Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Purchase of Gravel Black Gitti for underground concreting work at Ukwa Mine(MOIL/19-20/ET/415) 03-03-2020 03-04-2020 03-04-2020 03-04-2020 03:30 PM Active View
2. Picking and collection of UKL-448 25 percent from F W Old sub grade mineralised area from Ch. 8600 to Ch.12000 at Ukwa Mine( MOIL/19-20/ET/414) 03-03-2020 03-04-2020 03-04-2020 03-04-2020 03:30 PM Active View
3. Underground development at -370 Level of Vertical Section at Chikla Mine( MOIL/19-20/ET/412) 03-03-2020 03-04-2020 03-04-2020 03-04-2020 03:30 PM Active View
4. Underground development for winze -150 Level to -250 Level at Kandri Mine(MOIL/19-20/ET/413) 03-03-2020 03-04-2020 03-04-2020 03-04-2020 03:30 PM Active View
5. Comprehensive Annual Maintenance Contract (CAMC) of computer hardware and peripherals( ADGM/Grp3/Sys/AMC/2019-20/1282) 02-03-2020 06-03-2020 06-03-2020 06-03-2020 04:00 PM Active View
6. Fabrication of rollers for conveyor belts operation in IMB plant at Balaghat Mine(AGT/BGT/MECH/IMB/19-20/1214 dated 23/02/2020) 02-03-2020 12-03-2020 12-03-2020 12-03-2020 04:30 PM Active View
7. PURCHASE OF BricksCAD V20 Classic (2D/3D) SOFTWARE(PUR/MOIL/C-4/138/E-66/1022-M Dt.29/02/2020) 02-03-2020 23-03-2020 23-03-2020 23-03-2020 03:30 PM Active View
8. Dismentiling of Old Administrative Buliding at Ukwa Mine(Civil/UK/LT/19-20/2485) 29-02-2020 09-03-2020 09-03-2020 09-03-2020 04:30 PM Active View
9. Cleaning of surplus contaminated ROM to recover Ferro grade and LGHS ore at vertical shaft at Chikla mine(MOIL/19-20/ET/411) 29-02-2020 30-03-2020 30-03-2020 30-03-2020 03:30 PM Active View
10. Purchase of Stainless Steel AISI 316 Material -11 Items(MOIL/19-20/ET-428 dt.29.02.2020) 29-02-2020 30-03-2020 30-03-2020 31-03-2020 03:30 PM Active View
11. Picking and collection of 20 percent SM Grade Ore CHL-535 from cleaning of sub grade mineral reject from ROM at Magazine Dump West Side section at Chikla Mine(MOIL/19-20/ET/410) 29-02-2020 30-03-2020 30-03-2020 30-03-2020 03:30 PM Active View
12. Purchase of Boiler Spares and IBR Valves-3 items(MOIL/19-20/ET-430 dt.29.02.2020) 29-02-2020 30-03-2020 30-03-2020 31-03-2020 03:30 PM Active View
13. Underground Filling Spreading at -270 L and -370 Level at Chikla Mine(MOIL/19-20/ET/409) 29-02-2020 30-03-2020 30-03-2020 30-03-2020 03:30 PM Active View
14. Purchase of Pre stressed Steel Wire Rope(WE-116 DT.29.02.2020(e-Tender no.MOIL/19-20/ET/429) 29-02-2020 26-03-2020 26-03-2020 27-03-2020 03:30 PM Active View
15. Purchase of Traction Batteries(WE-115 Dt.28.02.2020 (e-Tenderno.MOIL/19-20/ET/427) 28-02-2020 26-03-2020 26-03-2020 27-03-2020 03:30 PM Active View
16. Purchase of Oil and Lubricants - 26 Items (MOIL/19-20/ET/425 (for MS Mines - 25 Lots) and MOIL/19-20/ET/426 (for MP Mines - 22 Lots)) (Only Through e-procurement)(WE-97 DT.27/02/2020 (ET/425 AND ET/426)) 27-02-2020 25-03-2020 25-03-2020 26-03-2020 03:30 PM Active View
17. Construction of Toilet Block in RNT School at Ukwa Mine(AGT/CIVIL/CSR/UK/LT/19-20/1219) 25-02-2020 03-03-2020 03-03-2020 03-03-2020 04:30 PM Active View
18. Purchase of 11KV/110V Potential Transformer for Chikla Mine(TE-20 DT.24022020) 24-02-2020 11-03-2020 11-03-2020 11-03-2020 04:30 PM Active View
19. Purchase of 11KV Grade 100/5A Current Transformers for Chikla Mine(TE-19 DT.24022020) 24-02-2020 11-03-2020 11-03-2020 11-03-2020 04:30 PM Active View
20. Purchase of PP MULTIFILAMENT FILTER CLOTH - 560 Nos.(MOIL/19-20/ET-408 dt.24.02.2020) 24-02-2020 17-03-2020 17-03-2020 18-03-2020 03:30 PM Active View
21. Purchase of 120W LED Street Light Fitting for Chikla Mine(TE-18 DT.22022020) 22-02-2020 07-03-2020 07-03-2020 07-03-2020 04:30 PM Active View
22. Purchase of Air Blower Assembly suitable for 250HP DC Motor for Chikla Mine(TE-17 DT.22022020) 22-02-2020 07-03-2020 07-03-2020 07-03-2020 04:30 PM Active View
23. Unloading Assembling Commissioning of 08 Nos New Caterpillar 60 T Capacity Dumper at Dongri Buzurg Mine(DB/MECH/19-20/JGM(MECH)/946) 21-02-2020 25-02-2020 25-02-2020 25-02-2020 04:30 PM Active View
24. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR OF KIRLOSKAR MAKE PUMP RKB125/30K-8STG(PUR/MOIL/C-5/28/E-64/973-M Dt. 18/02/2020) 19-02-2020 13-03-2020 13-02-2020 13-02-2020 03:30 PM Active View
25. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR OF KIRLOSKAR MAKE PUMP RKB125/30K-8STG(PUR/MOIL/C-5/28/E-64/973-M Dt. 18/02/2020) 19-02-2020 13-03-2020 13-03-2020 13-03-2020 03:30 PM Active View
26. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR VENTRA MAKE 4TON BATTERY OPERATED LOCOMOTIVE.(PUR/MOIL/C-5/44/E-65/974-MDt. 18/02/2020) 19-02-2020 20-03-2020 20-03-2020 20-03-2020 03:30 PM Active View
27. Transportation of 325MT of Bottom Fly Ash from NTPC Mouda to Munsar Mine for underground backfilling works.(Mun/Mining/NIT/LT/19-20/190 Date 16.02.2020) 17-02-2020 26-02-2020 26-02-2020 26-02-2020 04:30 PM Active View
28. Purchase of RECESS PLATES - PP-160 NOS.(MOIL/19-20/ET-407 dt.17.02.2020) 17-02-2020 19-03-2020 19-03-2020 20-03-2020 03:30 PM Active View
29. Cleaning of drain,sewer lines of camp colonies of Balaghat Mine( Civil/BGT/LT/2019-20/1190) 13-02-2020 27-02-2020 27-02-2020 27-02-2020 04:30 PM Active View
30. Maintenance and operation of water supply scheme at Ukwa Mine.(MOIL/19-20/ET/391) 12-02-2020 16-03-2020 16-03-2020 16-03-2020 03:30 PM Active View
31. A Drilling of 2 no bore holes for sand stowing work and B Drilling of 2 no for underground dewatering work at Balaghat Mine.(MOIL/19-20/ET/392) 12-02-2020 12-03-2020 12-03-2020 12-03-2020 03:30 PM Active View
32. Construction Repairing of boundary wall near temple side C type Qr to mudplug store at Balaghat Mine(Civil/BGT/LT/2019-20/1168) 11-02-2020 24-02-2020 24-02-2020 24-02-2020 04:30 PM Active View
33. Removal of spillage material accumulated in 16.5 level at Balaghat Mine(Mining/BGT/LT/19-20/1170) 11-02-2020 24-02-2020 24-02-2020 24-02-2020 04:30 PM Active View
34. Purchase of Backhoe Loader for Chikla Mine(M.S) - 1 No.(1 Lot) (Only Through e-procurement)(WE-121(ET-406) DT.11/02/2020) 11-02-2020 03-03-2020 03-03-2020 04-03-2020 03:30 PM Active View
35. Outsourcing of Pilot plant operation at Balaghat Mine(Mining/BGT/LT/19-20/1162) 10-02-2020 18-02-2020 18-02-2020 18-02-2020 04:30 PM Active View
36. Hiring of 50 MT capacity02 Nos mobile crane with 360 degree revolving telescopic extended Boom for unloading and assembling of CAT 773E 60T Dumper 8 Nos Hiring of 80 MT capacity Mobile crane with 360 degree revolving telescoping Extended Boom of(MOIL/19-2 10-02-2020 20-02-2020 20-02-2020 20-02-2020 03:30 PM Active View
37. Purchase of Crawler mounted, Diesel Engine operated Dozer with Operation and maintenance spares for Dongri Buzurg Mine(M.S) - 1 No. (2 Lots) (Only Through e-procurement)(WE-113(ET-405) DT.10/02/2020) 10-02-2020 11-03-2020 11-03-2020 12-03-2020 03:30 PM Active View
38. Picking and collection of low grade Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine Western Hill from Ch.8 to Ch.18(MOIL/19-20/ET/396) 06-02-2020 06-03-2020 06-03-2020 06-03-2020 03:30 PM Active View
39. Operation of vibrating screen to screen sub grade mineral reject of underground ROM at Balaghat Mine(MOIL/19-20/ET/399) 06-02-2020 06-03-2020 06-03-2020 06-03-2020 03:30 PM Active View
40. Picking and collection of low grade Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East Side Part-6(MOIL/19-20/ET/397) 06-02-2020 06-03-2020 06-03-2020 06-03-2020 03:30 PM Active View
41. Picking and collection of low grade Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East Side Part-4(MOIL/19-20/ET/398) 06-02-2020 06-03-2020 06-03-2020 06-03-2020 03:30 PM Active View
42. Accidental repairing of Bolero jeep bearing registration no. MP50C4489 of Balaghat Mine(AGT/BGT/MECH/ MG/19-20/1137) 05-02-2020 17-02-2020 17-02-2020 17-02-2020 04:30 PM Active View
43. Operation of industrial pumping operation in UG levels at Kandri mine(A-III/KAN/19-20/3594) 05-02-2020 12-02-2020 12-02-2020 12-02-2020 04:30 PM Active View
44. Purchase of VHF Walkie Talkie Handset Model XiR P3688 for Dongri buzurg Mine(DB/ELECT/19-20/871) 05-02-2020 27-02-2020 27-02-2020 27-02-2020 04:30 PM Active View
45. Installation of vibrating screen, conveyor belt system and feed hopper at Balaghat Mine.(BGT/MECH/IMB/19-20/1141) 05-02-2020 25-02-2020 25-02-2020 25-02-2020 04:30 PM Active View
46. Fabrication and Installation of Flap Door type arrangement in Holmes Shaft Skip compartment at 12L, below 11.5th LS.(BGT/MECH/WINDER/19-20/1116) 05-02-2020 25-02-2020 25-02-2020 25-02-2020 04:30 PM Active View
47. Fabrication of Miscellaneous Items for Balaghat Mine(BGT/MECH/MISC ITEM/19-20/1140) 05-02-2020 25-02-2020 25-02-2020 25-02-2020 04:30 PM Active View
48. Pushing and unloading of ROM and rock tubs at surface at Chikla Mine(MOIL/19-20/ET/393) 05-02-2020 05-03-2020 05-03-2020 05-03-2020 03:30 PM Active View
49. Transportation of underground and surface tubs at Kandri Mine(MOIL/19-20/ET/394) 05-02-2020 05-03-2020 05-03-2020 05-03-2020 03:30 PM Active View
50. Cleaning of surplus underground ROM at Munsar Mine(MOIL/19-20/ET/395) 05-02-2020 05-03-2020 05-03-2020 05-03-2020 03:30 PM Active View
51. Picking and collection of low grade Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East Side Part-5(MOIL/19-20/ET/400) 05-02-2020 05-03-2020 05-03-2020 05-03-2020 03:30 PM Active View
52. Renovation of Safety temple near Adm. Office at Balaghat Mine( Civil/BGT/T E/2019-20/1132) 04-02-2020 10-02-2020 10-02-2020 10-02-2020 04:30 PM Active View
53. Repairing of civil work for various location of camp premises at Balaghat Mine(Civil/BGT/T E/2019-20/1125) 04-02-2020 10-02-2020 10-02-2020 10-02-2020 04:30 PM Active View
54. Drilling of bore hole of 110mm dia from 13.5th level to 16.5 th level at Holmes Shaft and 12th level to 13.5th level at Production shaft in underground of Balaghat Mine.(AGT/BGT/MECH/UG/19-20/1115) 04-02-2020 20-02-2020 20-02-2020 20-02-2020 04:30 PM Active View
55. Purchase of Air Blowers (2 Stage Evaporative Cooling System) for MOIL BHAWAN, Nagpur - 6 Nos.(6 Lots.) (Only Through e-procurement)(WE-117(ET-402) DT.03/02/2020) 03-02-2020 25-02-2020 25-02-2020 26-02-2020 03:30 PM Active View
56. Concrete for U/G at Ore drive at 1950 Level at10800 section at Ukwa Mine(AGT/Min/UK/LT/19-20/1117) 03-02-2020 10-02-2020 10-02-2020 10-02-2020 04:30 PM Active View
57. Purchase of Gym Equipments and other essential items at Gymnasium, West Court, Nagpur - 15 Lots.(Only Through e-procurement)(WE-119(ET-403) DT.03/02/2020) 03-02-2020 24-02-2020 24-02-2020 25-02-2020 03:30 PM Active View
58. CLEANING OF SEPTIC TANK AND DRAIN AT CAMP AREA AT TIRODI MINE.(TRD/CIVIL/19-20/5307 Dated 08.01.2020) 01-02-2020 07-02-2020 07-02-2020 07-02-2020 03:30 PM Active View
59. Purchase of Explosive and accessories(WE-110 dt.31.01.2020 (e-Tenderno.MOIL/19-20/ET/401) 01-02-2020 19-02-2020 19-02-2020 20-02-2020 03:30 PM Active View
60. REPAIRING OF TRACK CHAIN LEFT SIDE OF TATA 450 HY. EXCAVATOR TIRODI MINE.(TRD/MECH/HO/2020/471 DT-02/01/2020) 01-02-2020 12-02-2020 12-02-2020 12-02-2020 03:30 PM Active View
61. Outsourcing of Electrically Operated Skid Mounted Crushing and Screening Plant Operation at Munsar Mine(MOIL/19-20/ET/279) 29-01-2020 28-02-2020 28-02-2020 28-02-2020 03:30 PM Active View
62. Providing and Laying 90mm HDPE Pipe pipe from chargaon Colony Main Entrance Upto recently constructed GSR under water supply scheme at Munsar Mine( MUN/CIVIL/NIT/19-20/185 DT.25.01.2020) 27-01-2020 04-02-2020 04-02-2020 04-02-2020 04:30 PM Active View
63. Providing, Installation and fixing pumps and extending of HDPE Pipe upto KL Pit Munsar Mine(MUN/CIVIL/NIT/19-20/186 DT.25.01.2020) 27-01-2020 04-02-2020 04-02-2020 04-02-2020 04:30 PM Active View
64. Purchase of G.I. Core Boxes(WE-118 DT.27.01.2020 e-Tender no.MOIL/19-20/ET/390) 27-01-2020 10-02-2020 10-02-2020 11-02-2020 03:30 PM Active View
65. Outsourcing of Industrial Pumping Operation at Underground levels and Opencast at Kandri Mine(MOIL/19-20/ET/381) 25-01-2020 27-02-2020 27-02-2020 27-02-2020 03:30 PM Active View
66. Hydraulic Pressure and Ultrasonic testing of air pressure vessel installed for supply of compressed air in Underground and of various tippers and machines at Balaghat Mine.(AGT/BGT/MECH/NDT-PV/19-20/1065) 24-01-2020 10-02-2020 10-02-2020 10-02-2020 04:30 PM Active View
67. Providing main and check meters with metering equipment at 15.2 MW and 4.8 MW Wind Energy Farms, Ratedi and Nagda Hills, Dewas(MP) respectively(MOIL/19-20/ET/382) 24-01-2020 27-02-2020 27-02-2020 27-02-2020 03:30 PM Active View
68. Replacement of Buntons, Manway platforms and ladders of second outlet shaft at Balaghat Mine.(AGT/BGT/MECH/19-20/1087) 23-01-2020 12-02-2020 12-02-2020 12-02-2020 04:30 PM Active View
69. Laying of 6 inch and 2 inch GI Pipe line from GSR tank near rest house to old north section sand plant for sand stowing operation at Balaghat Mine(AGT/BGT/MECH/PIPE/19-20/1086) 23-01-2020 12-02-2020 12-02-2020 12-02-2020 04:30 PM Active View
70. Construction of structural and RCC foundation for leaching unit in EMD plant of Dongri Buzurg Mine(MOIL/19-20/ET/385) 23-01-2020 27-02-2020 27-02-2020 27-02-2020 03:30 PM Active View
71. Providing and fixing of UPVC HIGH PRESSURE THEADED pipes 8 inch (200mm) diameter of 270 MTR for sand stowing plant at Balagaht Mine.(MOIL/19-20/ET/383) 23-01-2020 27-02-2020 27-02-2020 27-02-2020 03:30 PM Active View
72. Construction of boundary wall in precast, prestressed column and panels along lease boundry in Balapur and Syndicate camp and siding area and providing fixing concertina coil fencing in three layers at Dongri Buzurg Mine(MOIL/19-20/ET/386) 23-01-2020 27-02-2020 27-02-2020 27-02-2020 03:30 PM Active View
73. Providing and supplying of Desk and Benches size 42inch by 15 inches by 30 inches with self for RNT school Ukwa (Civil/UK/TE/2019-20/1072) 20-01-2020 03-02-2020 03-02-2020 03-02-2020 4:30 PM Active View
74. Providing and supplying of Desk and Benches size 42inch by 15 inches by 30 inches with self for RNT school Balaghat (Civil/BGT/TE/CSR/2019-20/1069) 20-01-2020 03-02-2020 03-02-2020 03-02-2020 4:30 PM Active View
75. Exploratory core drilling on PL areas of Chikla and Satak village over an area of 99.36Ha and 46.90Ha (MOIL/19-20/ET/357) 20-01-2020 20-02-2020 20-02-2020 20-02-2020 3:30 PM Active View
76. Maintenance of gardens at Balaghat mine. (MOIL/19-20/ET/366) 18-01-2020 17-02-2020 17-02-2020 17-02-2020 3:30 PM Active View
77. WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR MEEKA MAKE EOT CRANE (PUR/MOIL/C-11/24/E-63/914-M Dt. 18-01-2020) 18-01-2020 10-02-2020 10-02-2020 10-02-2020 3:30 PM Active View
78. Construction of new water supply scheme at Ukwa Mine. (MOIL/19-20/ET/367) 18-01-2020 20-02-2020 20-02-2020 20-02-2020 3:30 PM Active View
79. Cleaning and Screening of SM Grade small 34 Percent Mn. KDL 4543 from Sub Grade Mineral reject from Underground at Kandri Mine(Kan/Mining/NIT/19-20/3485 Date 17.01.2020) 17-01-2020 24-01-2020 24-01-2020 24-01-2020 04:30 PM Active View
80. Extra excavation in Manganiferous rocks at 4th Level of 2nd Vertical Shaft Section at Chikla Mine(MOIL/19-20/ET/378) 17-01-2020 24-01-2020 24-01-2020 24-01-2020 03:30 PM Active View
81. Proposal for repairing of bucket of K450 Hyd Excavator of Tirodi Mine(TRD/MECH/HO/19-20/423 DT-06/01/2020) 17-01-2020 30-01-2020 30-01-2020 01-02-2020 11:00 AM Active View
82. PURCHASE OF CS WHEEL ASSEMBLY WITH COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(PUR/MOIL/BGT/GB CAR/19-20/1050) 17-01-2020 05-02-2020 05-02-2020 05-02-2020 04:30 PM Active View
83. Purchase of IGBT Based Active Harmonic Filter With Capacitor Banks for Various Mines - 8 Sets (8 Lots) (Only Through e-procurement)(WE-112 (ET-389) DT.16/01/2020) 17-01-2020 06-02-2020 06-02-2020 07-02-2020 03:30 PM Active View
84. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ANUVIN MAKE PUMP(PUR/MOIL/C-11/21/E-62/908-M Dt.16-01-2020) 17-01-2020 07-02-2020 07-02-2020 07-02-2020 03:30 PM Active View
85. Maintenance, Distribution and Collection of Cap Lamps at Gumgaon Mine through Outsourcing for the Period of One year(MOIL/19-20/ET/380) 17-01-2020 17-02-2020 17-02-2020 17-02-2020 03:30 PM Active View
86. Removal of spillage from the bottom of production shaft and inset of 15th Level at Balaghat Mine(MOIL/19-20/ET/387) 17-01-2020 17-02-2020 17-02-2020 17-02-2020 03:30 PM Active View
87. Muffling for blasting at 6A 6B and 6C section of North Tirodi Mine(MOIL/19-20/ET/379) 17-01-2020 17-02-2020 17-02-2020 17-02-2020 03:30 PM Active View
88. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-61/900-M Dt. 15-01-2020) 15-01-2020 07-02-2020 07-02-2020 07-02-2020 03:30 PM Active View
89. Repairing of Track Roller of TataHitachi 450 Sr.No. 2 Hydraulic Excavator of Dongri Buzurg Mine (10 Nos.).(DB/MECH/19-20/JGM(MECH)/732) 15-01-2020 30-01-2020 30-01-2020 30-01-2020 04:30 PM Active View
90. e Procurement of CONVEYOR BELT(MOIL/19-20/ET/388) 15-01-2020 17-02-2020 17-02-2020 18-02-2020 03:30 PM Active View
91. Providing 6 mbps 1 is to 1 Internet Leased Line at Kandri Mine(ADGM/Grp-III/SYS/NW/19-20/1017) 13-01-2020 20-01-2020 20-01-2020 20-01-2020 04:30 PM Active View
92. FIBER GLASS REINFORCED PLASTIC BLADE 1 SET FOR 40 HP VENTILATION FAN(PUR/MOIL/Bel/2019-20/2492 Date 06/01/2020) 10-01-2020 22-01-2020 22-01-2020 22-01-2020 04:30 PM Active View
93. Purchase of Hydraulic Crawler DTH Drill Machine - 1 No.alongwith Comprehensive Operation and Maintenance for the Period of 6 Year for Dongri Buzurg Mine(M.S) (7 Lots) (Only Through e-procurement)( WE-98(ET-377) DT.10/01/2020) 10-01-2020 25-02-2020 25-02-2020 26-02-2020 03:30 PM Active View
94. Purchase of M.S. LANCING PIPE-24 MT(MOIL/19-20/ET-376 dt.09.01.2020) 09-01-2020 30-01-2020 30-01-2020 31-01-2020 03:30 PM Active View
95. Installation, commissioning and Testing of CCTV System with Camera at cage winder to view inside / outside of cage with 6 Months recording capacity(KD/Elect/TE/19-20/ 3347, 07.01.2020) 07-01-2020 28-01-2020 28-01-2020 28-01-2020 04:30 PM Active View
96. PROCUREMENT OF GEAR BOX FOR 500MM CONVEYOR BELT FOR CHIKLA MINE(TE-13 DT.04122019) 06-01-2020 11-01-2020 11-01-2020 11-01-2020 04:30 PM Active View
97. TENDER DOCUMENTS FOR PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR 1000KVA, 11KV/433V TRANSFORMER FOR 2ND VERTICAL SHAFT SUBSTATION OF MUNSAR MINE(ELECT/MUNADGM/19-20/955) 06-01-2020 11-01-2020 11-01-2020 11-01-2020 03:30 PM Active View
98. Purchase of POLYPROPYLENE JUMBO BAG CARRYING CAPACITY 1.0 MT-13650 NOS.(MOIL/19-20/ET-375 dt.06.01.2020) 06-01-2020 28-01-2020 28-01-2020 29-01-2020 03:30 PM Active View
99. Purchase of Drilling Accessories for DI-500 Drilling Machine-3 Items(MOIL/19-20/ET-373 dt.04.01.2020) 04-01-2020 28-01-2020 28-01-2020 29-01-2020 03:30 PM Active View
100. Procurement of Standby Winder Control System for Vertical Shaft Winder of Beldongri Mine(MOIL/19-20/ET/353) 04-01-2020 03-02-2020 03-02-2020 03-02-2020 03:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.