निविदा संग्रह

निविदाएं संग्रह

खोज के लिए शीर्षक निविदा जारी करने की तिथि निविदा जारी करने की अंतिम तिथि
क्रमांक शीर्षक अंक प्रारंभ दिनांक अंक अंतिम तिथी प्रस्तुत करने की अंतिम तिथि खुलने की तिथि खुलने का समय स्थिति और देखें
1. Up gradation of visitors enclosure on first floor MOIL Bhawan Nagpur.(Civil /HO/16-17 /HO/63 Dated 01/11/2016) 02-12-2016 08-12-2016 08-12-2016 08-12-2016 03:30 PM Active और देखें
2. Picking and collection of UKL-448 from F/W dump at Ukwa Mine(Gr.-I/CGM(PR)/CONT/R-DUMP/24/UK/2016-17/12) 02-12-2016 09-12-2016 09-12-2016 09-12-2016 03:30 PM Active और देखें
3. Construction of compound wall for 33 KV Substation premises at Ukwa Mine.(Civil /HO/16-17 /UK/64 Dated - 01/11/2016) 02-12-2016 15-12-2016 15-12-2016 15-12-2016 03:30 PM Active और देखें
4. REPAIRING OF TRACK CHAIN ASSY.- 2 Nos., SPROCKET ASSY.- 2 Nos. AND IDLER ASSY.- 2 Nos.OF DI 500 No.2 SANDVIK MAKE DRILLING MACHINE OPERATING AT DONGRI BUZURG MINE(A-II/CHK/DB/16-17/ 608 dtd 30.11.2016) 01-12-2016 08-12-2016 08-12-2016 08-12-2016 04:30 PM Active और देखें
5. Handing and despatches of ore into trucks at Ukwa Mine(MOIL/16-17/ET/130) 01-12-2016 23-12-2016 23-12-2016 23-12-2016 03:30 PM Active और देखें
6. LOADING AND TRANSPORTATION OF MILL TAILING FROM MALAJKHAND MINE OF M/S HCL TO UKWA MINE FOR STOWING(MOIL/16-17/ET/129) 01-12-2016 23-12-2016 23-12-2016 23-12-2016 03:30 PM Active और देखें
7. FAMILY SIZE (2M3) PRE-FABRICATED BIOGAS PLANT (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-88 DT.01/12/2016, e-TENDER NO.MOIL/16-17/ET/133) 01-12-2016 28-12-2016 28-12-2016 28-12-2016 3:30 PM Active और देखें
8. Supply of Two Nos Pump sets along with assecories for Drinking Water Supply Scheme of Village Dongri Buzurg Distt Bhandara under CSR.(ADGM/DB/ELECT/16-17/700) 01-12-2016 17-12-2016 17-12-2016 17-12-2016 04:30 PM Active और देखें
9. Picking and collection of material from South A waste dump at Tirodi Mine(MOIL/16-17/ET/132) 01-12-2016 23-12-2016 23-12-2016 23-12-2016 03:30 PM Active और देखें
10. Recovery of SM Grade BGL-523 at Balaghat Mine(MOIL/16-17/ET/131) 01-12-2016 23-12-2016 23-12-2016 23-12-2016 03:30 PM Active और देखें
11. FAMILY SIZE (2M3) PRE-FABRICATED BIOGAS PLANT (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-88 DT.01/12/2016, e-TENDER NO.MOIL/16-17/ET/133) 01-12-2016 26-12-2016 26-12-2016 26-12-2016 03:30 PM Active और देखें
12. Interior and Exterior Painting Works for Administrative Building of Balaghat Mine. (83/Civil/BGT/16-17/6043 Date 27.11.2016) 30-11-2016 07-12-2016 07-12-2016 07-12-2016 4:00 PM Active और देखें
13. Removal of Capping of waste/low content mn. ore to recover SM grade ore from Black dump by mechanised means at Balaghat Mine (MOIL/16-17/ET/128) 29-11-2016 21-12-2016 21-12-2016 21-12-2016 3:30 PM Active और देखें
14. Maintenance of Gardens at Balaghat Mine.Civil /HO/16-17 /BGT/60 Dated - 25/11/2016 2016-MOIL-169105-1 28-11-2016 14-12-2016 14-12-2016 14-12-2016 3:30 PM Active और देखें
15. PURCHASE OF SPARES OF BUTTERFLY VALVE AND HYDRAULIC POWER PACK (PUR/MOIL/C-11/129/E-55/1587-M) 28-11-2016 19-12-2016 19-12-2016 19-12-2016 3:30 PM Active और देखें
16. PURCHASE OF TARPAULINS. (PUR/MOIL/C-1/210/E-56/1605-M Dt. 28/11/2016) 28-11-2016 21-12-2016 21-12-2016 21-12-2016 3:30 PM Active और देखें
17. HIRING OF ARCHITECTURAL AND STRUCTURAL CONSULTANT FOR CONSTRUCTION OF GUEST HOUSE AT KANDRI MINE (CIVIL/HO/16-17/KAN/60 DT. 25/11/2016) 26-11-2016 13-12-2016 13-12-2016 13-12-2016 3:30 PM Active और देखें
18. Maintenance of garden at Agent Bungalow, Mine Manager Bungalow, Children Park, Hospital and Rock Garden at Munsar Mine. ( CIVIL/HO/16-17/MUN/61 Dt- 25/11/2016 ) 26-11-2016 13-12-2016 13-12-2016 13-12-2016 3:30 PM Active और देखें
19. PURCHASE OF STEEL WIRE ROPES - 11 ITEMS. (WE-94 DT.24/11/2016(e-Tender no.MOIL/16-17/ET/126)) 25-11-2016 22-12-2016 22-12-2016 22-12-2016 3:30 PM Active और देखें
20. Additional excavation in manganiferrous rock for concreting from ch. 35 to 40 at mins 250L at Gumgaon Mine MOIL/16-17/ET/127 2016 MOIL 169116-1 25-11-2016 21-12-2016 21-12-2016 21-12-2016 3:30 PM Active और देखें
21. SPARES FOR ATLAS COPCO MAKE ROCK BREAKER MB 1500 (PUR/MOIL/C-5/70/E-50/1508-M) 24-11-2016 09-12-2016 09-12-2016 09-12-2016 3:30 PM Active और देखें
22. PURCHASE OF SPARES FOR SDL AND LHD (PUR/MOIL/C-5/27/E-49/1498-M) 24-11-2016 09-12-2016 09-12-2016 09-12-2016 3:30 pm Active और देखें
23. Loading of broken metal of size plus 25 mm to minius 50mm into trucks by filling it in 1 MT Jumbo Bags in trucks at FMP Balaghat (SDGM (MECH)/FMP/2016-17/05) 23-11-2016 14-12-2016 14-12-2016 14-12-2016 3:30 pm Active और देखें
24. Construction of Sewerage Treatment Plant at Munsar Mine(Civil/HO/MUN/2016-17/50) 23-11-2016 22-12-2016 22-12-2016 22-12-2016 3:30 pm Active और देखें
25. Construction of Materials Store Building along with Boundary wall at Gumgaon Mine (Civil/HO/GUM/2016-17/55) 23-11-2016 23-12-2016 23-12-2016 23-12-2016 3:30 pm Active और देखें
26. Picking and collection of UKL-448 at Ukwa Mine (Gr.-I/CGM(PR)/CONT/R-DUMP/22/UK/2016-17/11) 22-11-2016 30-11-2016 30-11-2016 30-11-2016 3:30 PM Active और देखें
27. Interior Renovation Works for 6th Level Pit Top Office at Balaghat Mine. (83/Civil/BGT/16-17/5858 Date 18.11.2016) 21-11-2016 25-11-2016 25-11-2016 25-11-2016 4:00 PM Active और देखें
28. Construction of Centralised Shed for storage of annualy indented traction batteries and discharged ones beside Mine Workshop at Balaghat Mine. ( 83/Civil/BGT/16-17/5861 Date 18.11.2016 ) 21-11-2016 25-11-2016 25-11-2016 25-11-2016 4:00 PM Active और देखें
29. Providing and fixing ceiling and dis tempering at Agent Bungalow.(TE/CH/CIVIL/16-17/636 dated 08/11/2016) 19-11-2016 28-11-2016 28-11-2016 28-11-2016 03:30 PM Active और देखें
30. PURCHASE OF MULTIFUNCTION PRINTER - 13 NOS. (AS PER ANNEXURE - A ENCLOSED) (PUR/MOIL/C-4/138/E-53/1555-M DT.19/11/2016) 19-11-2016 09-12-2016 09-12-2016 09-12-2016 3:30 pm Active और देखें
31. PURCHASE OF LINE INTERACTIVE UPS - 76 NOS.(AS PER ANNEXURE - A ENCLOSED) (PUR/MOIL/C-4/138/E-54/1556-M DT.19/11/2016) 19-11-2016 09-12-2016 09-12-2016 09-12-2016 3:30 pm Active और देखें
32. PURCHASE OF EXPLOSIVE AND ACCESSORIES (WE-87 Dt.19/11/2016(e-Tender No.MOIL/16-17/ET/124)) 19-11-2016 21-12-2016 21-12-2016 21-12-2016 3:30 pm Active और देखें
33. Notice Inviting Tender for Repair of water supply pipeline from Bhatera Pumoing Station to Balaghat Mine and installation of air valves at Bhatera Pumping Station towards water supply scheme at Balaghat Mine.(83/Civil/BGT/16-17/5788 Date 16.11.2016) 18-11-2016 29-11-2016 29-11-2016 29-11-2016 04:00 PM Active और देखें
34. Making of Steaming Material ( Mud Plug ) use for blasting at Kandri Mine (KAN/MINES/16-17/152 Dt. 16.11.2016) 18-11-2016 25-11-2016 25-11-2016 25-11-2016 03:30 PM Active और देखें
35. PURCHASE OF SAP LICENSES WITH AMC (AS PER ANNEXURE - A ENCLOSED) (PUR/MOIL/C-4/138/E-52/1551-M DT.18/11/2016) 18-11-2016 28-11-2016 28-11-2016 28-11-2016 03:30 PM Active और देखें
36. Transportation of sand from Kanhan River to sand stowing plant at Gumgaon mine (GM(M)-III/SAND/CONT/34/GUM/2016-17/38) 17-11-2016 22-11-2016 22-11-2016 22-11-2016 03:30 PM Active और देखें
37. Core drilling of borehole for High Speed Shaft at Balaghat Mine (NQ size).(MOIL/16-17/Expl/BGT/284,ET-121, dated 15. 11.2016) 17-11-2016 08-12-2016 08-12-2016 08-12-2016 03:30 PM Active और देखें
38. Construction of Sewerage Treatment Plant at Beldongri Mines (Civil/HO/BEL/2016-17/51) 17-11-2016 16-12-2016 16-12-2016 16-12-2016 03:30 PM Active और देखें
39. Construction and erection of Precast Pre stressed concrete elements for under ground supports at Balaghat Mine (Civil/HO/16-17/BGT/57 DT.08/11/2016) 16-11-2016 30-11-2016 30-11-2016 30-11-2016 03:30 PM Active और देखें
40. PURCHASE OF ELECON MAKE - THRUSTER BRAKE ASSEMBLY - 2 NOS. AND FULL BRAKE DRUM COUPLING - 2 NOS.FOR HOLMES SHAFTS CAGE AND SKIP WINDERS OPERATING AT BALAGHAT MINE (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/269/E-51/1535-M DT.15/11/2016) 16-11-2016 30-11-2016 30-11-2016 30-11-2016 03:30 PM Active और देखें
41. Maintenance and Operation of Water Supply Scheme at Balaghat Mine (Civil/HO/16-17/BGT/52) 16-11-2016 14-12-2016 14-12-2016 14-12-2016 03:30 PM Active और देखें
42. Picking and collection of material from waste dumps at Sitapatore Mine (GR.-II/GM(M)/CONT/R-DUMP/49/SITA/2016-17/39) 15-11-2016 24-11-2016 24-11-2016 24-11-2016 03:30 PM Active और देखें
43. Picking and collection of material from waste dumps at Chikla Mine (GR.-II/GM(M)/CONT/R-DUMP/47/CH/2016-17/40) 15-11-2016 24-11-2016 24-11-2016 24-11-2016 03:30 PM Active और देखें
44. Sample Collection, sample preparation and other associated works at Ferro Manganese Plant, Balaghat Mine (BGT/FMP/TE/2016-17/685 Date 13.11.2016) 14-11-2016 23-11-2016 23-11-2016 23-11-2016 04:00 PM Active और देखें
45. Operation of pumps for drinking water supply in camp area at Beldongri Mine.(Bel/Civil/Mine/AGT/2016-17/2368) 12-11-2016 21-11-2016 21-11-2016 21-11-2016 04:30 PM Active और देखें
46. Annual Repairing pf track components of SDL machine at Balaghat Mine (DGM/BGT/MECH/SDL/16-17/5627 Date 09.11.2016) 11-11-2016 23-11-2016 23-11-2016 23-11-2016 05:00 PM Active और देखें
47. Repair and maintenance contract for domestic electrical installation of residential and non residential buildings.(TE/CH/ELECT/16-17/638 dated 08/11/2016) 11-11-2016 23-11-2016 23-11-2016 23-11-2016 02:30 PM Active और देखें
48. STEEL CAGES - 4 NOS. (2 NOS.EACH FOR BALAGHAT AND BELDONGRI MINE) (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-90 DT.11/11/2016, e-TENDER NO.MOIL/16-17/ET/119) 11-11-2016 09-12-2016 09-12-2016 09-12-2016 03:30 PM Active और देखें
49. SPIRAL CLASSIFIER FOR BALAGHAT MINE - 1 NO. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-89 DT.11/11/2016, e-TENDER NO.MOIL/16-17/ET/118) 11-11-2016 23-12-2016 23-12-2016 23-12-2016 03:30 PM Active और देखें
50. Maintenance and operation of water supply scheme at Chikla Mine (TE/CH/MECH/Water Supply/16-17/582 dated 19/10/2016) 10-11-2016 17-11-2016 17-11-2016 17-11-2016 04:30 PM Active और देखें
51. Loading and Unloading of Oil Barrels, Steel sections and other materials with stacking.(TE/CH/MECH/STORE/16-17/629 dated 5/11/2016) 10-11-2016 17-11-2016 17-11-2016 17-11-2016 04:30 PM Active और देखें
52. Washing, picking and collection of material from East Side of A dump waste dump at Tirodi Mine (GR.-II/GM(M)/CONT/R-DUMP/50/TRD/2016-17/38) 09-11-2016 18-11-2016 18-11-2016 18-11-2016 03:30 PM Active और देखें
53. Maintenance of gardens at Balaghat Mine.(83/Civil/BGT/16-17/5591 Date 07.11.2016) 09-11-2016 11-11-2016 11-11-2016 11-11-2016 04:00 PM Active और देखें
54. Maintenance and operation of water supply scheme at Balaghat Mine.(83/Civil/BGT/16-17/5594 Date 07.11.2016) 09-11-2016 11-11-2016 11-11-2016 11-11-2016 04:00 PM Active और देखें
55. Picking and collection of material from contaminated ROM at Chikla Mine (GR.-II/GM(M)/CONT/CL-ROM/48/CH/2016-17/37) 09-11-2016 18-11-2016 18-11-2016 18-11-2016 03:30 PM Active और देखें
56. Construction of New Generator House for 1500 KVA, 11 KV DG Set and Chain link fencing for 33 KV Main Sub Station at Ukwa Mine.(Civil /HO/16-17/UK /56 Dated 08/11/2016) 09-11-2016 23-11-2016 23-11-2016 23-11-2016 03:30 PM Active और देखें
57. TRANSFORMER OIL - 13650 LTRS. (65 OIL BARRELS) FOR NOS(BALAGHAT), BALAGHAT MINE (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-88 DT.09/11/2016, e-TENDER NO.MOIL/16-17/ET/117) 09-11-2016 02-12-2016 02-12-2016 02-12-2016 03:30 PM Active और देखें
58. Exploratory core drilling of NQ size 47 mm core diameter at Kandri dongri Buzurg Mine and Nagardhan nandapuri area of MOIL (MOIL/16-17/Expl/BGT/266 Dt. 08.11.2016) 09-11-2016 09-12-2016 09-12-2016 09-12-2016 03:30 PM Active और देखें
59. PURCHASE OF PP MULTIFILAMENT FILTER CLOTH (PUR/MOIL/C-11/16/E-48/1484-M) 08-11-2016 28-11-2016 28-11-2016 28-11-2016 03:30 PM Active और देखें
60. Loading of Slag in to Trucks at Ferro Manganese Plant Balaghat Mine.(SDGM (MECH)/FMP/2016-17/04) 07-11-2016 29-11-2016 29-11-2016 29-11-2016 03:30 PM Active और देखें
61. Breaking of Metal in to the size of plus 25 mm to minus 50 mm, soring, filling in forma, stacking and screening with Plus 25 mm size screen of left out material at FMP Balaghat Mine.stacking and sBreaking of Metal in to the size of plus 25 mm to (SDGM (ME 07-11-2016 29-11-2016 29-11-2016 29-11-2016 03:30 PM Active और देखें
62. Interior Renovation Works for 6th Level Pit Top Office at Balaghat Mine (83/Civil/BGT/16-17/5521 Dated 04.11.2016) 07-11-2016 14-11-2016 14-11-2016 14-11-2016 04:30 PM Active और देखें
63. Construction of Centralised Shed for storage of annualy indented traction batteries and discharged ones beside Mine Workshop (83/Civil/BGT/16-17/5385 Dated 28.10.2016) 07-11-2016 14-11-2016 14-11-2016 14-11-2016 04:30 PM Active और देखें
64. Replacement of Old Worn Out Steel Doors and Windows with new steel doors and steel windows for Camp Quarters at Balaghat Mine.(83/Civil/BGT/16-17/5497 Date 03.11.2016) 07-11-2016 14-11-2016 14-11-2016 14-11-2016 04:00 PM Active और देखें
65. EOI for Internet Leased Line at MOIL Limited (Sys/Internet/2016-17/12) 07-11-2016 25-11-2016 25-11-2016 25-11-2016 03:30 PM Active और देखें
66. Breaking of Slag and other associated works at Ferro Manganese Plant Balaghat Mine.(SDGM (MECH)/FMP/2016-17/03) 07-11-2016 29-11-2016 29-11-2016 29-11-2016 03:30 PM Active और देखें
67. EPABX SYSTEM - 4 SETS. (1 SET.EACH FOR BALAGHAT, DONGRI BUZURG, TIRODI AND UKWA MINE (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-39 DT.07/11/2016, e-TENDER NO.MOIL/16-17/ET/113) 07-11-2016 21-12-2016 21-12-2016 21-12-2016 03:30 PM Active और देखें
68. Loading, unloading and transportation of Hutcvh by Mech. means from Hutch slime pond etc. Balaghat Mine (Gr.-I/CGM(PR)/CONT/LOADING/17/BGT/16-17/10) 05-11-2016 11-11-2016 11-11-2016 11-11-2016 03:30 PM Active और देखें
69. PURCHASE OF COMPANY CALENDAR (PUR/MOIL/C-12/26/E-47/1482-M Dt. 04/11/2016) 04-11-2016 21-11-2016 21-11-2016 21-11-2016 03:30 PM Active और देखें
70. SPARES FOR MATHER AND PLATT MAKE WATER PUMPS (PUR/MOIL/C-5/23/E-41/1271-M) 04-11-2016 16-11-2016 16-11-2016 16-11-2016 03:30 PM Active और देखें
71. SPARES FOR SANDVIK MAKE JUMBO DRILLING MACHINE (PUR/MOIL/C-5/23/E-42/1304-M) 04-11-2016 18-11-2016 18-11-2016 18-11-2016 03:30 PM Active और देखें
72. Providing, making and fixing fabricated glow sign board for MOIL Bhawan Nagpur (Civil / HO / 16-17 / HO /54) 04-11-2016 11-11-2016 11-11-2016 11-11-2016 03:30 PM Active और देखें
73. PURCHASE OF SPARES FOR THREAD ROLLING MACHINE (PUR/MOIL/C-5/23/E-46/1446-M) 01-11-2016 07-11-2016 07-11-2016 07-11-2016 03:30 PM Active और देखें
74. FABRICATION OF STEEL MEASURING FRAME FOR BDC AND OCF WORK AT CHIKLA MINE (TE/CH/MECH/MF/16-17/605 DATED 22/10/2016) 28-10-2016 03-11-2016 03-11-2016 03-11-2016 03:30 PM Active और देखें
75. Construction of Centralized shed for storage of annually indented traction batteries and discharged ones beside mine workshop at, Balaghat Mine.(83/BGT/CIVIL/2016-17/5385 DT. 28.10.2016) 28-10-2016 03-11-2016 03-11-2016 03-11-2016 04:30 PM Active और देखें
76. Installation of sanitary Napkin Vending machine Ninety No. at Different location in Nagpur. Bhandara and Gondia District Under CSR (Civil /HO/16-17/ NGP /BHN/GND/CSR/53 Dt 27.10.16) 28-10-2016 16-11-2016 16-11-2016 16-11-2016 03:30 PM Active और देखें
77. Supplying, providing, installation and commissioning of CCTV Surveillance System at various locations of MOIL Bhawan, Nagpur (SDGM(E)/86/ HO/16-17/ 240 dated 27/10/2016) 28-10-2016 22-11-2016 22-11-2016 22-11-2016 03:30 PM Active और देखें
78. COLLECTING AND REMOVING OF ASH (MOIL/EMD/CH/AGDM/2016-17/610) 27-10-2016 08-11-2016 08-11-2016 08-11-2016 04:30 PM Active और देखें
79. Picking and collection of material from siding waste dump at Tirodi Mine. (GR.-II/GM(M)/CONT/R-DUMP/45/TRD/2016-17/36) 27-10-2016 08-11-2016 08-11-2016 08-11-2016 03:30 PM Active और देखें
80. TIPPERS (10 TON CAPACITY) - 2 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-69 DT.27/10/2016, e-TENDER NO.MOIL/16-17/ET/112) 27-10-2016 30-11-2016 30-11-2016 30-11-2016 03:30 PM Active और देखें
81. Construction of Two wheeler parking Shed at Gumgaon Mine (CIVIL/16-17/GUM/2120 Dt. 25.10.2016) 26-10-2016 10-11-2016 10-11-2016 10-11-2016 03:30 PM Active और देखें
82. Designing, supply, fabrication, installation and commissioning of Hydraulic Power Pack system for operation of Fines Jig at IMB Plant, Balaghat Mine. (DGM/BGT/MECH/IMBP/15-16/5055 DT. 13/10/2016) 26-10-2016 10-11-2016 10-11-2016 10-11-2016 4:40 PM Active और देखें
83. FABRICATION OF BEARING PLATES OF ROOF BOLTS FOR 2016-17 AT BALAGHAT MINE (DGM/BGT/MECH/IMBP/15-16/5307 DT. 26/10/2016) 26-10-2016 11-11-2016 11-11-2016 11-11-2016 4:40 PM Active और देखें
84. WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR ONE YEAR BLANKET RATE CONTRACT UNDER MVC PROGRAM OF HP FOR SUPPLY OF TONERS/CARTRIDGES FOR HP MAKE PRINTER/ALL IN ONE PRINTER (PUR/MOIL/C-12/1/E-45/1426-M Dt. 26/10/2016) 26-10-2016 18-11-2016 18-11-2016 18-11-2016 3:30 PM Active और देखें
85. SCHOOL BUS - 2 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-70 DT.26/10/2016, e-TENDER NO.MOIL/16-17/ET/111) 26-10-2016 25-11-2016 25-11-2016 25-11-2016 3:30 PM Active और देखें
86. e-procurement of Tub Wheel and Axle Assembly (WE-86 e-tender No.MOIL/16-17/ET-109, Dt.25.10.2016) 25-10-2016 29-11-2016 29-11-2016 29-11-2016 03:30 PM Active और देखें
87. Hiring of Services of Architect and Design Engineering Firm for proposed Construction of surface Infrastructure Buildings for 2 Vertical Shaft at Chikla Mine.(Civil /HO/16-17/CH/48 Dated - 24/10/2016) 25-10-2016 11-11-2016 11-11-2016 11-11-2016 03:30 PM Active और देखें
88. Water Supply Distribution System at Village Chikla Distt. Bhandara Under CSR.(Civil /HO/CSR/16-17/CH/49 Dated - 24/10/2016) 25-10-2016 11-11-2016 11-11-2016 11-11-2016 03:30 PM Active और देखें
89. HYDRAULIC EXCAVATOR (BACKHOE) WITH HEAVY DUTY BUCKET CAPACITY MINIMUM 5.50 m3 - 1 No. FOR DONGRI BUZURG MINE (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-73 DT.25/10/2016, e-TENDER NO.MOIL/16-17/ET/110) 25-10-2016 29-11-2016 29-11-2016 29-11-2016 03:30 PM Active और देखें
90. Annual repairs and maintenance contract for domestic electrical installation of residential and non-residential buildings at Dongri Buzurg Mine.(DB/ELECT/16-17/602 Date- 22.10.2016) 24-10-2016 04-11-2016 04-11-2016 04-11-2016 04.30PM Active और देखें
91. e-procurement of CONVEYOR BELT -6 items (WE-84 e-tender No.MOIL/16-17/ET-108, Dt.24.10.2016) 24-10-2016 29-11-2016 29-11-2016 29-11-2016 03:30 PM Active और देखें
92. Augmentation of 11 KV Overhead Line from mine substation to MSEDCL Substation at Goberwahi, construction of HT Point of supply and providing and laying of 11 KV Grade Cable at Chikla Mine. (SDGM(E)/11/ CKW/16-17/ 236 dated 20/10/2016) 21-10-2016 16-11-2016 16-11-2016 16-11-2016 3:30 PM Active और देखें
93. CONSTRUCTION OF PAVING BLOCK PATHWAY FOR OLD A TYPE QUARTERS AT GUMGAON MINE. (CIVIL/HO/16-17/GUM/46 Date 21.10.2016) 21-10-2016 11-11-2016 11-11-2016 11-11-2016 3:30 PM Active और देखें
94. Picking and collection of material from Durga Pit waste dump at Tirodi Mine (GR.-II/GM(M)/CONT/R-DUMP/43/TRD/2016-17/35) 20-10-2016 27-10-2016 27-10-2016 27-10-2016 3:30 PM Active और देखें
95. Picking and collection of material from South side of Siding dump (waste dump) at Tirodi Mine (GR.-II/GM(M)/CONT/R-DUMP/44/TRD/2016-17/34) 20-10-2016 27-10-2016 27-10-2016 27-10-2016 3:30 PM Active और देखें
96. Modification of existing compressor house near vertical shaft for installation of Transformer and Panels at Ukwa Mine ( A andSr DyGM(M)/Civil/UM/16-17/2029 ) 20-10-2016 05-11-2016 05-11-2016 05-11-2016 4:30 PM Active और देखें
97. Maintenance of Gardens at Ukwa Mine (A andSr DyGM(M)/Civil/UM/16-17/2026) 20-10-2016 05-11-2016 05-11-2016 05-11-2016 4:30 PM Active और देखें
98. HDPE Bags (PUR/MOIL/C-11/6/WE-83 (MOIL16-17/ET/107)) 20-10-2016 18-11-2016 18-11-2016 18-11-2016 3:30 PM Active और देखें
99. Annual repairs to camp quarters at Tirodi Mine (Civil /HO/16-17 /TRD/44 Dated - 17/10/2016) 19-10-2016 26-10-2016 26-10-2016 26-10-2016 3:30 PM Active और देखें
100. Maintenance of sanitary pipe line, cleaning of drain and removing of garbage from dust bins placed at CMD Bungalow, MOIL Bhawan, CMS and Sport complex HO Nagpur (Civil /HO/16-17 /HO/45 Dated - 17/10/2016) 19-10-2016 26-10-2016 26-10-2016 26-10-2016 3:30 PM Active और देखें

निविदाएं अधिक जानकारी

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

(2024) वर्ष के निविदाएं देखें
(2023) वर्ष के निविदाएं देखें
(2022) वर्ष के निविदाएं देखें
(2021) वर्ष के निविदाएं देखें
(2020) वर्ष के निविदाएं देखें
(2019) वर्ष के निविदाएं देखें
(2018) वर्ष के निविदाएं देखें
(2017) वर्ष के निविदाएं देखें
(2016) वर्ष के निविदाएं देखें
(2015) वर्ष के निविदाएं देखें
(2014) वर्ष के निविदाएं देखें
(2013) वर्ष के निविदाएं देखें
(2012) वर्ष के निविदाएं देखें
(24) वर्ष के निविदाएं देखें
पूर्ण निविदा पुरालेख देखें
सभी मॉयल निविदाएं देखें