Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Supply of Multi Axis Controller Joystick equivalent to V11(ELECT/MUN/ADGM/21-22/1063, Dated - 08.10.2021) 09-10-2021 22-10-2021 22-10-2021 22-10-2021 04:30 PM Active View
2. PURCHASE OF 1200mm SWEEP CEILING FAN NOS.100, FOR BALAGHAT MINE(GT/TE/ELECT/AJGM/21-22/910) 07-10-2021 13-10-2021 13-10-2021 13-10-2021 03:30 PM Active View
3. Fabrication of Butterfly Valve Diaphragm-3nos along with the Spline Shaft of Air Pulsating Jig of IMB Plant of Balaghat Mine.(AGT/BGT/MECH/IMB/21-22/907) 06-10-2021 05-11-2021 05-11-2021 05-11-2021 04:30 PM Active View
4. Monthly Maintenance Contract for Cap Lamp and cap lamp racks of Munsar Mine for 118 Day(ELECT/MUN/ADGM/21-22/1030, Dated - 01.10.2021) 06-10-2021 13-10-2021 13-10-2021 13-10-2021 03:30 PM Active View
5. Cleaning works, painting works and other miscellaneous preparatory works for Durga Stage Bhuvaneshwari Temple New 220 A Type Quarters colony Rantoli area ahead of Durga Pooja at Dongri Buzurg Mine(DB/CIVIL/21-22/1997) 06-10-2021 07-10-2021 07-10-2021 07-10-2021 04:30 Pm Active View
6. Slab Water Proofing Works for New Medical Administrative Building of Kandri Mine.(KAN/CIVIL/NIT/21-22/2092 DT 05.10.2021) 05-10-2021 12-10-2021 12-10-2021 12-10-2021 04:30 PM Active View
7. Outsourcing of distribution Collection and Cleaning of cap lamps of Kandri Mines for a period of 3 months(KD/ELECT/ 21-22/2075) 04-10-2021 18-10-2021 18-10-2021 18-10-2021 04:30 PM Active View
8. Cleaning and Collection Waste from Septic Tanks, Chambers in Camp Colony at Kandri Mine.(KD/PER/NIT/2021-22/2000) 01-10-2021 15-10-2021 15-10-2021 15-10-2021 04:30 PM Active View
9. PURCHASE OF SOLID TYRE 10.00 X 20-4nos., MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD (Loader) MACHINE IN UNDREGROUND OF BALAGHAT MINE.(PUR/MOIL/BGT/SolTyre/21-22/845) 30-09-2021 08-10-2021 08-10-2021 08-10-2021 04:30 PM Active View
10. Construction of foundation and Fabrication of new gear box of Ruby winder at Balaghat Mine(MOIL/21-22/ET/71) 30-09-2021 20-10-2021 20-10-2021 20-10-2021 03:30 PM Active View
11. Providing and fixing supporting structures for solar panel at Directors Bungalow at MOIL, Nagpur(MOIL/21-22/ET/72) 30-09-2021 20-10-2021 20-10-2021 20-10-2021 03:30 PM Active View
12. Annual repairs to camp quarters at Kandri Mine(MOIL/21-22/ET/69) 30-09-2021 01-11-2021 01-11-2021 01-11-2021 03:30 PM Active View
13. Cleaning and collection of Garbage and cleaning of Drain at Kandri Mine.(KD/PERS/NIT/2021-22/ 1999) 29-09-2021 15-10-2021 15-10-2021 15-10-2021 04:30 PM Active View
14. WEBSITE SINGLE/ PROPRIETORY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR 40 TON HYDRAULIC PRESS AND VIBRATING CUP MILL(PUR/MOIL/C-3/43/E-55/114-M Dt. 28/09/2021) 29-09-2021 11-10-2021 11-10-2021 11-10-2021 03:30 PM Active View
15. PURCHASE OF SOLID TYRE 10.00X20-2nos.,MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD(Loader) MACHINE IN UNDERGROUND OF BALAGHAT MINE.(PUR/MOIL/BGT/Soltyre/21-22/840) 28-09-2021 07-10-2021 07-10-2021 07-10-2021 04:30 PM Active View
16. Procurement of 3 Nos of Restricted Neutral Earthing at Chikla Mine for 1000KVA Transformer(CH/ELECT/21-22/949) 28-09-2021 09-10-2021 09-10-2021 09-10-2021 04:30 PM Active View
17. Providing 6 mbps 1 is to 1 Internet Leased Line at Munsar Mine(AJGM/Group-III/SYS /NW/2021-22/2001) 28-09-2021 05-10-2021 05-10-2021 05-10-2021 04:30 PM Active View
18. Handling of ore tolley work at Kandri Mine(KD/mines/NIT/21-22/1745 dated 26.09.2021) 28-09-2021 11-10-2021 11-10-2021 11-10-2021 04:30 PM Active View
19. PURCHASE OF SPARES FOR EXIDE MAKE LED CAP LAMPS(PUR/MOIL/C-3/615/E-54/109-M Dt.23/09/2021) 24-09-2021 13-10-2021 13-10-2021 13-10-2021 03:30 PM Active View
20. In House Maintenance of Rest House, Canteen and Recreation Hall at Gumgaon Mine.(Agent/GUM/PER/NIT/21-22/1231, 21/09/2021) 23-09-2021 30-09-2021 30-09-2021 30-09-2021 04:30 PM Active View
21. Production of 25 percent Mn. SM Grade ore (BGL-523) from U/G old sub grade mineral rejects material at Balaghat Mine(MINING/BGT/AGT/LT/2021-22/823 dt21.09.2021) 21-09-2021 30-09-2021 30-09-2021 30-09-2021 04:30 PM Active View
22. Development and beatification of garden at New Medical Administrative Building at Gumgaon Mine.(MM/GUM/Civil/LT/21-22/1219 18.09.2021) 20-09-2021 29-09-2021 29-09-2021 29-09-2021 04:30 PM Active View
23. Removal of Waste rock by mechanical means JCB Back loader at Chitaver near ch 12000 section at Ukwa Mine(AGT/Min/UK/LT/21-22/800 Date- 16.09.2021) 20-09-2021 28-09-2021 28-09-2021 28-09-2021 04:30 PM Active View
24. Outsourcing of distribution, Collection and Cleaning of cap lamps of Chikla Mines for a period of 3 months(CH/ELECT/21-22/903) 18-09-2021 28-09-2021 28-09-2021 28-09-2021 04:30 PM Active View
25. Providing and fixing chainlink fencing and paving block floor at Diesel pump area at Dongri Buzurg Mine(DB/CIVIL/2021-22/1960 Date 16.09.2021) 18-09-2021 24-09-2021 24-09-2021 24-09-2021 04:30 PM Active View
26. TENDER INVITING IN SINGLE BID SYSTEM FOR UNLOADING, LOADING, STACKING AND MATERIALS HANDLING FOR CHIKLA MINE STORE(PUR/MOIL/CH/MECH/21-22/902) 18-09-2021 29-09-2021 29-09-2021 29-09-2021 04:30 PM Active View
27. Tender inviting in single bid system for the work of Security Guards for Diamond Drill Machine site at Chikla Mine(TE-898 DT-16092021) 16-09-2021 24-09-2021 24-09-2021 24-09-2021 04:30 PM Active View
28. Procurement of AVA Alarms and miscellaneous items for Underground machines at Chikla Mine(CH/ELECT/21-22/901) 16-09-2021 25-09-2021 25-09-2021 25-09-2021 04:30 PM Active View
29. OUTSOURCING OF MAINTENANCE, DISTRIBUTION AND COLLECTION OF CAPLAMP FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/792) 15-09-2021 16-09-2021 16-09-2021 16-09-2021 12:00 PM Active View
30. Purchase of Miscellaneous items, Welding , Emery Tape, White Chindi , Grinding Wheel etc. for Gr-I Balaghat Mine(PUR/MOIL/BGT/C CLASS/21-22/791) 15-09-2021 07-10-2021 07-10-2021 07-10-2021 04:30 PM Active View
31. Loading Unloading Stacking of Various material at Dongri Buzurg Mine Store through Contractor Workers for the period of 10 Month in Two Bid(DB/Store Loading Unloading/21-22/893) 15-09-2021 29-09-2021 29-09-2021 29-09-2021 04:30 PM Active View
32. Drilling of bore hole and fixing of casing pipe for lowering of electrical cable from surface to st level U/G(KD/Civil/NIT/21-22/1855 dated 13.09.2021) 15-09-2021 24-09-2021 24-09-2021 24-09-2021 04:30 PM Active View
33. Dismantling of roof of the old staff quarter at Kandri MIne .(Dismantling of roof of the old staff quarter havin) 15-09-2021 24-09-2021 24-09-2021 24-09-2021 04:30 PM Active View
34. Laying of HDPE pipeline (OD 280 mm) for high head slurry pump at D.B. Mine for monsoon dewatering work.(DB/MECH/21-22/879) 13-09-2021 18-09-2021 18-09-2021 18-09-2021 04:30 PM Active View
35. TENDER ENQUIRY IN SINGLE BID SYSTEM FOR TRANSPORT OF EXPLOSIVE DETONATOR FROM PWD ROAD TO CHIKLA MINE MAGAZINE AT CHIKLA MINE(TE-419 DT.13092021) 13-09-2021 20-09-2021 20-09-2021 20-09-2021 04:30 PM Active View
36. Fabrication of Pneumatic Actuators Valves of Air Pulsating Jig for I.M.B Plant at Balaghat Mine.(AGT/BGT/MECH/IMB/21-22/771) 11-09-2021 06-10-2021 06-10-2021 06-10-2021 04:30 PM Active View
37. Fabrication of 24Nos. of Wheel Axle Shaft Of G.B. car deployed in underground at Balaghat Mine.(AGT/BGT/MECH/GB-CAR/21-22/770) 10-09-2021 24-09-2021 24-09-2021 24-09-2021 04:30 PM Active View
38. 10 Mbps Internet Lease Line MOIL LTD Ukwa Mine(BGT/SYS/INTERNET/2020-22/766) 09-09-2021 20-09-2021 20-09-2021 20-09-2021 03:30 PM Active View
39. Annual repairs to camp quarters at Chikla Mine (MOIL/21-22/ET/65) 07-09-2021 06-10-2021 06-10-2021 06-10-2021 3:30 PM Active View
40. Construction of retaining wall, floor and drainage system near new installed screening plant and construction of biomatric attendance room near pit office and BDC at Kandri Mine (MOIL/21-22/ET/66) 07-09-2021 06-10-2021 06-10-2021 06-10-2021 3:30 PM Active View
41. Drilling of bore with installation of pump, laying pipeline network and construction of pump house for supply of drinking water for dry seperation unit and guest house at Munsar Mine. (MOIL/21-22/ET/67) 07-09-2021 06-10-2021 06-10-2021 06-10-2021 3:30 PM Active View
42. Annual repairs to camp quarters at Tirodi Mine. (MOIL/21-22/ET/68) 07-09-2021 06-10-2021 06-10-2021 06-10-2021 3:30 PM Active View
43. Repairing of 80MT Road Weighbridge operating at dongribuzurg mine (MOIL/DB/MECH/2021-2022/830) 04-09-2021 15-09-2021 15-09-2021 15-09-2021 4:30 Active View
44. PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR 800KVA, 3.3KV/433V TRANSFORMERS FOR BALAGHAT MINE (BGT/TE/ELECT/AJGM/21-22/736) 03-09-2021 08-09-2021 08-09-2021 08-09-2021 3:30 PM Active View
45. Rehandling of Manganese Ore at Railway Siding at Dongri Buzurg Mine. (DB/Mining/2021-22/807 Date 08.08.2021) 03-09-2021 08-09-2021 08-09-2021 08-09-2021 4:30 PM Active View
46. PROCUREMENT OF RESIN CAST 11 KV GRADE CT 60/5 A AS PER ANNEXURE A(PUR/MOIL/BEL/2021-22/1261) 02-09-2021 10-09-2021 10-09-2021 10-09-2021 04:30 PM Active View
47. CS WHEEL ASSEMBLY WITH COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(PUR/MOIL/BGT/GB CAR/21-22/732) 01-09-2021 15-09-2021 15-09-2021 15-09-2021 04:30 PM Active View
48. Supply(PUR/MOIL/CH/C CLASS/Nut and Bolts/21-22/818) 01-09-2021 04-10-2021 04-10-2021 04-10-2021 04:30 PM Active View
49. OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/731) 01-09-2021 03-09-2021 03-09-2021 03-09-2021 03:30 PM Active View
50. Pushing and pulling of empty loaded tubs rock tubs in to from cage at pit top and and incline top and tipping the loaded tubs at OCF Gala tipping point(BEL/MIN/2021-22/1272) 01-09-2021 07-09-2021 07-09-2021 07-09-2021 04:30 PM Active View
51. Purchase of black Gitti for UG concreting at Kandri Mine(KD/MINES/NIT/2021-22/ 1666) 31-08-2021 15-09-2021 15-09-2021 15-09-2021 04:30 PM Active View
52. Complete Survey, estimation of 3D Subsidence parameter and 3D Numerical Modelling of Subsidence parameters at Beldongri Mine of MOIL over an area of 26.66 Ha. and 12.99 Ha(MOIL/21-22/ET/44) 30-08-2021 30-09-2021 30-09-2021 30-09-2021 03:30 PM Active View
53. Cutting and cleaning of grass shrub Bushes at Officer Colony Babu line Syndicate Camp and Chandmara Colony at Dongri Buzurg Mine(DB/CIVIL/21-22/1725 dt 26.08.2021) 29-08-2021 07-09-2021 07-09-2021 07-09-2021 04:30 PM Active View
54. Providing and installation of tyre washer system at Chikla Mine(CIVIL/CH/T.E./21-22/1803) 28-08-2021 13-09-2021 13-09-2021 13-09-2021 04:30 PM Active View
55. Production of 25 percentMn. SM Grade ore (BGL-523) from U/G old sub grade mineral rejects material at Balaghat Mine(MINING/BGT/LT/AGT/21-22/717 DT. 26.08.2021) 27-08-2021 02-09-2021 02-09-2021 02-09-2021 04:30 PM Active View
56. REQUEST FOR EXPRESSION OF INTEREST FOR THE TRANSFER OF TECHNOLOGY FOR PRODUCTION OF ELECTROLYTIC MANGANESE METAL EMM AND OR DESIGN AND CONSTRUCTION OF A NEW ELECTROLYTIC MANGANESE METAL EMM PLANT.(SMG/EMM-EOI/21-22/01) 26-08-2021 15-11-2021 15-11-2021 15-11-2021 3:00 PM Active View
57. INSTALLATION OF ESE TYPE LIGHTING ARRESTOR FOR 33KV OUTDOOR SUBSTATION AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/704) 25-08-2021 31-08-2021 31-08-2021 31-08-2021 03:30 PM Active View
58. Repair of reduced Ore Shed at EMD Plant at DB Mine(DB/CIVIL/21-22/762 dt 21.08.2021) 25-08-2021 31-08-2021 31-08-2021 31-08-2021 04:30 PM Active View
59. C clas tender(PUR/MOIL/CH/C CLASS/21-22/783 Dt. 23.08.2021) 25-08-2021 25-09-2021 25-09-2021 25-09-2021 04:30 PM Active View
60. Collection of Garbage from camp colonies at Balaghat Mine(CIVI/BGT/LT/AGT/21-22/664 DT. 13/08/2021) 23-08-2021 30-08-2021 30-08-2021 30-08-2021 04:30 PM Active View
61. Cleaning of drain sewer line of camp colonies at Balaghat mine(CIVI/BGT/LT/AGT/21-22/669 DT. 17.08.2021) 23-08-2021 30-08-2021 30-08-2021 30-08-2021 04:30 PM Active View
62. Cleaning and shorting of surplus underground ROM at Ch 10000 BDC Section of Ukwa Mine(AGT/Min/UK/LT/21-22/ 678 Date 21.08.202) 23-08-2021 01-09-2021 01-09-2021 01-09-2021 04:30 PM Active View
63. 10 Mbps backup Internet Leased Line at BALAGHAT MINE(BGT/SYS/INTERNET/2021-22/677) 21-08-2021 06-09-2021 06-09-2021 06-09-2021 03:30 PM Active View
64. Repairing of Grouser shoe of BEML Dozer no-4 operating AT DONGRI BUZURG MINE(DB/MECH/21-22/JGM(MEC)/744) 20-08-2021 27-09-2021 27-09-2021 27-09-2021 04:30 PM Active View
65. WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR EIMCO ELECON MAKE SDL LHD UDM MACHINE(PUR/MOIL/C-5/ 27 /E- 53 / 90-M) 20-08-2021 09-09-2021 09-09-2021 13-09-2021 03:30 PM Active View
66. Construction of Guard Room at Mine Manager Bungalow at Ukwa Mine(Civil/UK/LT/21-22/951 Date- 16.08.2021) 19-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
67. Cleaning of accumulated sand form under ground at Kandri Mine(KD/mines/NIT/21-22/1530 dated 17.8.2021) 18-08-2021 27-08-2021 27-08-2021 27-08-2021 04:30 PM Active View
68. Maintenance and Operation of water Supply Scheme at Ukwa Mine(CIVIL/UK/LT/21-22/943) 17-08-2021 26-08-2021 26-08-2021 26-08-2021 04:30 PM Active View
69. PURCHASE OF C CLASS FASTENERS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-2 DT.16082021) 17-08-2021 04-09-2021 04-09-2021 04-09-2021 04:30 PM Active View
70. PURCHASE OF C CLASS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-3 DT.17082021) 17-08-2021 06-09-2021 06-09-2021 06-09-2021 04:30 PM Active View
71. PURCHASE OF C CLASS PIPE FITTINGS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-1 DT.16082021) 17-08-2021 03-09-2021 03-09-2021 03-09-2021 04:30 PM Active View
72. Construction of Cycle stand near IInd vertical shaft premises at Chikla Mine(CIVIL/CH/T.E./21-22/1634) 14-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
73. Purchasing of plants soil and fertilizer for new Afforestation for the year 2021 22 at Chikla Mine(CIVIL/CH/T.E./21-22/707) 14-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
74. Afforestation for the year 2021 22 at green belt jone thickness 7.5 M Width along lease boundary area at Chikla village in chikla mine(CIVIL/CH/T.E./21-22/702) 14-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
75. Afforestation for the year 2021 22 at green belt jone thickness 7.5 M Width along lease boundary area at Sitasoangi village in Chikla mine(CIVIL/CH/T.E./21-22/704) 14-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
76. Protection and Maintenance of plantation for New plantation 21 22 for three Months of security for plantation area green belt jone thickness 7.5 M Width along lease boundary area at Chikla Mine(CIVIL/CH/T.E./21-22/706) 14-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
77. TENDER DOCUMENTS FOR LOWERING OF 3C X 240 SQMM. CU. CABLE FROM 12TH LEVEL TO 13.5TH LEVEL AND 3C X 95 SQMM. CU. CABLE FROM 12TH LEVEL TO 15TH LEVEL AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/651) 13-08-2021 20-08-2021 20-08-2021 20-08-2021 03:30 PM Active View
78. Construction of Jaw Crusher Foundation in Nagara Plant at Ukwa Mine(AGT/CIVIL/UK/LT/21-22/632) 12-08-2021 19-08-2021 19-08-2021 19-08-2021 04:30 PM Active View
79. Waterproofing by means of laying torch shield on roof of old B and C type quarters at Kandri Mine.(KAN/CIVIL/NIT/21-22/1459 DT 10.08.2021) 10-08-2021 20-08-2021 20-08-2021 20-08-2021 04:30 PM Active View
80. Drilling of bore and fixing of Casing pipe for lowering electrical cable from surface to I st level of U/g for operating machinery at Kandri Mine.(KAN/CIVIL/NIT/21-22/1458 DT 10.08.2021) 10-08-2021 20-08-2021 20-08-2021 30-11--0001 04:30 PM Active View
81. Maintenance of Various gardens at Kandri Mine.(KAN/CIVIL/NIT/21-22/1435 DT 08.08.2021) 09-08-2021 17-08-2021 17-08-2021 17-08-2021 04:30 PM Active View
82. Operation of Pumps at Beldongri Mine(BL/MECH/21-22/ 1095) 09-08-2021 20-08-2021 20-08-2021 20-08-2021 04:30 PM Active View
83. Major Repairing of Tata Cummins Engine B5.9 180 20 model of Tata 4018 Trailer Moil Ltd Balaghat mine.(AGENT/BGT/MECH/MG/21-22/622) 09-08-2021 27-08-2021 27-08-2021 27-08-2021 04:30 PM Active View
84. PROCUREMENT OF OF CARRYING, IMPACT AND RETURN ROLLERS FOR CONVEYOR BELTS AT IMB PLANT OF BALAGHAT MINE.(PUR/MOIL/BGT/IMB/ROL/21-22/624) 09-08-2021 18-08-2021 18-08-2021 18-08-2021 04:30 PM Active View
85. PROCUREMENT OF COLD VULCANIZING SOLUTION AND HARDENER FOR CONVEYOR BELTS JOINING WORKS AT IMB PLANT BALAGHAT MINE.(PUR/MOIL/BGT/IMB/SOL/21-22/623) 09-08-2021 20-08-2021 20-08-2021 20-08-2021 04:30 PM Active View
86. FABRICATION OF GRIZZLY SEGEMENTS 8 NOS FOR IMB PLNAT AT DONGRI BUZURG MINE(DB/MECH/21-22/660) 08-08-2021 02-09-2021 02-09-2021 02-09-2021 04:30 PM Active View
87. Jigging washing and collection of reject ore from IMB Plant at Dongri Buzurg Mine(DB/SUR/21-22/1520) 07-08-2021 14-08-2021 14-08-2021 14-08-2021 03:30 PM Active View
88. Repairing Bucket Assy-6 nos of PC 450-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/21-22/JGM(MECH)/642) 03-08-2021 27-08-2021 27-08-2021 27-08-2021 04:30 PM Active View
89. Procurement of four numbers of SIEMENS Simatic ET 200SP Interface Modules for Chikla Mine(CH/ELECT/21-22/646) 03-08-2021 14-09-2021 14-09-2021 14-09-2021 04:30 PM Active View
90. Replacement of 6 mm/8mm/10 mm thick liner plates at 14.5 level loading station of Production shaft at Balaghat Mine(AGT/BGT/MECH/WIN/21-22/601) 02-08-2021 10-08-2021 10-08-2021 10-08-2021 04:30 PM Active View
91. Fabrication of 2 Nos of Vertical Brake Tie Rod for Holmes shaft Skip Winder at Balaghat Mine(AGENT/BGT/MECH/WIN/21-22/602) 02-08-2021 23-08-2021 23-08-2021 23-08-2021 04:30 PM Active View
92. Construction of first floor at new Medical Administrative Building along with site development work at MOIL Nagpur(MOIL/21-22/ET/57) 02-08-2021 03-09-2021 03-09-2021 03-09-2021 03:30 PM Active View
93. Construction of D.G.Set, Chimney foundation, switch and breaker room and shed over D.G.set at Balaghat Mine(MOIL/21-22/ET/56) 02-08-2021 01-09-2021 01-09-2021 01-09-2021 03:30 PM Active View
94. Laying of HDPE pipeline (OD-280 mm) for high head slurry pump at D.B.Mine for monsoon dewatering(MOIL/DB/MECH/2021-2022/628) 31-07-2021 10-08-2021 10-08-2021 10-08-2021 04:30 PM Active View
95. Supply of front caliper brake liners for BEML make BH60M dumper no 1 and no 2 Operating at Dongri Buzurg Mine(MOIL/PUR/DB/MECH/2021-2022/629) 31-07-2021 10-08-2021 10-08-2021 10-08-2021 04:30 PM Active View
96. e-procurement of ERW Steel Pipe(PUR/MOIL/C-1/197/WE-07/ET/64) 31-07-2021 06-08-2021 06-08-2021 06-08-2021 03:30 PM Active View
97. PURCHASE OF MISCELANEOUS ITEMS, WELDING ACCESSORIES , EMERY TAPE, WHITE CHINDI, GRINDING WHEEL ETC FOR GR-I BALAGHAT MINE(PUR/MOIL/BGT/ C CLASS/21-22/590) 29-07-2021 19-08-2021 19-08-2021 19-08-2021 04:30 PM Active View
98. Fabrication of Hose Fittings required in Underground at Balaghat Mine(AGT/BGT/MECH/HOSE FITTINGS/21-22/562) 28-07-2021 18-08-2021 18-08-2021 18-08-2021 04:30 PM Active View
99. PURCHASE OF SPARES FOR EIMCO ELECON MAKE SIDE DISCHARGE LOADER (SDL).(PUR/MOIL/C-5/ 27 /E- 52/ 72-M,Dt.27.07.2021) 27-07-2021 05-08-2021 05-08-2021 06-08-2021 03:30 PM Active View
100. PURCHASE OF SPARES FOR EIMCO ELECON MAKE SIDE DISCHARGE LOADER (SDL).(PUR/MOIL/C-5/ 27 /E- 52/ 72-M,Dt.27.07.2021) 27-07-2021 05-08-2021 05-08-2021 06-08-2021 03:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.