Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Underground concreting work to establish crosscut for preparation of Chute and manways at Chikla Mine(MOIL/20-21/ET/38) 19-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
2. Loading of explosives from Magazine and unloading at different location of Tirodi mine(MOIL/20-21/ET/42) 19-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
3. Making of stemming material Mug Plug used for blasting at Ukwa Mine(MOIL/20-21/ET/40) 19-05-2020 19-06-2020 19-06-2020 19-05-2020 03:30 PM Active View
4. Filling and Spreading of waste rock generated through rock development in 300 L between Ch. 34 to Ch. 40 in Gumgaon Mine(MOIL/20-21/ET/37) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
5. Hiring of machinery for sub grade mineral reject of UG ROM handling from Magazine area at Kandri Mine(MOIL/20-21/ET/35) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
6. Transportation of bottom ash from Adani Power Plant, Tiroda to Ukwa Mine of M S MOIL Ltd. for stowing purpose(MOIL/19-20/ET/34) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
7. Retiling and Reroofing of Camp Quarters as Monsoon Preparatory Works at Kandri Mine.(Kan/Civil/NIT/2020-21/219 Date 17.05.2020) 18-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
8. Cleaning of Storm Water Drain of Surface and Underground Sump at Kandri Mine.(Kan/Civil/NIT/2020-21/320 Date 17.05.2020) 18-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
9. Hiring of Consultant for Estimation Drawings including working drawings and structural design for centralized store building with storage sheds yards and peripheral boundary wall at Balaghat Mine.(Civil/BGT/T E/2020-21/340) 18-05-2020 01-06-2020 01-06-2020 01-06-2020 04:30 PM Active View
10. Hiring of structural Consultant services for Construction of foundation work for installation of new gear box and motor for Cage winder of Home shaft at Balaghat Mine(Civil/BGT/T E/2020-21/338) 18-05-2020 01-06-2020 01-06-2020 01-06-2020 04:30 PM Active View
11. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR RE-TILLING ROOF REPAIR INCLUDING LAYING OF POLYTHENE COVER OF CAMP QUARTER AT CHIKLA MINE.(TE-CH/CIVIL/20-21/210) 18-05-2020 25-05-2020 25-05-2020 25-05-2020 03:30 PM Active View
12. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND FILLING SPREADING AT -170 LEVEL AT CHIKLA MINE(TE-03 Dt.18052020) 18-05-2020 28-05-2020 28-05-2020 28-05-2020 04:30 PM Active View
13. Renovation of Production Shaft by replacing Buntons at Balaghat Mine(MOIL/20-21/ET/23) 18-05-2020 25-06-2020 25-06-2020 25-06-2020 03:30 PM Active View
14. Fencing of Electrical Switchyard beside existing Compressor House at Munsar Mine.(MUN/CIVIL/NIT/19-20/19 DT.16.05.2020) 16-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
15. Maintenance and Upkeeping of ETP at EMD Plant,Dongri Mine 2020(MOIL/EMD/CH/Jt.GM/20-21/134) 15-05-2020 26-05-2020 26-05-2020 26-05-2020 11:00 AM Active View
16. Removal of waste rock and handling the same by mechanized means in the F W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/30) 15-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
17. Vertical development at 1750 Level and 1650 Level at Ukwa Mine(MOIL/20-21/ET/32) 15-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
18. Vertical development at 1850 Level at Ukwa Mine(MOIL/20-21/ET/33) 15-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
19. Picking and Collection of Ferro Grade 34 percent Mn. Lump Ore KD-4543 and 30 percent Mn. Lump ore KDL-435 from sub grade mineral reject of underground ROM at Kandri Mine(MOIL/20-21/ET/39) 15-05-2020 22-05-2020 22-05-2020 22-05-2020 03:30 PM Active View
20. Removal of waste rock and handling the same by mechanized means in the F W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/30) 15-05-2020 02-07-2020 02-07-2020 02-07-2020 03:30 PM Active View
21. Vertical development at 1850 Level at Ukwa Mine(MOIL/20-21/ET/33) 15-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
22. REPAIRIRNG OF MATHER and PLATT AT 250HP CENTRIFUGAL PUMP NO 1 SR N 81237467/30/1 OPEARTING AT DONGRI BUZURG MINE(DB/MECH/Workshop/20-21/110) 12-05-2020 05-06-2020 05-06-2020 05-06-2020 04:30 PM Active View
23. Procurement of Drill Pipe 89 mm for Di500 Drill Machine at DongriBuzurg mine(PUR/DB/20-21/109) 12-05-2020 09-06-2020 09-06-2020 09-06-2020 04:30 PM Active View
24. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-02/38-M Dt. 11/05/2020) 11-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
25. Engaging Housekeeping Agency for cleaning of MOIL Bhawan, CMD Bungalow, CMS premises etc(MOIL/20-21/ET/22) 11-05-2020 11-06-2020 11-06-2020 11-06-2020 03:30 PM Active View
26. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-02/38-M Dt. 11/05/2020) 11-05-2020 10-07-2020 10-07-2020 10-07-2020 03:30 PM Active View
27. Replacement of sheave wheel 1 No at Kandri Mine(A-III/KAN/20-21/228) 08-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
28. PURCHASE OF COLD VULCANIZING SOLUTION AND HARDNER FOR JOINTING OF CONVEYOR BELTS AT BALAGHAT MINE(PUR/MOIL/BGT/IMB/20-21/78 dated 07.05.2020) 08-05-2020 26-05-2020 26-05-2020 26-05-2020 04:30 PM Active View
29. Dismantling, shifting and reassembling of 20 Nos of Joplin jig assembly from old site to new shed constructed along the ferro plant of balaghat Mine(AGT/BGT/MECH/JIG/20-21/256) 07-05-2020 15-05-2020 15-05-2020 15-05-2020 04:30 PM Active View
30. Construction of Shed over Sand Stowing Plant near DSU at Munsar Mine(Mun/Civil/NIT/2020-21/12 Date 06.05.2020) 06-05-2020 16-05-2020 16-05-2020 16-05-2020 04:30 PM Active View
31. Providing Designing Fabrication Installation and commissioning of motorized gate for mine workshop at Chikla mine(TE-22 DT.02042020) 06-05-2020 20-05-2020 20-05-2020 20-05-2020 04:30 PM Active View
32. Purchase of Undercarriage assemblies for HEMM.(MOIL/20-21/ET-31 dt.06.05.2020) 06-05-2020 11-06-2020 11-06-2020 12-06-2020 03:30 PM Active View
33. Purchase of CEMENT-824 MT(MOIL/20-21/ET-41 dt.06.05.2020) 06-05-2020 08-06-2020 08-06-2020 09-06-2020 03:30 PM Active View
34. PURCHASE OF BARE CENTRIFUGAL PUMP (MAKE- MAXFLOW PUMPS INDIA PVT.LIMITED, PUMP MODEL - 149HPB7R) - 1 NO. FOR BALAGHAT MINE(MP) (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/78/E-1/35 -M DT.06/05/2020) 06-05-2020 12-06-2020 12-06-2020 12-06-2020 03:30 PM Active View
35. Design, Manufacturing and Supply of 200 mm Butterfly valve Assy. without actuator for APIC Jig as per OEM Dimension along with material for I.M.B. plant.(AGT/BGT/MECH/IMB/20-21/71 Dated 04.05.2020) 05-05-2020 05-06-2020 05-06-2020 05-06-2020 04:30 PM Active View
36. Laying of Paver Blocks from CC Road upto Administrative Building Entrance at Kandri Mine.(KAN/Civil/NIT/2020-21/214 Date 02.05.2020) 04-05-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
37. Procurement of Telephone Exchange 200 lines for Balaghat Mine(BGT/ELECT/20-21/204) 02-05-2020 01-06-2020 01-06-2020 01-06-2020 04:30 PM Active View
38. Laying of Paver block for approach pathway and allied civil works for sewage treatment plant at Munsar Mine(MUN/CIVIL/NIT/20-21/08 DT.02.05.2020) 02-05-2020 16-05-2020 16-05-2020 16-05-2020 04:30 PM Active View
39. Repairing of civil work for 6th level substation premises at Balaghat Mine(Civil/BGT/TE/2020-21/42) 01-05-2020 12-05-2020 12-05-2020 12-05-2020 04:30 PM Active View
40. Procurement of 650Metres of 4CX50SQMM aluminum Armoured Cable for Dongri Buzurg Mine(DB/ELECT/20-21/88) 30-04-2020 26-05-2020 26-05-2020 26-05-2020 04:30 PM Active View
41. Purchase of Aluminum and Copper Lugs and DC Glands for Dongri Buzurg Mine.(DB/ELECT/20-21/89) 30-04-2020 26-05-2020 26-05-2020 26-05-2020 04:30 PM Active View
42. Purchase of Hydraulic Rock Breaker Attachment for Excavator at Dongri Buzurg Mine(M.S) - 1 No. (1 Lot) (Only Through e-procurement)(WE-130(ET-19) DT.30/04/2020) 30-04-2020 26-05-2020 26-05-2020 27-05-2020 03:30 PM Active View
43. Purchase of Triple Deck Vibratory Screen for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-3(ET-21) DT.30/04/2020) 30-04-2020 20-05-2020 20-05-2020 21-05-2020 03:30 PM Active View
44. Purchase of Jaw Crusher, Size 750 X 375 mm for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-2(ET-20) DT.30/04/2020) 30-04-2020 28-05-2020 28-05-2020 29-05-2020 03:30 PM Active View
45. Purchase of Triple Deck Vibratory Screen for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-3(ET-21) DT.30/04/2020) 30-04-2020 01-06-2020 01-06-2020 02-06-2020 03:30 PM Active View
46. Purchase of Ammonium Nitrate-Prilled-119 MT(WE-128 DT.29.04.2020 (e-Tender no.MOIL/20-21/ET/18) 29-04-2020 21-05-2020 21-05-2020 22-05-2020 03:30 PM Active View
47. Maintenance and Watering of Plantation at Kandri Mine(KAN/Civil/NIT/2020-21/160 Date 21.04.2020) 28-04-2020 04-05-2020 04-05-2020 04-05-2020 04:30 PM Active View
48. Repairing rubber lining of MSRL Electrolytic Cell Tanks of EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET/7) 27-04-2020 27-05-2020 27-05-2020 27-05-2020 03:30 PM Active View
49. Recovery of Reduced Ore and EMD Powder and Washing of Bottom EMD at EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET/6) 27-04-2020 27-05-2020 27-05-2020 27-05-2020 03:30 PM Active View
50. Removal of waste rock from the dump at 265 MRL near Jawahar Shaft of Chikla mine(TE-23 DT.09042020) 27-04-2020 04-05-2020 04-05-2020 04-05-2020 04:30 PM Active View
51. Procurement of Electrical C class material for Balaghat Mine(BGT/ELECT/2020-21/31) 25-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
52. Renovation of old floor Tiles with water supply and sanitary fittings work for Guest room bath of MM bunglow at Balaghat Mine(Civil/BGT/LT/2020-21/10) 22-04-2020 12-05-2020 12-05-2020 12-05-2020 04:30 PM Active View
53. Monsoon preparatory work for cleaning of surface drain in industrial premises at Balaghat Mine.(Civil/BGT/LT/2020-2021/14) 22-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
54. Providing PVC Polythene Sheets to Mangalore Tiled Roofing to Camp Quarters and tarpaulin sheets over industrial structures including various miscellaneous repair works and retiling at Balaghat Mine.(Civil/BGT/LT/2020-21/16) 22-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
55. RCC roof repair of camp quarters at Balaghat Mine.(Civil/BGT/LT/2020-21/18) 22-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
56. Components of Cage Suspension Gear(PUR/MOIL/C-12/12/WE-01/ET/17) 22-04-2020 05-05-2020 05-05-2020 06-05-2020 03:30 PM Active View
57. Purchase of Spares for Flameproof Make Miners Cap Lamps(KD/Elect/TE/20-21/119, Dtd - 20.04.2020) 21-04-2020 01-06-2020 01-06-2020 10-06-2020 04:30 PM Active View
58. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND CONCRETING WORK OF MANWAY AT STOPE NO 2365 AT -270L OF CHIKLA MINE(TE-02 Dt.19042020) 20-04-2020 28-04-2020 28-04-2020 28-04-2020 03:30 pm Active View
59. Maintenance and Upkeeping of ETP at EMD PLANT Dongri Buzurg Mine 2020 (MOIL/EMD/CH/Jt.GM/20-21/35) 20-04-2020 05-05-2020 05-05-2020 05-05-2020 11:00 am Active View
60. Repairing of Multi Stage Centrifugal Pump 150HP of 4th Level with material.(Mech/KD/19-20/4045) 20-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 pm Active View
61. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND FILLING SPREADING AT -270L AT CHIKLA MINE(TE-01 Dt.19042020) 20-04-2020 28-04-2020 28-04-2020 28-04-2020 03:30 pm Active View
62. Comprehensive Annual Maintenance Contract (CAMC) of 127 Nos. of Air-Conditioners of MOIL Ltd Nagpur(MOIL/20-21/ET/5) 20-04-2020 18-05-2020 18-05-2020 18-05-2020 03:30 pm Active View
63. Purchase of Spares for Exide Make Miners Cap Lamps(KD/Elect/TE/20-21/118, Dtd - 20.04.2020) 20-04-2020 01-07-2020 01-07-2020 01-07-2020 04:30 pm Active View
64. Shifting and Transport of pebbles accumulated due to Sand Stowing by old open plant at 234 MRL and dropping into the winze No. 2 of the level 193 MRL and Spreading at Beldongri Mine(MOIL/20-21/ET/9) 15-04-2020 13-05-2020 13-05-2020 13-05-2020 03:30 pm Active View
65. Hiring of equipment for removal of sub grade mineral reject of Underground ROM to recover SM Grade at Balaghat Mine(MOIL/20-21/ET/10) 15-04-2020 13-05-2020 13-05-2020 13-05-2020 03:30 pm Active View
66. Cleaning of surplus underground ROM at Munsar Mine(MOIL/20-21/ET/11) 15-04-2020 13-05-2020 13-05-2020 13-05-2020 03:30 pm Active View
67. Underground development work at -550 Level at Kandri Mine(MOIL/20-21/ET/12) 15-04-2020 13-05-2020 13-05-2020 13-05-2020 03:30 pm Active View
68. Trench cutting in ore stack for sampling at Dongri Buzurg Mine(MOIL/20-21/ET/16) 15-04-2020 29-04-2020 29-04-2020 29-04-2020 03:30 pm Active View
69. Making of stemming material Mug Plug used for blasting at Kandri Mine(MOIL/20-21/ET/14) 15-04-2020 15-05-2020 15-05-2020 15-05-2020 03:30 pm Active View
70. Trench cutting in ore stack at Kandri Mine(MOIL/20-21/ET/15) 15-04-2020 15-05-2020 15-05-2020 15-05-2020 03:30 pm Active View
71. Transportation of bottom ash from Adani Power Plant Tiroda to Balaghat Mine of M s MOIL Ltd. for stowing purpose(MOIL/20-21/ET/13) 15-04-2020 09-06-2020 09-06-2020 09-06-2020 03:30 pm Active View
72. Comprehensive Annual Maintenance Contract of Computers and Peripherals(MOIL20-21ET4) 13-04-2020 12-05-2020 12-05-2020 12-05-2020 03:30 pm Active View
73. Comprehensive Annual Maintenance Contract of Computers and Peripherals(MOIL/20-21/ET/4) 13-04-2020 12-05-2020 12-05-2020 12-05-2020 03:30 pm Active View
74. Removal of waste rock from the dump at 265 MRL near Jawahar Shaft of Chikla mine(TE-23 DT.09042020) 09-04-2020 23-04-2020 23-04-2020 23-04-2020 04:00 PM Active View
75. REPAIRING OF COMPLETE RHS SIDE TRACK CHAIN OF TATA 450 HYD EXCV. TIRODI MINE(TRD/MECH/HO/20/520/1251 DT 02.3.20) 18-03-2020 25-03-2020 25-03-2020 25-03-2020 03:30 PM Active View
76. Dismantling, shifting and reassembling of 20 Nos of Joplin jig assembly from old site to new shed constructed along the ferro plant of balaghat Mine.(AGT/BGT/MECH/JIG/19-20/1317) 18-03-2020 31-03-2020 31-03-2020 31-03-2020 04:30 PM Active View
77. Purchase of VIBRATORY CUP MILL - 1 No., HARDENED STEEL - 1 No. and TUNGSTEN CARBIDE LINED BOWL - 1 No.(3 Lots.) (Only Through e-procurement)(WE-127(ET-433) DT.17.03.2020) 17-03-2020 07-04-2020 07-04-2020 08-04-2020 03:30 PM Active View
78. Providing 6 mbps 1 is to 1 Internet Leased Line at Beldongri Mine(ADGM/GrpIII/SYS/NW/19-20/1353) 16-03-2020 23-03-2020 23-03-2020 23-03-2020 04:30 PM Active View
79. Major Over Hauling Repairing of Mather and Platt Make MultiStage Centrifugal Pump 150HP of 4th Level with material(A-III/KAN/19-20/4045) 14-03-2020 31-03-2020 31-03-2020 31-03-2020 04:30 PM Active View
80. Repair and rewinding of three submersible pumps of Balaghat Mine-15 HP , 35 HP , 40 HP(BGT/ELECT/19-20/1286) 13-03-2020 03-04-2020 03-04-2020 03-04-2020 04:30 PM Active View
81. Purchase of Various Types of Copper-Aluminium Bus Bar, etc. For EMD PLANT, DONGRI BUZURG MINE.(MOIL/19-20/ET-432 dt.12.03.2020) 12-03-2020 07-04-2020 07-04-2020 08-04-2020 03:30 PM Active View
82. Filling and spreading work at 13.5th level (North) section Balaghat Mine(Mining /BGT/LT/19-20/1290) 12-03-2020 24-03-2020 24-03-2020 24-03-2020 04:30 PM Active View
83. Outsourcing of Operation and Maintenance contract of Excavator-2 Nos, Dumpers-8 Nos, and Dozer-1 No at Dongri Buzurg Mine for the Period of Two Years.(MOIL/19-20/ET/423) 11-03-2020 13-04-2020 13-04-2020 13-04-2020 03:30 PM Active View
84. Cleaning and Screening of 30 percent Mn KDL435 from sub grade mineral reject from UG at Kandri Mine(KD/MINING/NIT/19-20/4074 dt. 08/03/2020) 09-03-2020 16-03-2020 16-03-2020 16-03-2020 04:30 PM Active View
85. Excavation in manganiferous rock from Ch.2850 to Ch.2050 at -30 Level underground at Munsar Mine(MOIL/19-20/ET/384) 09-03-2020 09-04-2020 09-04-2020 09-04-2020 03:30 PM Active View
86. Installation and Commissioning of new metering equipment required after enhancement of contract demand for industrial connection of EMD Plant, Dongri Buzurg(MOIL/19-20/ET/422) 09-03-2020 09-04-2020 09-04-2020 09-04-2020 03:30 PM Active View
87. Cleaning of sanitary pipe line drain chambers and removal of garbage from MOIL premises at Nagpur(MOIL/19-20/ET/418) 07-03-2020 07-04-2020 07-04-2020 07-04-2020 03:30 PM Active View
88. Providing and laying 3 inch HDPE pipe line from recently drilled bore upto GSR constructed for 200 A Type residential quarters colony water supply at Kandri Mine.(MOIL/19-20/ET/417) 07-03-2020 07-04-2020 07-04-2020 07-04-2020 03:30 PM Active View
89. Construction of residential quarters Type C 1 block 4 quarters and type D one block at Beldongri Mine(MOIL/19-20/ET/420) 07-03-2020 07-04-2020 07-04-2020 07-04-2020 03:30 PM Active View
90. Construction of personal toilets at Village Tighai Distt Nagpur under CSR(MOIL/19-20/ET/421) 07-03-2020 07-04-2020 07-04-2020 07-04-2020 03:30 PM Active View
91. Maintenance of gardens at Kandri Mine(MOIL/19-20/ET/419) 07-03-2020 07-04-2020 07-04-2020 07-04-2020 03:30 PM Active View
92. PURCHASE OF BARE CENTRIFUGAL PUMP (MAKE- MAXFLOW PUMPS INDIA PVT.LIMITED AND PUMP MODEL - 149HPB7R) - 1 NO. FOR BALAGHAT MINE(MP) (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/78/E-67/1050-M DT.07.03.2020) 07-03-2020 30-03-2020 30-03-2020 30-03-2020 03:30 PM Active View
93. Purchase of Steel Wire Ropes(WE-58 DT.05.03.2020(e-Tender No.MOIL/19-20/ET/431) 05-03-2020 30-03-2020 30-03-2020 31-03-2020 03:30 PM Active View
94. Collection of garbage and dump into barren /abundant land at Balaghat Mine(Civil/BGT/LT/2019-20/1257) 04-03-2020 16-03-2020 16-03-2020 16-03-2020 04:30 PM Active View
95. Drilling of 2Nos borehole with PVC casing near Slime pond and near F.M. Plant at Balaghat Mine(Civil/BGT/T E/2019-20/1255) 04-03-2020 16-03-2020 16-03-2020 16-03-2020 04:30 PM Active View
96. Procurement of Conveyor Belt Spares for IMB Plant at Dongri Buzurg Mine(PUR/DB/19-20/ 1016) 04-03-2020 18-03-2020 18-03-2020 18-03-2020 04:30 PM Active View
97. AMC for repairs and rewiring of Electrical Installations at Balaghat Mine(MOIL/19-20/ET/416) 04-03-2020 03-04-2020 03-04-2020 03-04-2020 03:30 PM Active View
98. Repairing of Turbocharger Assy of QSK19 Engine of BH60M Dumper operating at Dongri Buzurg Mine(DB/MECH/Dumper/19-20/1014) 03-03-2020 13-03-2020 13-03-2020 13-03-2020 04:30 PM Active View
99. TENDER DOCUMENTS FOR SUPPLYING OF DGMS APPROVED, FLAME PROOFGATE END BOX COMPLETE WITH ALL ACCESSORIES FOR MUNSAR MINE.(ELECT/MUN/ADGM/19-20/1270) 03-03-2020 10-03-2020 10-03-2020 10-03-2020 03:30 PM Active View
100. Procurement of 1 no. electrically operated Mono block pump for Dongri Buzurg Mine( PUR/DB/19-20/ 1015) 03-03-2020 18-03-2020 18-03-2020 18-03-2020 04:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.