Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Procurement of 2500 Cu. Mtrs. of Dissolved Oxygen Gas Cylinders for the Balaghat Mine(PUR/BGT/OXY-CYL/24-25/615) | 25-07-2024 | 31-07-2024 | 31-07-2024 | 31-07-2024 | 04:30 PM | Active | View |
2. | Pick and Carry Hydraulic Mobile Crane as per IS 4573 (Old Generation Hydra Crane with Rear Mounted Cabin) (Q2) | 24-07-2024 | 14-08-2024 | 14-08-2024 | 14-08-2024 | 11:30:00 | Active | View |
3. | shifting of 11KV HT Overhead line near sand plant at Gumgaon Mine(GUM/ELECT/24-25/1182 Dt. 22.07.2024) | 23-07-2024 | 31-07-2024 | 31-07-2024 | 31-07-2024 | 04:30 PM | Active | View |
4. | Structural Audit and condition assessment (Structural Stability) of IMB Plant (Bunker, Crusher, Conveyors, Screen, Chute, hopper and other all structure) of Dongri Buzurg Mine.(DB/MECH/24-25/670) | 23-07-2024 | 27-07-2024 | 27-07-2024 | 27-07-2024 | 04:30 PM | Active | View |
5. | Limited Tender for Purchase of seal kit for hydraulic cylinders of Ferro Manganese Plant Balaghat Mine(TE MOIL AGT FMP MECH 2425/120 190724) | 23-07-2024 | 31-07-2024 | 31-07-2024 | 31-07-2024 | 04:30 PM | Active | View |
6. | Bid Number GEM/2024/B/5195299 Schedule no. 1 Headpiece Shell Assembly , Schedule no 2 LED Cap lamp Complete Cable Assembly , Schedule no. 3 Battery Pack , Schedule no. 4 5-Wire Connector , Schedule no. 5 LED Cap lamp Reflector Assembly , Schedule no. 6 Cable Kit | 23-07-2024 | 13-08-2024 | 13-08-2024 | 13-08-2024 | 01:30 PM | Active | View |
7. | Structure stability Test of Head gear of 2nd Vertical shaft at Chikla Mine.(CH/MECH/24-25/76-30884/73/652) | 22-07-2024 | 05-08-0224 | 05-08-2024 | 05-08-2024 | 04:30 PM | Active | View |
8. | Providing and fitting of digital speed and depth indicator in 50 HP Haulage engine of Chikla-B.(CH/MECH/24-25/76-31448/394/648) | 22-07-2024 | 29-07-2024 | 29-07-2024 | 29-07-2024 | 04:30 PM | Active | View |
9. | Fabrication and erection of 60 MT Storeage hopper for screening of Dump ore.(CH/MECH/24-25/76-31374/366/650) | 22-07-2024 | 30-07-2024 | 30-07-2024 | 30-07-2024 | 04:30 PM | Active | View |
10. | Supply of Industrial oxygen and DA Gas cylinder for Chikla Mine.(CH/MECH/24-25/4-37349/413/647) | 22-07-2024 | 06-08-2024 | 06-08-2024 | 06-08-2024 | 04:30 PM | Active | View |
11. | Strengthening of existing Keps assembly at pit top of Vertical Shaft at Gumgaon Mine(GM/MECH/24-25/1184) | 22-07-2024 | 12-08-2024 | 12-08-2024 | 12-08-2024 | 04:30 PM | Active | View |
12. | Online UPS(GEM/2024/B/5181965) | 20-07-2024 | 30-07-2024 | 30-07-2024 | 30-07-2024 | 01:30 PM | Active | View |
13. | Procurement of 01 No. of Submersible pump for Mine Dewatering at 2nd Vertical of Ukwa Mine.(AJGM/UK/MECH/2024-25/591) | 19-07-2024 | 25-07-2024 | 25-07-2024 | 25-07-2024 | 04:30 PM | Active | View |
14. | Construction of foundation Jaw Crusher at gumgaon Mine(LT/CIVIL/GUM/2024-25/1152) | 19-07-2024 | 01-08-2024 | 01-08-2024 | 01-08-2024 | 04:00 PM | Active | View |
15. | Transportation of bottom ash from khasala ash pond to sand stowing plant of Gumgaon Mine.(Agent/Gum/Min/24-25/599, Date 19.07.2024) | 19-07-2024 | 29-07-2024 | 29-07-2024 | 29-07-2024 | 04:30 PM | Active | View |
16. | EXTRA EXCAVATION IN 2ND LEVEL AT MUNSAR MINE(MUN/TENDER/24-25/596) | 19-07-2024 | 24-07-2024 | 24-07-2024 | 24-07-2024 | 04:30 PM | Active | View |
17. | Transportation of segment from Holmes Shaft at 10th Level to 9th Level and 8th Level at Balaghat Mine(MINING/BGT/LTE/24-25/587 Dated 18.07.2024) | 18-07-2024 | 25-07-2024 | 25-07-2024 | 25-07-2024 | 04:30 PM | Active | View |
18. | SUPPLY OF SWCL G5U UHF DELICENSED WALKIE TALKIE SET WITH ALL ACCESSORIES(PUR/MOIL/TD01/ELEC/2024-25/575) | 18-07-2024 | 27-07-2024 | 27-07-2024 | 27-07-2024 | 03:30 PM | Active | View |
19. | Cleaning of sand accumulated in haulage road of 1850L at Ukwa Mine.(AGT/MINING/UK/LT/2024-25/588 Dt. 18.07.2024) | 18-07-2024 | 25-07-2024 | 25-07-2024 | 25-07-2024 | 04:30 PM | Active | View |
20. | Drain cleaning at 1650 L 1st vertical at Ukwa Mine.(AGT/MINING/UK/LT/2024-25/589 Date-18.07.2024) | 18-07-2024 | 25-07-2024 | 25-07-2024 | 25-07-2024 | 04:30 PM | Active | View |
21. | Miscellaneous concreting at Ch11800 incline at Ukwa Mine.(AGT/MINING/UK/LT/2024-25/590 Date-18.07.2024) | 18-07-2024 | 25-07-2024 | 25-07-2024 | 25-07-2024 | 04:30 PM | Active | View |
22. | Industrial and Protective Rubber Gumboot as per IS 5557 (GEM/2024/B/5175108) | 18-07-2024 | 16-08-2024 | 16-08-2024 | 16-08-2024 | 12:30 PM | Active | View |
23. | Purchase of 2 Nos ,Vibratory Motors for Chikla Mine(AGENT/GR-II/ELECT/24-25/625 DATE 14/07/2024) | 16-07-2024 | 24-07-2024 | 24-07-2024 | 24-07-2024 | 04:30 PM | Active | View |
24. | Purchase of Shell Corena S3 R46 Compressor oil for FRD DCR 20 DRILLING MACHINE(PUR/MOIL/AGT/DB/2024-25/615) | 15-07-2024 | 30-07-2024 | 30-07-2024 | 30-07-2024 | 04:30 PM | Active | View |
25. | Purchase of Filters of Engine for FRD DCR 20 DRILLING MACHINE(PUR/MOIL/AGT/DB/2024-25/620) | 15-07-2024 | 31-07-2024 | 31-07-2024 | 31-07-2024 | 04:30 PM | Active | View |
26. | Purchase of ADAPTOR for Tata 1200 Hydraulic Excavator of Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2024-25/621) | 15-07-2024 | 31-07-2024 | 31-07-2024 | 31-07-2024 | 04:30 PM | Active | View |
27. | Purchase of Dust Collector Hose for FRD DCR 20 DRILLING MACHINE OPERATING AT DONGRI BUZURG MINE(PUR/MOIL/AGT/DB/2024-25/609) | 15-07-2024 | 27-07-2024 | 27-07-2024 | 27-07-2024 | 04:30 PM | Active | View |
28. | Purchase of FILTERS for FRD DCR 20 DRILLING MACHINE OPERATING AT DONGRI BUZURG MINE(PUR/MOIL/AGT/DB/2024-25/610) | 15-07-2024 | 27-07-2024 | 27-07-2024 | 27-07-2024 | 04:30 PM | Active | View |
29. | Purchase of CABIN AC SPARES for FRD DCR 20 DRILLING MACHINE OPERATING at Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2024-25/614) | 15-07-2024 | 30-07-2024 | 30-07-2024 | 30-07-2024 | 04:30 PM | Active | View |
30. | House keeping and maintenance of Guest house at Balaghat Mine(CIVIL/BGT/LTE/24-25/1312 Dt.15.07.2024) | 15-07-2024 | 22-07-2024 | 22-07-2024 | 22-07-2024 | 04:30 PM | Active | View |
31. | Hiring of Manpower for Recleaning the ore Stacks of at Balaghat Mine(MINING/BGT/LTE/24-25/568 Dated 15.07.2024) | 15-07-2024 | 23-07-2024 | 23-07-2024 | 23-07-2024 | 04:30 PM | Active | View |
32. | Purchase of Dissolved Acetylene Cylinders DA cylinder for Ferro Manganese Plant Balaghat Mine(TE/MOIL/AGT/FMP/MECH/24-25/112 Date 12/07/2024) | 15-07-2024 | 23-07-2024 | 23-07-2024 | 23-07-2024 | 04:30 PM | Active | View |
33. | Formation of base foundation for installation of chock in underground faces.(Gum/Min/2024-25/1083, Date 15.07.2024) | 15-07-2024 | 25-07-2024 | 25-07-2024 | 25-07-2024 | 04:30 PM | Active | View |
34. | STATUTORY PRINTING ITEMS OF BALAGHAT MINE(BGT/TE/PERS/AJGM/24-25/571) | 15-07-2024 | 23-07-2024 | 23-07-2024 | 23-07-2024 | 03:30 PM | Active | View |
35. | TENDER DOCUMENTS FOR OFFICE STATIONERY ITEMS OF BALAGHAT MINE.(BGT/TE/PERS/AJGM/24-25/571) | 15-07-2024 | 23-07-2024 | 23-07-2024 | 23-07-2024 | 03:30 PM | Active | View |
36. | Construction of base foundation for installation of Screening Plant at open cast dump at Gadhaghat near C and S plant no.- 2 at Chikla Mine.(CH/CIVIL/NIT/24-25/617 DT.13.07.2024) | 15-07-2024 | 27-07-2024 | 27-07-2024 | 27-07-2024 | 04:30 PM | Active | View |
37. | Structural Audit and condition assessment (Structural Stability) of Screen House, Crushing Plant, Conveyor System Bunker of IMB Plant Dongri Buzurg Mine.(DB/MECH/24-25/604) | 12-07-2024 | 18-07-2024 | 18-07-2024 | 18-07-2024 | 04:30 PM | Active | View |
38. | Repairing of Approach Road from Rest House to Sand River Bed for Transportation of sand.(Agent/Gum/Min/24-25/566, Date 12.07.2024) | 12-07-2024 | 22-07-2024 | 22-07-2024 | 22-07-2024 | 04:30 PM | Active | View |
39. | RISING OF COMPOUND WALL OF AGENT AND DY. G.M. (MINES) GROUP II BUNGALOW AT CHIKLA MINE.(CH/CIVIL/NIT/24-25/587 DT.09.07.2024) | 11-07-2024 | 24-07-2024 | 24-07-2024 | 24-07-2024 | 04:30 PM | Active | View |
40. | Fabrication of Butterfly Valve Diaphragm along with the Spline Shaft of Air Pulsating Jig of IMB Plant of Balaghat Mine.(AGT/MECH/IMB/24-25/535) | 10-07-2024 | 29-07-2024 | 29-07-2024 | 29-07-2024 | 04:30 PM | Active | View |
41. | Fabrication of 1.5Mtrs Dia. X 2.4Mtrs Height Steel Manways-12 sets for underground at Balaghat Mine.(AGT/MECH/MANWAY/24-25/534) | 10-07-2024 | 26-07-2024 | 26-07-2024 | 26-07-2024 | 04:30 PM | Active | View |
42. | Operation of Vibratory Screen installed at surface for the sand plant in Gumgaon Mine.(Gum/Min/2024-25/1036, Date 10.07.2024) | 10-07-2024 | 20-07-2024 | 20-07-2024 | 20-07-2024 | 04:30 PM | Active | View |
43. | Cutting of shrubs and spraying of decomposer on grass of camp colonies at Munsar Mine(LT/HR/MUN/MM/24-25/867) | 10-07-2024 | 22-07-2024 | 22-07-2024 | 22-07-2024 | 04:00 PM | Active | View |
44. | HIRING OF MINE MATE AT MUNSAR MINE(MUN/TENDER/24-25/549) | 10-07-2024 | 16-07-2024 | 16-07-2024 | 16-07-2024 | 04:30 PM | Active | View |
45. | HIRING OF FOREMAN AT MUNSAR MINE(MUN/TENDER/24-25/548) | 10-07-2024 | 16-07-2024 | 16-07-2024 | 16-07-2024 | 04:30 PM | Active | View |
46. | Pushing of tubs from LHD faces in 300L at Gumgaon Mine(Gum/Min/2024-25/1039, Date 10.07.2024) | 10-07-2024 | 20-07-2024 | 20-07-2024 | 20-07-2024 | 04:30 PM | Active | View |
47. | Service charges for repairing of gear box of II vertical shaft winder of Chikla Mine.(CH/MECH/24-25/76-30939/286/429) | 10-07-2024 | 15-07-2024 | 15-07-2024 | 15-07-2024 | 04:30 PM | Active | View |
48. | Maintenance and repairing work in Vertical Shaft of Chikla Mine.(CH/MECH/24-25/76-30363/230/110) | 10-07-2024 | 15-07-2024 | 15-07-2024 | 15-07-2024 | 04:30 PM | Active | View |
49. | Repairing and overhauling work, body work of Ambulance MH36F 2761.(CH/MECH/24-25/76-29911/214/63) | 10-07-2024 | 15-07-2024 | 15-07-2024 | 15-07-2024 | 04:30 PM | Active | View |
50. | Limited Tender for Computer and Peripherals Annual Maintenance Contract at Chikla Mine(CH/SYSTEM/AMC/2024-25/593 Dt. 09/07/2023) | 10-07-2024 | 18-07-2024 | 18-07-2024 | 18-07-2024 | 04:30 PM | Active | View |
51. | SAND LOADING AND PING AT MUNSAR MINE(MUN/TENDER/24-25/543) | 10-07-2024 | 16-07-2024 | 16-07-2024 | 16-07-2024 | 04:30 PM | Active | View |
52. | Providing and Fixing Doors for Camp quarters at Gumgoan Mine(MM/GUM/CIVIL/LT/24-25/1017 Date 9/7/2024) | 09-07-2024 | 24-07-2024 | 24-07-2024 | 24-07-2024 | 04:30 PM | Active | View |
53. | Internal Painting to Administrative building at Gumgoan Mine(MM/GUM/CIVIL/LT/24-25/1018 Dt 9/7/2024) | 09-07-2024 | 24-07-2024 | 24-07-2024 | 24-07-2024 | 04:30 PM | Active | View |
54. | Construction of Earth Pits for 50 Chainage Substation at Ukwa Mine(UK/ELECT/2024-25/515) | 08-07-2024 | 15-07-2024 | 15-07-2024 | 15-07-2024 | 04:30 PM | Active | View |
55. | Construction of Boundary wall around mine lease area premises at Tirodi Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/31) | 08-07-2024 | 14-08-2024 | 14-08-2024 | 14-08-2024 | 04:00 PM | Active | View |
56. | Upgradation of Government Veterinery hospital under MOIL CER, Tirodi Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/40) | 08-07-2024 | 07-08-2024 | 07-08-2024 | 07-08-2024 | 04:00 PM | Active | View |
57. | Construction of Vehicle parking Shed at Ukwa Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/41) | 08-07-2024 | 14-08-2024 | 14-08-2024 | 14-08-2024 | 04:00 PM | Active | View |
58. | Construction of Parking Shed at 6th level at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/42) | 08-07-2024 | 07-08-2024 | 07-08-2024 | 07-08-2024 | 04:00 PM | Active | View |
59. | Renovation of Various Anganwadi center under MOIL CER, Tirodi Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/33) | 08-07-2024 | 14-08-2024 | 14-08-2024 | 14-08-2024 | 04:00 PM | Active | View |
60. | INSTALLATION OF CCTV SURVEILLANCE SYSTEM AT PRODUCTION SHAFT WINDER(BGT/TE/ELECT/AJGM/24-25/522) | 08-07-2024 | 22-07-2024 | 22-07-2024 | 22-07-2024 | 03:30 PM | Active | View |
61. | Desilting and cleaning of sump and surrounding area of sump at 13L, 100L, 200L, 300L and 400L.(Agent/Gum/Min/24-25/529, Dt 06.07.2024) | 06-07-2024 | 16-07-2024 | 16-07-2024 | 16-07-2024 | 04:30 PM | Active | View |
62. | The transportation of sand from Kanhan River to the area near rest house.(Agent/Gum/Min/24-25/531, Dt 06.07.2024) | 06-07-2024 | 16-07-2024 | 16-07-2024 | 16-07-2024 | 04:30 PM | Active | View |
63. | Development and beautification of garden at New Medical Administrative building at Munsar Mine(LT/CIVIL/MUN/HO-AGT/24-25/521) | 06-07-2024 | 19-07-2024 | 19-07-2024 | 19-07-2024 | 04:00 PM | Active | View |
64. | Providing and fixing of aluminium window for old B and C type quarters at Munsar Mine(LT/CIVIL/MUN/HO-AGT/24-25/521) | 06-07-2024 | 19-07-2024 | 19-07-2024 | 19-07-2024 | 04:00 PM | Active | View |
65. | Providing and Installation of Computerized Automatic Speed Indicator Cum Recorder (CASICR) for 550 HP Holmes Shaft Skip Winder of Balaghat Mine.(PUR/MOIL/BGT/WINDER/24-25/504) | 05-07-2024 | 19-07-2024 | 19-07-2024 | 19-07-2024 | 04:30 PM | Active | View |
66. | Magnetic Defect Graph testing of 36mm FLC type Man winding rope of HS Skip and Production shaft of Balaghat Mine.(AGT/BGT/MECH/WINDER/24-25/505) | 05-07-2024 | 12-07-2024 | 12-07-2024 | 12-07-2024 | 04:30 PM | Active | View |
67. | Purchase of Purchase of 2 Nos Vibratory Motors(AGENT/GR-II/ELECT/24-25/485 DATE 27/06/2024) | 05-07-2024 | 06-07-2024 | 06-07-2024 | 06-07-2024 | 04:30 PM | Active | View |
68. | Fabrication of Rack and Pinion Gear set-40 Nos. of pneumatic actuator assembly of butterfly valve of air pulsating Jig of IMB plant at Balaghat Mine.(AGT/BGT/MECH/IMB/24-25/503) | 05-07-2024 | 26-07-2024 | 26-07-2024 | 26-07-2024 | 04:30 PM | Active | View |
69. | Proposal for hiring of 30HP Tractor mounted diesel pump with tractor 50-52 and underground section,Tirodi mine(TRD/MINE/697 DATED 27/06/2024) | 05-07-2024 | 11-07-2024 | 11-07-2024 | 12-07-2024 | 04:00 PM | Active | View |
70. | Hiring of equipment for removal of subgrade mineral reject at U/G at Balaghat Mine(MINING/BGT/LTE/24-25/497 Dated 03.07.2024) | 05-07-2024 | 11-07-2024 | 11-07-2024 | 11-07-2024 | 04:30 PM | Active | View |
71. | Filling and spreading at -170 L Chikla B section at Chikla Mine.(Mining/CH/T.E./24-25/487) | 04-07-2024 | 11-07-2024 | 11-07-2024 | 11-07-2024 | 04:30 PM | Active | View |
72. | Purchase of Track Roller of FRD DRILLING MACHINE OF DONGRI BUZURG MINE(PUR/MOIL/AGT/DB/2024-25/514) | 03-07-2024 | 11-07-2024 | 11-07-2024 | 11-07-2024 | 04:30 PM | Active | View |
73. | Proposal for Hiring of 3 Nos winding Engine Driver for 622 HP winder of Ukwa Mine.(AJGM/UK/MECH/2024-25/493) | 03-07-2024 | 09-07-2024 | 09-07-2024 | 09-07-2024 | 04:30 PM | Active | View |
74. | Providing and supplying of Disc Brake Status Indication System for 350HP Winder driver cabin at Gumgaon Mine(GUM/ ELECT / 24-25 / 900 DT 02.07.2024) | 03-07-2024 | 13-07-2024 | 13-07-2024 | 13-07-2024 | 04:30 PM | Active | View |
75. | Purchase of Seal kit cushion sub and Joint piece of FRD DRILLING MACHINE OF DONGRI BUZURG MINE.(PUR/MOIL/AGT/DB/2024-25/513) | 03-07-2024 | 11-07-2024 | 11-07-2024 | 11-07-2024 | 04:30 PM | Active | View |
76. | Repairs and renovation of existing Sewage Treatment Plant at Kandri Mine(CIVIL/KD/T.E./24-25/491 Date 01.07.2024) | 03-07-2024 | 20-07-2024 | 20-07-2024 | 20-07-2024 | 04:30 PM | Active | View |
77. | Repair and Rewinding of 2 Nos 50 HP Submersible Pump set of -400Ft L U/G of Gumgaon Mine(Gum/ELECT/24-25/902 DT 02.07.2024) | 03-07-2024 | 15-07-2024 | 15-07-2024 | 15-07-2024 | 04:30 PM | Active | View |
78. | Repairing of 3phase 5wire LT Overhead line terminated to mine rest house and mine magazine at Gumgaon mine.(GUM/ELECT/24-25/898 DT 02.07.2024) | 03-07-2024 | 16-07-2024 | 16-07-2024 | 16-07-2024 | 04:30 PM | Active | View |
79. | Providing, supplying and distributing Fruit bearing plants (1000 nos.) to Tirodi GrarM Panchayat under MOIL CER(TRD/CIVIL/24-25/665 DATE 30/06/2024) | 03-07-2024 | 10-07-2024 | 10-07-2024 | 10-07-2024 | 04:00 PM | Active | View |
80. | Providing, supplying and distributing Fruit bearing plants (1000 nos.) to Sitapatore Grarm PanchayaT under MOIL CER(SP/CIVIL/24-25/425 DATED 30/06/2024) | 03-07-2024 | 10-07-2024 | 10-07-2024 | 10-07-2024 | 04:00 PM | Active | View |
81. | Reparing of roads in Sand lease Kalaphata ghat at Kandri Mine(CIVIL/KD/T.E./24-25/498 Date 02.07.2024) | 03-07-2024 | 20-07-2024 | 20-07-2024 | 20-07-2024 | 04:30 PM | Active | View |
82. | Miscellaneous Civil repairing works of camp quarters at Munsar Mine(LT/MUN/HO-AGT/2024-25/ Date 01.07.2024) | 02-07-2024 | 15-07-2024 | 15-07-2024 | 15-07-2024 | 09:00 AM | Active | View |
83. | Refurbishment of Production Shaft by replacing Guide Rails from zero to 4th level at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/39) | 02-07-2024 | 09-08-2024 | 09-08-2024 | 09-08-2024 | 04:00 PM | Active | View |
84. | Repairing of double deck vibration screen of Niagra plant Ukwa Mine(AJGM/UK/MECH/2024-25/454) | 29-06-2024 | 06-07-2024 | 06-07-2024 | 06-07-2024 | 04:30 PM | Active | View |
85. | Major Repairing of 80 HP centrifugal pump of 1st Vertical 2nd level of Ukwa Mine.(AJGM/UK/MECH/2024-25/463) | 29-06-2024 | 06-07-2024 | 06-07-2024 | 06-07-2024 | 04:30 PM | Active | View |
86. | Up-gradation of Tramline by replacing with Diamond, RHS and LHS crossing at Underground of Ukwa Mine(AJGM/UK/MECH/2024-25/462) | 29-06-2024 | 06-07-2024 | 06-07-2024 | 06-07-2024 | 04:30 PM | Active | View |
87. | Rollers for conveyor belts installed at DSU and MSP at Munsar Mine(PUR/MOIL/AGTGRIII/MS/2425/466) | 29-06-2024 | 16-07-2024 | 16-07-2024 | 16-07-2024 | 04:30 PM | Active | View |
88. | Construction of Stores Complex at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/35) | 29-06-2024 | 30-07-2024 | 30-07-2024 | 30-07-2024 | 04:00 PM | Active | View |
89. | construction of Boundary wall at Government middle School of Sukali Village under MOIL CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/28) | 29-06-2024 | 06-08-2024 | 06-08-2024 | 06-08-2024 | 04:00 | Active | View |
90. | Hiring front end loader to make up for the breakdown time of departmental loader and shovel and ensure the smooth running of our production and dispatch activities at Balaghat Mine(MINING/BGT/LTE/24-25/468 Dated 28.06.2024) | 28-06-2024 | 04-07-2024 | 04-07-2024 | 04-07-2024 | 04:30 PM | Active | View |
91. | Chemical Analysis by different methods at EMD Plant Laboratory Dongri Buzurg Mine. (2nd Call)(MOIL/DB/EMD/ADGM/TE/24-25/482) | 27-06-2024 | 19-07-2024 | 19-07-2024 | 19-07-2024 | 04:30 PM | Active | View |
92. | Digging of suppressed muck at 13.5th level North from Ch 40 to Ch 27 Balaghat Mine(MINING/BGT/LTE/24-25/1133 Dated 27.06.2024) | 27-06-2024 | 02-07-2024 | 02-07-2024 | 02-07-2024 | 04:30 PM | Active | View |
93. | Hiring of JCB for cutting of open drain along canal of Sitapatore Mine(SP/Mining/24-25/415 Dated 27/06/2024) | 27-06-2024 | 02-07-2024 | 02-07-2024 | 02-07-2024 | 04:00 PM | Active | View |
94. | Repair of kachcha road from new Industrial Shed to 6 no. pit at Sitapatore Mine(SP/Mining/24-25/417 Dated 27/06/2024) | 27-06-2024 | 02-07-2024 | 02-07-2024 | 02-07-2024 | 04:00 PM | Active | View |
95. | Making of safety embankment along benches at 2 no. and 3 no. pit in mine area of Sitapatore Mine(SP/Mining/24-25/416 Dated 27/06/2024) | 27-06-2024 | 02-07-2024 | 02-07-2024 | 02-07-2024 | 04:00 PM | Active | View |
96. | REPAIR AND REWINDING OF 80V, 7.5KW, 10HP DC SERIES MOTOR, 02NOS.(BGT/TE/ELECT/AJGM/24-25/460) | 27-06-2024 | 11-07-2024 | 11-07-2024 | 11-07-2024 | 03:30 PM | Active | View |
97. | Drain Cleaning at 1750L 1st vertical from Ch 6900 to Ch 5100 around 540m.(AGT/MINING/UK/LT/2024-25/461 Dt. 27.06.2024) | 27-06-2024 | 03-07-2024 | 03-07-2024 | 03-07-2024 | 06:30 PM | Active | View |
98. | Transportation of Bottom Ash from Khasala Ash Pond to sand stowing plant of Gumgaon Mine.(Gum/Min/2024-25/839, Date 26.06.2024) | 26-06-2024 | 06-07-2024 | 06-07-2024 | 06-07-2024 | 04:30 PM | Active | View |
99. | Proprietory Single Tender enquiry in Single bid for purchase of Servomesh XP 460 oil for Shanthi make Gear box of 350 HP Winder at Gumgaon Mine.(GUM/ENGG/PUR/24-25/831) | 26-06-2024 | 06-07-2024 | 06-07-2024 | 06-07-2024 | 03:30 PM | Active | View |
100. | Construction of Earth Pits for 12000 Chainage Substation at Ukwa Mine(UK/ELECT/2024-25/450) | 25-06-2024 | 02-07-2024 | 02-07-2024 | 02-07-2024 | 04:30 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (205) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |