Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. providing 6 mbps 1 is to 1 Internet Leased Line (ILL) at Kandri Mine(ADGM / GroupIII/SYS/NW/20-21/4859) 02-03-2021 10-03-2021 10-03-2021 10-03-2021 04:00 PM Active View
2. Wheel and Axle Assembly - 04 sets, for Battery Locomotive capacity 3 MT (1 set each for Gumgaon, Kandri, Chikla and Munsar Mines) and Ovis make Gear box with Wheel and Axle Assembly- 1 set for Capacity 4 MT Battery locomotive for Munsar Mine(PUR/MOIL/C-4/240/E-42/559 -M Dt.02.03.2021) 02-03-2021 24-03-2021 24-03-2021 24-03-2021 03:30 PM Active View
3. Cleaning and shorting of surplus underground ROM at Ch 10000 BDC Section of Ukwa Mine(AGT/Min/UK/LT/20-21/1274) 02-03-2021 10-03-2021 10-03-2021 10-03-2021 04:30 PM Active View
4. PROCUREMENT OF BRAKE TIE ROD FOR 250 H.P. DC WINDER AT KANDRI MINE(PUR /MOIL/AGTGRIII /KD/2020-21/4785) 02-03-2021 26-03-2021 26-03-2021 26-03-2021 04:30 PM Active View
5. Outsourcing of ELectrical Maintenance of EMD Plant, Dongri Buzurg Mine.(DB/ELECT/20-21/1255) 01-03-2021 10-03-2021 10-03-2021 10-03-2021 04:30 PM Active View
6. Heat Treatment of Spur Gear 128Nos Tooth Points of Winding Engine Gear Box of Production Shaft 550HP(AGENT/BGT/MECH/PS/20-21/1277) 01-03-2021 23-03-2021 23-03-2021 23-03-2021 04:30 PM Active View
7. Rebuilding of Output Spur Gear -128 (Tooth Points) of Winding Engine of Production Shaft-550HP(AGENT/BGT/MECH/PS/20-21/1276) 01-03-2021 23-03-2021 23-03-2021 23-03-2021 04:30 PM Active View
8. Exploratory core drilling in ML area of Tirodi, Sukli and Sitapatore Mine, Tahsil Tirodi, Dist. Balaghat(MOIL/20-21/ET/314) 01-03-2021 31-03-2021 31-03-2021 31-03-2021 03:30 PM Active View
9. Purchase of Continuous Ambient Air Quality Monitoring Stations (CAAQMS) for MOIL Ltd. Mines with Comprehensive annual maintenance contract (CAMC) for a period of 3 years.(WE-92 DT.01.03.2021 (e-TenderNo. MOIL/20-21/ET/322) 01-03-2021 12-04-2021 12-04-2021 13-04-2021 03:30 PM Active View
10. Dismantling of old staff quarters at Balaghat Camp-8 Units and Khapa Camp 3 blocks 12 Units at Kandri Mine(KAN/CIVIL/NIT/20-21/4794 dt 27.02.2021) 28-02-2021 09-03-2021 09-03-2021 09-03-2021 04:40 PM Active View
11. Hiring of Diesel Jeep for the period of Five Months at Balaghat Mine(AGENT/BGT/MECH/JEEP/20-21/273) 27-02-2021 05-03-2021 05-03-2021 05-03-2021 04:30 PM Active View
12. Watch and ward to new colony premises at chandmara village at dongri buzurg mine(DB/CIVIL/20-21/2521 Dated 05/01/2021) 27-02-2021 05-03-2021 05-03-2021 05-03-2021 04:30 PM Active View
13. Renovation of Vertical Shaft by Replacement of Buntons, Guide Rails at Kandri Mine(MOIL/20-21/ET/310) 26-02-2021 02-04-2021 02-04-2021 02-04-2021 03:30 PM Active View
14. TENDER DOCUMENTS FOR INSTALLATION AND COMMISSIONING OF ELECTRO GATE LOCK SYSTEM AT SURFACE AND UNDERGROUND WITH PROPER ARRANGEMENT AND PROGRAMMING IN EXISTING SYSTEM OF PRODUCTION SHAFT AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/20-21/1200) 25-02-2021 04-03-2021 04-03-2021 04-03-2021 03:30 PM Active View
15. Procurement of electrical spares of traction Locomotive for Chikla Mine.(CH/ELECT/20-21/1446) 25-02-2021 09-03-2021 09-03-2021 09-03-2021 04:30 PM Active View
16. Tender enquiry inviting in Single bid system for House keeping work at C S Plant at Chikla mine(TE-26 DT-25022021) 25-02-2021 08-03-2021 08-03-2021 08-03-2021 03:30 PM Active View
17. Regular clearing of main bunker ore flow in IMB plant at Dongri Buzurg Mine(DB/MECH/IMB/20-21/1448) 24-02-2021 02-03-2021 02-03-2021 02-03-2021 02:30 PM Active View
18. PURCHASE OF HORIZONTAL AND VERTICAL BRAKE TIE RODS FOR 250 HP WINDER AT GUMGAON MINE.(Agent DGM (Mines)/Grp-III/2020-21/2030) 24-02-2021 10-03-2021 10-03-2021 10-03-2021 03:30 PM Active View
19. Applications for empanelment of firms for conducting Transaction Audit for two years extendable to three years (2 plus 1 years).(MOIL/I. Audit/2020-21/EETA/01 24-02-2021 16-03-2021 16-03-2021 16-03-2021 02:00 PM Active View
20. Renovation of 2nd Outlet Shaft by Replacing the Buntons, Platform, Ladders and Fencing at Balaghat Mine(MOIL/20-21/ET/261) 24-02-2021 24-03-2021 24-03-2021 24-03-2021 03:30 PM Active View
21. CLEANING AND SORTING OF ROM RECOVERED FORM PIT OF SITAPATORE/SUKLI MINE.(TRD/CIVIL/2020-21/1243 DT. 15.02.221) 23-02-2021 02-03-2021 02-03-2021 02-03-2021 03:30 PM Active View
22. Tender Designing Supplying and fixing of Soft Starter with provision of 400 Amps Change over switch Star Delta Starter for Ventilation fan operation(ELECT/MUN/20-21/2005, 20.02.2021) 20-02-2021 02-03-2021 02-03-2021 02-03-2021 04:00 PM Active View
23. Purchase of Drilling Accessories for face drilling and cable bolting operation for Electro-Hydraulic Crawler Drill Machines.(WE-91 e-Tender MOIL/20-21/ET-321 Dt.20.02.2021) 20-02-2021 15-03-2021 15-03-2021 16-03-2021 03:30 PM Active View
24. Supply of Timber (As per Annexure - C Enclosed) (23 Lots) (Only Through e-procurement)(WE-84(ET-320) DT.19/02/2021) 19-02-2021 09-03-2021 09-03-2021 10-03-2021 03:30 PM Active View
25. TENDER DOCUMENTS FOR PROVIDING ELECTRO PNEUMATIC GATE LOCK SYSTEM FOR PRODUCTION SHAFT AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/20-21/1199) 18-02-2021 25-02-2021 25-02-2021 25-02-2021 03:30 PM Active View
26. Cleaning and sorting of ROM recovered from Pit No.5 and 6 at Sitapatore Mine(MOIL/20-21/ET/304) 18-02-2021 18-03-2021 18-03-2021 18-03-2021 03:30 PM Active View
27. Washing picking and collection of material from waste reject crude from West side of 6 B section at Tirodi Mine(MOIL/20-21/ET/303) 18-02-2021 18-03-2021 18-03-2021 18-03-2021 03:30 PM Active View
28. Purchase of furniture and desk bench and soprts items at RNT school Balaghat Mine(PUR/PERS/BGT/AGT/1246 date 16.02.2021) 17-02-2021 26-02-2021 26-02-2021 26-02-2021 04:30 PM Active View
29. Underground development at -130 Level and -230 Level for preparing a block for long hole mining at Munsar Mine(MOIL/20-21/ET/316) 17-02-2021 17-03-2021 17-03-2021 17-03-2021 03:30 PM Active View
30. Making of stemming material Mud plug used for blasting at Kandri Mine(MOIL/20-21/ET/306) 17-02-2021 17-03-2021 17-03-2021 17-03-2021 03:30 PM Active View
31. Cleaning of surplus underground ROM at Munsar Mine(MOIL/20-21/ET/301) 16-02-2021 16-03-2021 16-03-2021 16-03-2021 03:30 PM Active View
32. Cleaning of surplus underground ROM at Munsar Mine(MOIL/20-21/ET/302) 16-02-2021 16-03-2021 16-03-2021 16-03-2021 03:30 PM Active View
33. Picking, sizing, sorting and screening of 30 percent Mn GML-233 25 percent Mn GML-464 and 20 percent Mn GML-567 ore from subgrade mineral reject from Underground at Gumgaon Mine(MOIL/20-21/ET/300) 16-02-2021 18-03-2021 18-03-2021 18-03-2021 03:30 PM Active View
34. Providing of arrangement for water sprinkling along mine road at Munsar mine.(Munsar/SE/NIT/2020-21/3331 Date 15.02.2021) 15-02-2021 22-02-2021 22-02-2021 22-02-2021 04:30 PM Active View
35. Underground concreting of X-cut manways and chute installation between Ch.37 to Ch.41 at -300 Level in Gumgaon Mine(MOIL/20-21/ET/298) 15-02-2021 17-03-2021 17-03-2021 17-03-2021 03:30 PM Active View
36. Ore Drive Development on R and D basis at -70 Level of Chikla B inclines section at Chikla Mine(MOIL/20-21/ET/299) 15-02-2021 17-03-2021 17-03-2021 17-03-2021 03:30 PM Active View
37. Underground winzing from -200 Level to -300 Level at Gumgaon Mine(MOIL/20-21/ET/297) 15-02-2021 17-03-2021 17-03-2021 17-03-2021 03:30 PM Active View
38. Errection of 3ph 5wire LT overhead line for officrs colony at kandri mine(KD/ELECT/20-21/4613) 13-02-2021 01-03-2021 01-03-2021 01-03-2021 04:30 PM Active View
39. Fabrication and fitting of Inset Gate , Side Fencing and inset Safety canopy at every inset i.e. 8th L, 9th L, 10th L,11th L ,12 L and 13.5 L of production shaft.(AGENT/BGT/MECH/PS/20-21/1220) 12-02-2021 19-02-2021 19-02-2021 19-02-2021 04:30 PM Active View
40. Procurement of Siemens Sinamics AOP30 for Winder Panel Chikla Mine.(CH/ELECT/20-21/1397) 10-02-2021 03-03-2021 03-03-2021 03-03-2021 04:30 PM Active View
41. Fabrication of Measuring Frames size 16 cft-50 nos for DB Mine.(DB/MECH/20-21/JGM(MECH)/1395) 10-02-2021 25-03-2021 25-03-2021 25-03-2021 04:30 PM Active View
42. UNLOADING, LOADING, STACKING AND MATERIALS HANDLING CHARGES FOR CHIKLA MINE STORE(TE-15 Dt.10022021) 10-02-2021 16-02-2021 16-02-2021 16-02-2021 04:30 PM Active View
43. Tender enquiry in single bid system for Shifting of DTH machine from one place to other place at different level(TE-30 DT.08022021) 09-02-2021 15-02-2021 15-02-2021 15-02-2021 04:30 PM Active View
44. Installation of MPBX (Mechanical Type) at Chikla Mine(TE-24 Dt.09022021) 09-02-2021 01-03-2021 01-03-2021 01-03-2021 04:30 PM Active View
45. e-procurement of C.I.Gate, Foot and N R Valves(PUR/MOIL/C-1/202/WE-109/ET/319) 08-02-2021 01-03-2021 01-03-2021 02-03-2021 03:30 PM Active View
46. Outsourcing of Operation and Maintenance of 1 No ElectroHydraulic Universal Drill Machine UDM601,1No SDL BL10C-CRD at -370L and 1No.LHD at 470L underground at Chikla Mine for the period of Two Years (24 Months)(MOIL/20-21/ET/230) 08-02-2021 12-03-2021 12-03-2021 12-03-2021 03:30 PM Active View
47. Upgradation of existing water supply scheme at Balaghat Mine(MOIL/20-21/ET/286) 08-02-2021 22-03-2021 22-03-2021 22-03-2021 03:30 PM Active View
48. Procurement of 1 No. Special purpose CTD Rod turning machine at Balaghat Mine.(PUR/MOIL/BGT/TURNING MACHINE /20-21/1192) 06-02-2021 26-02-2021 26-02-2021 26-02-2021 04:30 PM Active View
49. Construction of RCC supporting wall in headgear platform for 1st vertical shaft at Chikla Mine(MOIL/20-21/ET/270) 06-02-2021 08-03-2021 08-03-2021 08-03-2021 03:30 PM Active View
50. Hiring of architect for Construction of new guest house at Nagpur(MOIL/20-21/ET/269) 06-02-2021 12-03-2021 12-03-2021 12-03-2021 03:30 PM Active View
51. Construction of effluent treatment plant at Chikla Mine.(MOIL/20-21/ET/271) 06-02-2021 08-03-2021 08-03-2021 08-03-2021 03:30 PM Active View
52. Construction of shed over new leaching vessel at EMD plant Dongri Buzurg Mine(MOIL/20-21/ET/272) 06-02-2021 08-03-2021 08-03-2021 08-03-2021 03:30 PM Active View
53. Geo-technical investigation work for proposed 1x18 MVA ferro alloy plant at Gumgaon Mine(MOIL/20-21/ET/274) 06-02-2021 08-03-2021 08-03-2021 08-03-2021 03:30 PM Active View
54. Maintenance and operation of water supply scheme at Ukwa Mine.(MOIL/20-21/ET/283) 06-02-2021 08-03-2021 08-03-2021 08-03-2021 03:30 PM Active View
55. Maintenance and operation of drinking water supply scheme at Chikla Mine(MOIL/20-21/ET/273) 06-02-2021 08-03-2021 08-03-2021 08-03-2021 03:30 PM Active View
56. Construction of Precast / Prestressed boundary wall with concentina coil around Mine lease area at Gumgaon Mine(MOIL/20-21/ET/288) 06-02-2021 12-03-2021 12-03-2021 12-03-2021 03:30 PM Active View
57. Purchase of Electrical HT/LT Cables (Assorted Sizes) for Various Mines (Only Through e-procurement)(WE-90(ET/318) DT.06/02/2021) 06-02-2021 08-03-2021 08-03-2021 09-03-2021 03:30 PM Active View
58. e-procurement of Inner Harness(PUR/MOIL/C-1/190/WE-108/ET/317) 05-02-2021 25-02-2021 25-02-2021 26-02-2021 03:30 PM Active View
59. e-procurement of Safety Goggles - 2 items(PUR/MOIL/C-1/190/WE-107/ET/309) 05-02-2021 25-02-2021 25-02-2021 26-02-2021 03:30 PM Active View
60. Tender enquiry in single bid system for providing and fixing of safety appliances in vehicles and HEMMS at Chikla mine(TE-28 DT.03022021) 04-02-2021 13-02-2021 13-02-2021 13-02-2021 03:30 PM Active View
61. Strengthening of security for Railway Weigh Bridge at Balaghat Mine(MOIL/20-21/ET/290) 04-02-2021 03-03-2021 03-03-2021 03-03-2021 03:30 PM Active View
62. e-Procurement of Fluorescent Jacket(PUR/MOIL/C-1/190/WE-106/ET/308) 04-02-2021 22-02-2021 22-02-2021 23-02-2021 03:30 PM Active View
63. Supply of Timber (as per Annexure C Enclosed) (23 Lots).(WE-84(ET/307) DT.04/02/2021) 04-02-2021 25-02-2021 25-02-2021 26-02-2021 03:30 PM Active View
64. Repairing of Double Helical/Herringbone Gear of Production Shaft Winder-550HP at Balaghat Mine.(AGENT/BGT/MECH/PS/20-21/1185) 03-02-2021 16-02-2021 16-02-2021 16-02-2021 04:30 PM Active View
65. Repairing of Intermediate Spur Gear of Production Shaft Winder550HP at Balaghat Mine.(AGENT/BGT/MECH/PS/20-21/1184) 03-02-2021 16-02-2021 16-02-2021 16-02-2021 04:30 PM Active View
66. Reshaping/Teeth cutting of Output Spur Gear of winding Engine of Production Shaft Winder-550HP at Balaghat Mine.(AGENT/BGT/MECH/PS/20-21/1186) 03-02-2021 16-02-2021 16-02-2021 16-02-2021 04:30 PM Active View
67. Hiring of Taxi Services for MOIL H.O. Nagpur(MOIL/20-21/ET/296) 03-02-2021 02-03-2021 02-03-2021 02-03-2021 03:30 PM Active View
68. Picking and collection of UKL-448 25 percent and UKL-471 20 percent from Ch.1500 to Ch.2200 F W old sub grade mineralized area of Ukwa Mine(MOIL/20-21/ET/281) 03-02-2021 03-03-2021 03-03-2021 03-03-2021 03:30 PM Active View
69. Picking and collection of UKL-448 25 percent and UKL-471 20 percent from Ch.1000 to Ch.1500 F W old sub grade mineralised area of Ukwa Mine(MOIL/20-21/ET/282) 03-02-2021 03-03-2021 03-03-2021 03-03-2021 03:30 PM Active View
70. Tender enquiry in Single bid system Proposal for repairing of Track components for SDL of 4th level underground of Chikla mine(TE-25 DT_01022021) 02-02-2021 15-02-2021 15-02-2021 15-02-2021 03:30 PM Active View
71. Construction of operator cabin for automation of pumping operation at Kandri Mine(KAN/CIVIL/NIT/20-21/4454 DT 01.02.2021) 02-02-2021 10-02-2021 10-02-2021 10-02-2021 04:30 PM Active View
72. Tender enquiry in Single bid system Proposal for Laying of Tramline of 30Lbs rail in underground 1st and 2nd Vertical shaft at Chikla mine(TE-26 DT_01022021) 02-02-2021 13-02-2021 13-02-2021 13-02-2021 03:30 PM Active View
73. Making of stemming sticks Mud Plug used for blasting at Gumgaon Mine(MOIL/20-21/ET/294) 02-02-2021 02-03-2021 02-03-2021 02-03-2021 03:30 PM Active View
74. Drilling of cable bolt holes machine shifting rope handling jamming and grouting at Kandri Mine(MOIL/20-21/ET/295) 02-02-2021 02-03-2021 02-03-2021 02-03-2021 03:30 PM Active View
75. Outsourcing of sand stowing plant operation of Gumgaon Mine(MOIL/20-21/ET/293) 02-02-2021 02-03-2021 02-03-2021 02-03-2021 03:30 PM Active View
76. Operation of Pumps for Drinking Water Supply at Beldongri Mine(Civil/Bel/2020-21/2364) 01-02-2021 15-02-2021 15-02-2021 15-02-2021 04:30 PM Active View
77. Trench cutting in ore stacks at Tirodi Mine(MOIL/20-21/ET/280) 01-02-2021 01-03-2021 01-03-2021 01-03-2021 03:30 PM Active View
78. Muffling for blasting at 5 No. and 6 No. Pit at Sitapatore Mine(MOIL/20-21/ET/292) 01-02-2021 01-03-2021 01-03-2021 01-03-2021 03:30 PM Active View
79. Loading of crude ore into tipper manually from different working sections to jig section of TIrodi Mine(MOIL/20-21/ET/291) 01-02-2021 01-03-2021 01-03-2021 01-03-2021 03:30 PM Active View
80. Repairing of Swing Device Assy. of Tata Hitachi 450-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1347) 30-01-2021 25-02-2021 25-02-2021 25-02-2021 04:30 PM Active View
81. Reduction of Manganese Ore on Conversion Basis for EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET/265) 30-01-2021 01-03-2021 01-03-2021 01-03-2021 03:30 PM Active View
82. Fabrication of Butterfly Valve Diaphragm along with the Spline Shaft of Air Pulsating Jig of IMB Plant of Balaghat Mine(AGT/BGT/MECH/IMB/20-21/1160) 28-01-2021 15-02-2021 15-02-2021 15-02-2021 04:30 PM Active View
83. Manufacturing of Pneumatic Actuators Valves of Air Pulsating Jig for I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/20-21/1161) 28-01-2021 15-02-2021 15-02-2021 15-02-2021 04:30 PM Active View
84. Obtaining renewal of Final Forest Clearance from Regional Office, MoEF and CC, Nagpur over an area of 15.61 Ha in Village Tegai (Gumgaon Mine), Tahsil Saoner, Dist Nagpur(MOIL/20-21/ET/264) 28-01-2021 26-02-2021 26-02-2021 26-02-2021 03:30 PM Active View
85. Concreting at 1750Underground Level at Ukwa Mine(Concreting at 1750Underground Level at Ukwa Mine) 28-01-2021 04-02-2021 04-02-2021 04-02-2021 04:30 PM Active View
86. Pushing unloading of turbs in U/G and surface at vertical section at Ukwa Mine.(AGT/Min/UK/LT/20-21/1158) 28-01-2021 04-02-2021 04-02-2021 04-02-2021 04:30 PM Active View
87. PURCHASE OF SAP FLM LICENS(PUR/MOIL/C-4/138/E-41/522-M DT.28/01/2021) 28-01-2021 12-02-2021 12-02-2021 12-02-2021 03:30 PM Active View
88. Making and Supplying of stemming sticks material used for blasing inundergound at working levels at Balaghat Mine(MIN/BGT/AGT/LT/20-21/ dt 25.01.2021) 27-01-2021 04-02-2021 04-02-2021 04-02-2021 04:30 PM Active View
89. e-procurement of Ear Plug and Ear Muff(PUR/MOIL/C-1/190/WE-105/ET/289) 27-01-2021 15-02-2021 15-02-2021 16-02-2021 03:30 PM Active View
90. lowering of 240 Sqmm LT Cable through winch from top to 1st level at Munsar Mine(ELECT/MUN/ADGM/20-21/1852, Dated - 24.01.2020) 25-01-2021 01-02-2021 01-02-2021 01-02-2021 03:30 PM Active View
91. Construction of Cable Trench for newly constructed Electrical Substation Building and Winder House for 2nd Vertical Shaft at Munsar Mine(Munsar/Civil/NIT/2020-21/202 Date 23.01.2021) 25-01-2021 30-01-2021 30-01-2021 30-01-2021 04:30 PM Active View
92. Filling the area around New Hospital building at Kandri Mine.(KAN/CIVIL/NIT/20-21/4357 DT 24.01.2021) 25-01-2021 02-02-2021 02-02-2021 02-02-2021 04:30 PM Active View
93. Proposal for Unloading, Loading, Stacking, Arranging and Material Handling Charges at Mine Stores Chikla Mine(TE-15 Dt 23012021) 23-01-2021 30-01-2021 30-01-2021 30-01-2021 03:30 PM Active View
94. General Daily Maintenance of TATA1200-3,Drill Machine ICM260,D155-4 Dozer,Dumpers and Light Vehicle.(DB/MECH/20-21/)/1319) 22-01-2021 30-01-2021 30-01-2021 30-01-2021 04:30 PM Active View
95. Renovation of Production Shaft by replacing Guide Rails at Balaghat Mine(MOIL/20-21/ET/235) 22-01-2021 26-02-2021 26-02-2021 26-02-2021 03:30 PM Active View
96. Purchase of LT Panels - 38 Lots. For Various Mines.(WE-88 DT.22.01.2021 (e-Tender no.MOIL/20-21/ET/287) 22-01-2021 18-02-2021 18-02-2021 19-02-2021 03:30 PM Active View
97. Water proofing to slab of Mine Manager Bungalow at Ukwa Mine(Civil/UK/LT/20-21/2198 Date- 16.01.2021) 21-01-2021 30-01-2021 30-01-2021 30-01-2021 04:30 PM Active View
98. Loading Transportation and unloading of Manganese Ore at Beldongri Mine(Bel/Min/NIT/20-21/2418) 21-01-2021 01-02-2021 01-02-2021 01-02-2021 04:30 PM Active View
99. In House Maintenance of Rest House, Canteen and Recreation Hall at Gumgaon Mine(GUM/Civil/NIT.20-21/1902 19.01.2021) 20-01-2021 27-01-2021 27-01-2021 27-01-2021 04:30 PM Active View
100. NDT of Vital Components of Vertical Shaft Cage Winder-250HP at Gumgaon Mine.(AGENT/GUM/MECH/NDT/20-21/1812) 19-01-2021 02-02-2021 02-02-2021 02-02-2021 04:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.