of Piston type Accumulator with fittings in 150 HP winder(A-III/KAN/20-21/382) 17-06-2020 30-06-2020 30-06-2020 01-07-2020 04:30 PM Active View
53. Purchase of Smart Parking System at MOIL BHAWAN, Nagpur(M.S) - 1 Set.(1 Lot) (Only Through e-procurement)(WE-23(ET-77) DT.17/06/2020) 17-06-2020 07-07-2020 07-07-2020 08-07-2020 03:30 PM Active View
54. Picking and collection of SM Grade SPL 463 and SPL 481 from various dumps of Sitapatore Mine(MOIL/20-21/ET/67) 16-06-2020 16-07-2020 16-07-2020 16-07-2020 03:30 PM Active View
55. Production of 25 percent Mn. SM Grade ore BGL-523 from U/G old sub grade mineral reject material at Balaghat Mine(MOIL/20-21/ET/66) 16-06-2020 22-07-2020 22-07-2020 22-07-2020 03:30 PM Active View
56. Picking and collection of manganiferous rock from surface bed reject area at Parsoda Mine(MOIL/20-21/ET/65) 16-06-2020 16-07-2020 16-07-2020 16-07-2020 03:30 PM Active View
57. Repairing of Bucket Assy 5.6 cum 4 nos of TATAHitachi 1200 NO.3 Hyd Excavator operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/236) 15-06-2020 23-06-2020 23-06-2020 23-06-2020 04:30 PM Active View
58. Procurement of 1 no. Elecrically Operated Mono- block pump for IMB Plant at Dongri Buzurg mine(PUR/DB/20-21/ 277) 15-06-2020 10-07-2020 10-07-2020 10-07-2020 04:30 PM Active View
59. Terrace water proofing to RCC slab of old B type quarters 05 blocks at Chikla Mine(MOIL/20-21/ET/47) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
60. Maintenance and Operation of Sewage Treatment Plant at Munsar Mine.(MOIL/20-21/ET/50) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
61. Providing and fixing heat guard (Cool roof) for work shop building of Munsar Mine.(MOIL/20-21/ET/51) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
62. Construction of Security watch tower (2 nos) for surveillance and strengtheing of internal security at Kandri Mine(MOIL/20-21/ET/52) 15-06-2020 31-07-2020 31-07-2020 31-07-2020 03:30 PM Active View
63. Operation of pumps for drinking water supply at Wahitola, Kaichi and Chargaon camp at Munsar Mine(MOIL/20-21/ET/48) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
64. Concreting of x-cut between Ch.34 to Ch.42 at -300 Level for stope preparation at Gumgaon Mine(MOIL/20-21/ET/63) 15-06-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
65. Additional excavation in manganiferous rock between Ch.37 to Ch.42 at -300 Level at Gumgaon Mine(MOIL/20-21/ET/64) 15-06-2020 30-06-2020 30-06-2020 30-06-2020 03:30 PM Active View
66. Underground development at 9th Level and 8th Level North at Balaghat Mine(MOIL/20-21/ET/61) 15-06-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
67. Additional excavation in Mangeniferous rock at 1750 Level and 1650 Level at Ukwa Mine(MOIL/20-21/ET/62) 15-06-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
68. Maintenance and Operation of Solid waste Management plant at Munsar Mine.(MOIL/20-21/ET/49) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
69. Construction of New Administrative building including compound wall and vehical parking shed at Kandri Mine(MOIL/20-21/ET/53) 15-06-2020 31-07-2020 31-07-2020 31-07-2020 03:30 PM Active View
70. Repairing of RCC roof of Laboure and staff quarters of Gudma Camp colony ,prem Nagar(AGT/Civil/UK/LT/20-21/224) 13-06-2020 20-06-2020 20-06-2020 20-06-2020 04:30 PM Active View
71. TRANSPORTATION OF 538 MT OF BOTTOM FLY ASH FROM ADANI POWER PLANT, TIRORA TO CHIKLA MINE FOR UNDERGROUND BACKFILLING WORKS.(TE-04 Dt.13062020) 13-06-2020 25-06-2020 25-06-2020 25-06-2020 04:00 PM Active View
72. Dewatering of Satak open pit during rainy season(Bel/Mech/NIT/2020/445 Dated 10.06.2020) 12-06-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
73. Operation of pump at Beldongri Mine during Monsoon(Bel/Mech/NIT/2020/444 Dated 10.06.2020) 12-06-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
74. TWO BID SYSTEM FOR PURCHASE OF Failsafe Electro Hydraulic Thruster Brake suitable for 250HP motor FOR KANDRI MINE.(PUR/MOIL/GR.III/KD/2020-21/335) 12-06-2020 30-06-2020 30-06-2020 30-06-2020 04:30 PM Active View
75. Extension of existing coal shed at EMD plant premises at Dongri Buzurg mine(DB/Civil/20-21/220 Date 01/06/2020) 11-06-2020 20-06-2020 20-06-2020 20-06-2020 04:30 PM Active View
76. Deployment of 02 Nos Sweepers for Miscellaneous cleaning works at Ukwa Mine(AGT/CIVIL/UK/LT/20-21/187) 11-06-2020 20-06-2020 20-06-2020 22-06-2020 04:30 PM Active View
77. Providing and fixing aluminium sliding windows at Mine Office at Dongri Buzurg Mine.(DB/Civil/20-21/381 Date 29/05/2020) 11-06-2020 19-06-2020 19-06-2020 19-06-2020 04:30 PM Active View
78. Replacement of old damaged steel doors with new steel doors at Dongri Buzurg Mine(DB/Civil/20-21/219 Date 01/06/2020) 11-06-2020 23-06-2020 23-06-2020 23-06-2020 04:30 PM Active View
79. ELECTRIC WINCH FOR PULLING OF TUB FROM ORE DISCHARGE CHUTE UPTO CAGES AT -330L UNDERGROUND AT MUNSAR MINE(ADGM (Mines)/Grp-III/2020-21/344) 09-06-2020 24-06-2020 24-06-2020 24-06-2020 03:30 PM Active View
80. Proposal for outsourcing manpower for daily electrical maintenance work at Tirodi Mine.(TRD/EL./20-21/7400004572/373 Dated 05.06.2020) 08-06-2020 30-06-2020 30-06-2020 30-06-2020 03:30 PM Active View
81. Engine Overhauling of L and T Loader 9020 Sr No AD0055 operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/235) 08-06-2020 16-06-2020 16-06-2020 16-06-2020 04:30 PM Active View
82. TENDER DOCUMENTS FOR PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR 1000KVA AND 500KVA, 11KV/433V TRANSFORMERS OF MUNSAR MINE(ELECT/MUN/ADGM/20-21/334) 08-06-2020 17-06-2020 17-06-2020 17-06-2020 03:30 PM Active View
83. DRILLING OF BORE HOLE 110 MM DIAMETER FROM 8TH TO 11 LEVEL FOR LAYING OF ELECTRICAL POWER CABLE AT PRODUCTION SHAFT IN UNDERGROUND AT BALAGHAT MINE(AGENT/MECH/B-HOLE/20-21/199) 06-06-2020 17-06-2020 17-06-2020 17-06-2020 04:30 PM Active View
84. Grass thatching of Bunglow No. 01 (Mine Manager Bunglow) at Tirodi Mine.(TRD/CIVIL/20-21/361) 06-06-2020 10-06-2020 10-06-2020 11-06-2020 05:30 PM Active View
85. Proposal for errection of new L.T. Line at Sitapatore Mine.(TRD/EL./20-21/7400004314/374 Dated 05.06.20) 06-06-2020 27-06-2020 27-06-2020 27-06-2020 03:30 PM Active View
86. Purchase of FRP TRANSLUCENT ROOF SHEET-400 Nos(MOIL/20-21/ET-60 dt.05.06.2020) 05-06-2020 29-06-2020 29-06-2020 30-06-2020 03:30 PM Active View
87. Construction of foundation for Chimney for 1500 KVA DG Set at Second vertical Shaft at Chikla mine.(CH/Civil/2020-21/316 date 01.06.2020) 04-06-2020 13-06-2020 13-06-2020 13-06-2020 03:30 PM Active View
88. PURCHASE OF VIBRATING FEEDER COMPLETE WITH DRIVE, MAKE-ENESTEE ENGINEERING LTD., MODEL-E-VF-1016-001- 1 NO. FOR BALAGHAT MINE (M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/239/E-3/35-M DT.03/06/2020) 04-06-2020 24-06-2020 24-06-2020 24-06-2020 03:30 PM Active View
89. PURCHASE OF WHEEL AND EXCEL ASSEMBLY WITH GEARBOX COMPLETE WITHOUT MOTOR - 1 SET, MAKE- M/S OVIS EQUIPMENT PVT.LTD., HYDERABAD, MODEL- 4 TON BATTERY OPERATED LOCOMOTIVE (SR.NO.603 AND 582) OPERATING AT BALAGHAT MINE(M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/4/E-4/36-M DT.03/06/2020) 04-06-2020 24-06-2020 24-06-2020 24-06-2020 03:30 PM Active View
90. DRILLING OF BORE HOLE 110 MM DIAMETER FROM 8TH TO 11 LEVEL FOR LAYING OF ELECTRICAL POWER CABLE AT PRODUCTION SHAFT IN UNDERGROUND AT BALAGHAT MINE(AGENT/BGT/B-HOLE/20-21/188) 04-06-2020 15-06-2020 15-06-2020 15-06-2020 04:30 PM Active View
91. Providing and installation of Effluent Treatment Plant in work shop area at Chikla Mine.(CH/Civil/2020-21/211 date 16.05.2020) 03-06-2020 10-06-2020 10-06-2020 10-06-2020 03:30 PM Active View
92. purchase of Pneumatically Operated Double Diaphragm Pumps for Various Mines - 10 Nos. (2 Lots)(WE-13(ET-57) DT.01/06/2020) 02-06-2020 24-06-2020 24-06-2020 25-06-2020 03:30 PM Active View
93. Obtaining Final Forest Clearance from Ministry of Environment, Forest and Climate Change over an area of 150.586 Ha., 3.986 Ha. and 4.734 Ha. within Mining lease of Tirodi, Ukwa and Sitapatore respectively(MOIL/20-21/ET/27) 02-06-2020 01-07-2020 01-07-2020 01-07-2020 03:30 PM Active View
94. Supply of Medicines 235 items(PUR/MOIL/C-10/35/WE-06/ET/59) 02-06-2020 09-07-2020 09-07-2020 10-07-2020 03:30 PM Active View
95. PURCHASE OF MOTOROLA MAKE MOTOTRBO SLR 5300 REPEATER ALONG WITH ACCESSORIES FOR DONGRI BUZURG MINE(DB/ELECT/20-21/211) 01-06-2020 26-06-2020 26-06-2020 26-06-2020 04:30 PM Active View
96. TENDER DOCUMENTS FOR SUPPLYING OF DGMS APPROVED FLP GATE END BOX FOR LHD, WITH ALL ACCESSORIES MUNSAR MINE 1 NO(ELECT/MUN/ADGM/20-21/269) 01-06-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
97. Purchase of SULPHURIC ACID with Transportation-400 MT(MOIL/20-21/ET-58 dt.01.06.2020) 01-06-2020 22-06-2020 22-06-2020 23-06-2020 03:30 PM Active View
98. Purchase of Cement Injection Pump Sets for Various Mines - 15 Nos.(2 Lots) (Only Through e-procurement)(WE-12(ET-56) DT.01/06/2020) 01-06-2020 29-06-2020 29-06-2020 30-06-2020 03:30 PM Active View
99. Requirement of manpower for collection of canteen food items and serving it to mine employees at Chikla Mine(MOIL/20-21/ET/29) 30-05-2020 29-06-2020 29-06-2020 29-06-2020 03:30 PM Active View
100. Purchase of Handheld XRF Machine for Head office, Nagpur(M.S) 2 Nos. (1 Lot) (Only Through e-procurement)(WE-7(ET-55) DT.30/05/2020) 30-05-2020 22-06-2020 22-06-2020 23-06-2020 03:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (205) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.