निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Designing, Engineering, Supplying, Installation, Commissioning and Testing of 2x1000KVA, 11KV/433V and1x1000KVA,11KV/3.3KV Composite Indoor Substation for Vertical Shaft Project Of Munsar Mine. (DGM(E)/6/ MAN/13-14/ 85) | 29-06-2013 | 23-07-2013 | 24-07-2013 | 24-07-2013 | 3:30PM | Active | और देखें |
2. | Water proofing treatment to A type, B type and C type quartes at Chikla Mine. (Civil/HO/13-14/CH/34) | 28-06-2013 | 08-07-2013 | 09-07-2013 | 09-07-2013 | 3:30PM | Active | और देखें |
3. | Tippers 9 Nos. (Only Through e-procurement) (WE-1 DT.26/06/2013 | 28-06-2013 | 24-07-2013 | 24-07-2013 | 24-07-2013 | 3:30PM | Active | और देखें |
4. | Development Works at Rabindranath Tagore School ( R.N.T.School ) Balaghat,Under MOIL C.S.R. (Civil/HO/13-14/BGT/CSR/35) | 28-06-2013 | 10-07-2013 | 11-07-2013 | 11-07-2013 | 3:30PM | Active | और देखें |
5. | Tippers 9 Nos. (Only Through e-procurement) (WE-1 DT.26/06/2013 | 28-06-2013 | 24-07-2013 | 24-07-2013 | 24-07-2013 | 3:30PM | Active | और देखें |
6. | Hydraulic Excavator 1 No. (Only Through e-procurement) (WE-23 DT.26/06/2013) | 28-06-2013 | 23-07-2013 | 23-07-2013 | 23-07-2013 | 3:30PM | Active | और देखें |
7. | PURCHASE OF M. S. ELECTRODES - 4 ITEMS (PUR/MOIL/C-3/22/E-42/641-M) | 27-06-2013 | 18-07-2013 | 19-07-2013 | 19-07-2013 | 3:30PM | Active | और देखें |
8. | PURCHASE OF SPARES/PARTS FOR SPIRAL CLASSIFIER (PUR/MOIL/C-11/135/E-41/633-M) | 27-06-2013 | 16-07-2013 | 17-07-2013 | 17-07-2013 | 3:30PM | Active | और देखें |
9. | PURCHASE OF SOLENOID VALVE AND SOLENOID COIL (PUR/MOIL/C-11/131/E-38/618-M) | 26-06-2013 | 16-07-2013 | 17-07-2013 | 17-07-2013 | 3:30PM | Active | और देखें |
10. | Construction of Dormitory for Drivers at Rest House Complex at Balaghat Mine. | 25-06-2013 | 10-07-2013 | 11-07-2013 | 11-07-2013 | 3:30PM | Active | और देखें |
11. | WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR 3T AND 4T BATTERY OPERATED LOCOMOTIVES (PUR/MOIL/C-5/44/E-37/537-M) | 21-06-2013 | 04-07-2013 | 05-07-2013 | 05-07-2013 | 3:30PM | Active | और देखें |
12. | Terrace Water proofing to Transit House, Annex Building of Guest House and Security Check Post at West Court premises,MOIL,Nagpur. | 19-06-2013 | 24-06-2013 | 25-06-2013 | 25-06-2013 | 3:30PM | Active | और देखें |
13. | Picking and collection of 3rd gr. dump lump, SM gr. LGHS and small ore from dump at Kandri Mine | 19-06-2013 | 18-07-2013 | 19-07-2013 | 19-07-2013 | 3:00PM | Active | और देखें |
14. | PURCHASE OF R.D. HOSES - 5 ITEMS | 18-06-2013 | 07-07-2013 | 08-07-2013 | 08-07-2013 | 3:30PM | Active | और देखें |
15. | Picking and collection of UK-4445 AND UKL-448 from Ch. 8600 to 9500 at Ukwa Mine | 18-06-2013 | 28-06-2013 | 28-06-2013 | 28-06-2013 | 3:00PM | Active | और देखें |
16. | WINZING BETWEEN CH.600 AND 700 AT CH. 9TH L AND 10TH L NORTH AT BALAGHAT MINE | 18-06-2013 | 28-06-2013 | 28-06-2013 | 28-06-2013 | 3:00PM | Active | और देखें |
17. | PURCHASE OF SHOT FIRING CABLE - 5550 MTRS | 18-06-2013 | 23-07-2013 | 24-07-2013 | 24-07-2013 | 3:30PM | Active | और देखें |
18. | Construction of approach road from state highway to Chargaon and Wahitola village.Under MOIL CSR | 18-06-2013 | 09-07-2013 | 11-07-2013 | 11-07-2013 | 3:00PM | Active | और देखें |
19. | PURCHASE OF SHOT FIRING CABLE - 5550 MTRS | 18-06-2013 | 23-07-2013 | 24-07-2013 | 24-07-2013 | 3:30PM | Active | और देखें |
20. | PURCHASE OF CEMENT CAPSULES | 18-06-2013 | 09-07-2013 | 10-07-2013 | 10-07-2013 | 3:30PM | Active | और देखें |
21. | LOADING OF MN. ORE INTO TRUCKS FOR DESPATCHES OF ORE AT UKWA MINE | 17-06-2013 | 25-06-2013 | 25-06-2013 | 25-06-2013 | 3:00PM | Active | और देखें |
22. | Construction of Community Centre at Tumsar Distt. Bhandara Under MOIL CSR. | 17-06-2013 | 09-07-2013 | 11-07-2013 | 11-07-2013 | 3:30PM | Active | और देखें |
23. | Recovery of SM grade BGL-462, Balaghat | 15-06-2013 | 25-06-2013 | 25-06-2013 | 25-06-2013 | 3:00PM | Active | और देखें |
24. | PURCHASE OF M.S.PIPES OF ASSORTED SIZES. | 14-06-2013 | 04-07-2013 | 05-07-2013 | 05-07-2013 | 3:30PM | Active | और देखें |
25. | Replacement of old A.C. Sheet roof with new profile UPVC Sheet roofing of Rajeev Gandhi Hall at Balaghat Mine. | 14-06-2013 | 24-06-2013 | 25-06-2013 | 25-06-2013 | 3:30PM | Active | और देखें |
26. | Recovery of LGHS ore from Magazine Dump by off the pit working at Dongri Buzurg Mine | 14-06-2013 | 25-06-2013 | 25-06-2013 | 25-06-2013 | 3:00PM | Active | और देखें |
27. | PURCHASE OF LEATHER SHOES PREFERABLY MILITARY PATTERN OR EQUIVALENT. | 14-06-2013 | 04-07-2013 | 05-07-2013 | 05-07-2013 | 3:30PM | Active | और देखें |
28. | PURCHASE OF LEATHER SHOES PREFERABLY MILITARY PATTERN OR EQUIVALENT. | 14-06-2013 | 04-07-2013 | 05-07-2013 | 05-07-2013 | 3 | Active | और देखें |
29. | PURCHASE OF PNEUMATICALLY OPERATED AIR WINCH CAPACITY - 1 TON, 8 NOS. | 14-06-2013 | 11-07-2013 | 12-07-2013 | 12-07-2013 | 3:30PM | Active | और देखें |
30. | PURCHASE OF ELECTRICALLY OPERATED SUBMERSIBLE EFFLUENT PUMP SETS, 3 NOS. | 14-06-2013 | 11-07-2013 | 12-07-2013 | 12-07-2013 | 3:30PM | Active | और देखें |
31. | PURCHASE OF TERMINAL CONNECTOR | 14-06-2013 | 07-07-2013 | 08-07-2013 | 08-07-2013 | 3:30PM | Active | और देखें |
32. | PURCHASE OF LEATHER SHOES PREFERABLY MILITARY PATTERN OR EQUIVALENT. (PUR/MOIL/C-1/185/E-36/531-M ) | 14-06-2013 | 25-07-2013 | 26-07-2013 | 26-07-2013 | 3:30PM | Active | और देखें |
33. | PURCHASE OF HMI SCREEN WITH POWER SUPPLY UNIT | 13-06-2013 | 02-07-2013 | 03-07-2013 | 03-07-2013 | 3:30PM | Active | और देखें |
34. | Picking and collection of SM gr. Mn ore MSL-478,437,447 and 498 from Pandadai and 270L at Munsar | 12-06-2013 | 18-06-2013 | 19-06-2013 | 19-06-2013 | 3:00PM | Active | और देखें |
35. | Picking and collection of SM gr.Mn ore MSL-478,437,447 and 498 from 135L and 270L East dump at Munsar Mine | 12-06-2013 | 18-06-2013 | 19-06-2013 | 19-06-2013 | 3:00PM | Active | और देखें |
36. | rendering technical assistance services as architectural consultant and Structural Design Consultancy for Construction of Residential Type A quarters at MOIL Nagpur | 12-06-2013 | 25-06-2013 | 26-06-2013 | 26-06-2013 | 3:30PM | Active | और देखें |
37. | Recovery of Ferro grade and LGHS lumpy ore from North Dump at Tirodi Mine | 11-06-2013 | 20-06-2013 | 20-06-2013 | 20-06-2013 | 3:00PM | Active | और देखें |
38. | Recovery of 25 percent Mn lumpy and small ore from contaminated low grade ROM at Dongri Buzurg Mine | 11-06-2013 | 20-06-2013 | 20-06-2013 | 20-06-2013 | 3:00PM | Active | और देखें |
39. | Recovery of 42-44 percent lumpy ore from contaminated ROM at Dongri Buzurg Mine. | 11-06-2013 | 20-06-2013 | 20-06-2013 | 20-06-2013 | 3:30PM | Active | और देखें |
40. | Recovery of Ferro grade and LGHS lumpy ore from North Dump at Tirodi Mine | 11-06-2013 | 20-06-2013 | 20-06-2013 | 20-06-2013 | 3:00PM | Active | और देखें |
41. | Recovery of 25 percent Mn lumpy and small ore from contaminated low grade ROM at Dongri Buzurg Mine | 11-06-2013 | 20-06-2013 | 20-06-2013 | 20-06-2013 | 3:00PM | Active | और देखें |
42. | Recovery of 42-44 percent lumpy ore from contaminated ROM at Dongri Buzurg Mine. | 11-06-2013 | 20-06-2013 | 20-06-2013 | 20-06-2013 | 3:30PM | Active | और देखें |
43. | Cleaning and excavation of drain from back side of boundary wall of MOIL Bhawan premises, H.O., Nagpur. | 11-06-2013 | 17-06-2013 | 18-06-2013 | 18-06-2013 | 3:30PM | Active | और देखें |
44. | Purchase of Tramline Accessories for various Mines 08 Items (PUR/MOIL/C-12/5/WE-15) | 11-06-2013 | 07-08-2013 | 08-08-2013 | 08-08-2013 | 3:30PM | Active | और देखें |
45. | Recovery of Ferro grade and LGHS lumpy ore from Jamrapani Area at Tirodi Mine | 10-06-2013 | 18-06-2013 | 18-06-2013 | 18-06-2013 | 3:00PM | Active | और देखें |
46. | Cleaning, collection and stacking of fines at Tirodi Mine | 10-06-2013 | 18-06-2013 | 18-06-2013 | 18-06-2013 | 3:00PM | Active | और देखें |
47. | Recovery of LGHS and SM grade ore from 320 Level South dump at Chikla Mine | 10-06-2013 | 18-06-2013 | 18-06-2013 | 18-06-2013 | 3:00PM | Active | और देखें |
48. | Recovery of LGHS and SM grade ore from 320 Level North dump at Chikla Mine | 10-06-2013 | 18-06-2013 | 18-06-2013 | 18-06-2013 | 3:00PM | Active | और देखें |
49. | Purchase of Tyres Tubes and Flaps and Solid Tyres | 10-06-2013 | 25-07-2013 | 26-07-2013 | 26-07-2013 | 3:00PM | Active | और देखें |
50. | Certification Audit of Sustainable Development Projects of MOIL Limited. | 07-06-2013 | 14-06-2013 | 14-06-2013 | 14-06-2013 | 3:00pm | Active | और देखें |
51. | Pushing and unloading of ROM and rock tubs in UG on surface at Gumgaon Mine | 07-06-2013 | 12-06-2013 | 13-06-2013 | 13-06-2013 | 3:00PM | Active | और देखें |
52. | Transportation of sand from Kanhan river to sand stowing plant at Gumgaon Mine | 07-06-2013 | 12-06-2013 | 13-06-2013 | 13-06-2013 | 3:30PM | Active | और देखें |
53. | Picking and sorting of 3rd gr dump lump, SM gr LGHS and small ore from dump at Kandri Mine | 07-06-2013 | 12-06-2013 | 13-06-2013 | 13-06-2013 | 3:30PM | Active | और देखें |
54. | Drilling of one No. borewell at Sitapotar Mine. | 07-06-2013 | 19-06-2013 | 20-06-2013 | 20-06-2013 | 3:30PM | Active | और देखें |
55. | Drilling of one No. borewell at Sitapotar Mine. | 07-06-2013 | 19-06-2013 | 20-06-2013 | 20-06-2013 | 3:30PM | Active | और देखें |
56. | PURCHASE OF HYDRAULIC HAND PALLET TRUCKS, 5 TON CAPACITY 3 NOS. AND 3 TON CAPACITY 2 NOS. | 07-06-2013 | 04-07-2013 | 05-07-2013 | 05-07-2013 | 3:30 PM | Active | और देखें |
57. | WEBSITE LIMITED TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF CROSS BIT, 57 MM DIA. SUITABLE FOR CABLE BOLTING MACHINE | 07-06-2013 | 07-07-2013 | 08-07-2013 | 08-07-2013 | 3:30PM | Active | और देखें |
58. | PURCHASE OF OFFICE FURNITURE AS PER ANNEXURE - A ENCLOSED | 06-06-2013 | 20-06-2013 | 21-06-2013 | 21-06-2013 | 3:30PM | Active | और देखें |
59. | TRANSPORTATION OF COAL | 06-06-2013 | 06-07-2013 | 22-07-2013 | 22-07-2013 | 3:30PM | Active | और देखें |
60. | Purchase of Vehicle and Inverter Batteries | 05-06-2013 | 17-07-2013 | 18-07-2013 | 18-07-2013 | 3:30pm | Active | और देखें |
61. | MONITORING THE ENV. PARAMETERS OF MAHARASHTRA AND M.P. | 05-06-2013 | 14-06-2013 | 14-06-2013 | 14-06-2013 | 3:00PM | Active | और देखें |
62. | Description Breaking of metal at FMP Balaght | 05-06-2013 | 25-06-2013 | 25-06-2013 | 25-06-2013 | 3:30PM | Active | और देखें |
63. | PURCHASE OF SS WIRE MESH PANELS | 05-06-2013 | 25-06-2013 | 26-06-2013 | 26-06-2013 | 3:30PM | Active | और देखें |
64. | PURCHASE OF ELECTRICALLY OPERATED AUXILIARY VENTILATION FANS, 17 NOS. | 05-06-2013 | 30-06-2013 | 01-07-2013 | 01-07-2013 | 3:30PM | Active | और देखें |
65. | PURCHASE OF MINE VENTILATION FAN WITH MOTOR AND STARTER, 1 NO. | 05-06-2013 | 02-07-2013 | 03-07-2013 | 03-07-2013 | 3:30PM | Active | और देखें |
66. | Construction of office room with verandah, toilet and Ammonium Nitrate room in magazine at Dongri Buzurg. Mine | 04-06-2013 | 06-06-2013 | 07-06-2013 | 07-06-2013 | 3:30PM | Active | और देखें |
67. | PURCHASE OF CARBON ELECTRODE PASTE | 04-06-2013 | 04-07-2013 | 15-07-2013 | 15-07-2013 | 3.30 PM | Active | और देखें |
68. | PURCHASE OF RUBBER TUB BUFFER. | 03-06-2013 | 23-06-2013 | 24-06-2013 | 24-06-2013 | 3:30PM | Active | और देखें |
69. | PURCHASE OF IRON ORE | 03-06-2013 | 03-07-2013 | 11-07-2013 | 11-07-2013 | 3.30 PM | Active | और देखें |
70. | PURCHASE OF SQUIRREL CAGE INDUCTION MOTOR WITH BRAKE ASSEMBLY | 01-06-2013 | 20-06-2013 | 21-06-2013 | 21-06-2013 | 3:30 PM | Active | और देखें |
71. | Trench cutting in ore stacks for sampling at Tirodi Mine | 01-06-2013 | 11-06-2013 | 11-06-2013 | 11-06-2013 | 3:00PM | Active | और देखें |
72. | Recovery of 4th grade small ore by washing and picking from East of D dump at Tirodi Mine | 01-06-2013 | 11-06-2013 | 11-06-2013 | 11-06-2013 | 3:00PM | Active | और देखें |
73. | Purchase of TCT Drill Rods | 01-06-2013 | 10-07-2013 | 11-07-2013 | 11-07-2013 | 3:30PM | Active | और देखें |
74. | PURCHASE OF HDPE PIPES, BENDS AND PIPE ENDS (PUR/MOIL/C-1/199/WE-13) | 01-06-2013 | 29-07-2013 | 30-07-2013 | 30-07-2013 | 3.30 PM | Active | और देखें |
75. | NEW FLAT BOTTOM RAILWAY RAILS, 90 LBS 45 KG MTRS | 31-05-2013 | 08-07-2013 | 09-07-2013 | 09-07-2013 | 3.30 PM | Active | और देखें |
76. | PROVIDING AND APPLYING DISTEMPERING IN WEST COURT HOUSE | 30-05-2013 | 06-06-2013 | 07-06-2013 | 07-06-2013 | 3.00 PM | Active | और देखें |
77. | PURCHASE OF SPARES FOR HYDRAULIC FILTER PRESS | 30-05-2013 | 20-06-2013 | 21-06-2013 | 21-06-2013 | 3.30 PM | Active | और देखें |
78. | PURCHASE OF OLDHAM 102 TYPE MAKE CAP LAMP ETC | 29-05-2013 | 13-06-2013 | 14-06-2013 | 14-06-2013 | 3.00 PM | Active | और देखें |
79. | PURCHASE OF SEAL KIT FOR HYDRAULIC CYLINDER | 28-05-2013 | 16-06-2013 | 17-06-2013 | 17-06-2013 | 3.00 PM | Active | और देखें |
80. | Recovery of LGHS Lumpy Ore from North dump at Tirodi Mine | 27-05-2013 | 05-06-2013 | 05-06-2013 | 05-06-2013 | 3.00 pm | Active | और देखें |
81. | REMOVAL OF WASTE DUMP AND HANDLING, TIRODI MINE | 27-05-2013 | 05-06-2013 | 05-06-2013 | 05-06-2013 | 3.00 PM | Active | और देखें |
82. | PURCHASE OF PEARL COKE | 27-05-2013 | 27-06-2013 | 04-07-2013 | 04-07-2013 | 3:30PM | Active | और देखें |
83. | PURCHASE OF MULTIFILAMENT FILTER CLOTH | 24-05-2013 | 13-06-2013 | 14-06-2013 | 14-06-2013 | 3:30PM | Active | और देखें |
84. | Providing and Planting 4000 No. Tree Plantation in MSRPF compus at Hingna Nagpur. | 23-05-2013 | 29-05-2013 | 30-05-2013 | 30-05-2013 | 3:30PM | Active | और देखें |
85. | HUTCH DRAIN CLEANING OF JIG SECTION OF OCF AT BALAGHAT MINE | 23-05-2013 | 31-05-2013 | 31-05-2013 | 31-05-2013 | 3:00PM | Active | और देखें |
86. | Recovery of SM Grade ore from North Side of Viraswami dump at Tirodi Mine. | 22-05-2013 | 31-05-2013 | 31-05-2013 | 31-05-2013 | 3:00PM | Active | और देखें |
87. | Breaking, sizing and sorting of lumpy ore, S. M. Gr. 25 per Mn MSL-447 at Munsar Mine | 21-05-2013 | 23-05-2013 | 24-05-2013 | 24-05-2013 | 4:30 PM | Active | और देखें |
88. | Screening, picking, collection and stacking of 25 per Mn small ore MSL-498 through trommel at Munsar Mine from Pandadia Dump. | 21-05-2013 | 23-05-2013 | 24-05-2013 | 24-05-2013 | 4:30PM | Active | और देखें |
89. | Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine | 20-05-2013 | 27-05-2013 | 28-05-2013 | 28-05-2013 | 3:00PM | Active | और देखें |
90. | Purchase of Cement 43 Grade OPC Equivalent PPC conforming to IS specifications with latest amendment | 20-05-2013 | 20-06-2013 | 27-06-2013 | 27-06-2013 | 3:30PM | Active | और देखें |
91. | Transportation of sand from Kalaphata Ghat of MOIL situated on Pench river at Kandri Mine | 17-05-2013 | 23-05-2013 | 24-05-2013 | 24-05-2013 | 3:00PM | Active | और देखें |
92. | Construction of Sump near Guest House, East Court, MOIL, Nagpur | 17-05-2013 | 24-05-2013 | 27-05-2013 | 27-05-2013 | 3:30PM | Active | और देखें |
93. | PURCHASE OF MEASURING POCKET AND LAUNDER ASSEMBLY, 2 SETS. | 17-05-2013 | 27-06-2013 | 28-06-2013 | 28-06-2013 | 3:30PM | Active | और देखें |
94. | Picking and collection of UK-4445 and UKL-448 from Hanging wall dump from Ch.6800 to Ch.8600 at Ukwa Mine | 16-05-2013 | 22-05-2013 | 22-05-2013 | 22-05-2013 | 3:00PM | Active | और देखें |
95. | Cleaning of surplus ROM of OC development to recover Ferro grade and LGHS ore at Gudma Section of Ukwa Mine | 16-05-2013 | 24-05-2013 | 24-05-2013 | 24-05-2013 | 3:00PM | Active | और देखें |
96. | Underground development at 70 ft L and 170 ft L at Munsar Mine | 16-05-2013 | 14-06-2013 | 17-06-2013 | 17-06-2013 | 3:00PM | Active | और देखें |
97. | Transportation of sand from kanhan River to Sand stowing plant at Gumgaon Mine | 15-05-2013 | 21-05-2013 | 22-05-2013 | 22-05-2013 | 3:00 PM | Active | और देखें |
98. | Painting and allied works on third floor MOIL Bhawan at Nagpur | 15-05-2013 | 27-05-2013 | 28-05-2013 | 28-05-2013 | 3:30PM | Active | और देखें |
99. | Construction of 02 sets Toilet block near BDC and Workshop at Kandri Mine. | 14-05-2013 | 27-05-2013 | 28-05-2013 | 28-05-2013 | 3:30pm | Active | और देखें |
100. | Construction of shed near Pit office of Vertical shaft at Kandri Mine. | 14-05-2013 | 27-05-2013 | 28-05-2013 | 28-05-2013 | 3:30pm | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2025) वर्ष के निविदाएं देखें |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(205) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |