निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Construction of barbed wire fencing at near 6 No. at Tirodi Mine (TRD/CIVIL/A/2016-17/2969 Dt 12.01.2017) | 14-01-2017 | 21-01-2017 | 21-01-2017 | 21-01-2017 | 4:30 PM | Active | और देखें |
2. | Purchase of Gravel (Black Gitti) for U/G Concreting work at Ukwa Mine (Gr.-I/CGM(PR)/CONT/GITTI/26/UK/2016-17/14) | 13-01-2017 | 23-01-2017 | 23-01-2017 | 23-01-2017 | 3:30 PM | Active | और देखें |
3. | PURCHASE OF SPARES FOR KIRLOSKAR MAKE COMPRESSOR (PUR/MOIL/C-5/38/E-63/1725-M ) | 12-01-2017 | 25-01-2017 | 25-01-2017 | 25-01-2017 | 3:30 PM | Active | और देखें |
4. | PURCHASE OF SAPRES FOR DRUM COUPLING (PUR/MOIL/C-5/33/E-64/1752-M) | 12-01-2017 | 25-01-2017 | 25-01-2017 | 25-01-2017 | 3:30 PM | Active | और देखें |
5. | Const of retaining cum barricade wall back side of pit office at Gumgaon Mine (Civil/16-17/GUM/3417 Date 10.01.2017) | 12-01-2017 | 20-01-2017 | 20-01-2017 | 20-01-2017 | 4:00 PM | Active | और देखें |
6. | Pathway and brick paving in front of Bio diversity park at Gumgaon Mine (Civil/16-17/Gum/3416 Date 10.01.2017) | 12-01-2017 | 20-01-2017 | 20-01-2017 | 20-01-2017 | 4:00 PM | Active | और देखें |
7. | PURCHASE OF SPARES FOR VENTRA LOCOMOTIVE (PUR/MOIL/C-5/58/E-65/1753-M ) | 12-01-2017 | 30-01-2017 | 30-01-2017 | 30-01-2017 | 3:30 PM | Active | और देखें |
8. | Operation and minor maintenance of water supply scheme at MOIL Bhawan, CMD Bungalow, C.M.S. with Type A Quarters and West Court with Guest House, Transit House and Bunsivilla compound area, MOIL, Nagpur. (Civil /HO/16-17 /HO/79 Dt- 11/01/2017) | 12-01-2017 | 27-01-2017 | 27-01-2017 | 27-01-2017 | 3:30 PM | Active | और देखें |
9. | Washing, picking and collection of material from East side of A dump (waste dump) at Tirodi Mine(MOIL/16-17/ET/145) | 12-01-2017 | 31-01-2017 | 31-01-2017 | 31-01-2017 | 03:30 PM | Active | और देखें |
10. | Wired Wireless Internet Leased Line at MOIL Limited ( Sys/Internet/2016-17/16 ) | 12-01-2017 | 02-02-2017 | 02-02-2017 | 02-02-2017 | 3:30 PM | Active | और देखें |
11. | e-procurement of Belt Conveyor Roller/Idler -38 Items (WE-106 e-tender No.MOIL/16-17/ET-162, Dt.12.01.17) | 12-01-2017 | 28-02-2017 | 28-02-2017 | 28-02-2017 | 3:30 PM | Active | और देखें |
12. | Requirement of chock sleeper at Gumgaon Mine (Mining/Gum/16-17/3418 dATE 10.01.2017) | 11-01-2017 | 20-01-2017 | 20-01-2017 | 20-01-2017 | 4:30 PM | Active | और देखें |
13. | e-procurement of Cage Suspension Gear - 3 items. (WE-100 e-tender No.MOIL/16-17/ET-161, Dt.11.01.17) | 11-01-2017 | 14-02-2017 | 14-02-2017 | 14-02-2017 | 3:30 PM | Active | और देखें |
14. | Supplying, providing, installation and commissioning of Centralized UPS and required wiring for computers of office buildings at Balaghat, Tirodi in MP and Chikla, Dongri Buzurg, Gumgaon, Munsar and Kandri Mine in Maharashtra. (SDGM(E)/86/ HO/16-17/ 280) | 10-01-2017 | 30-01-2017 | 30-01-2017 | 30-01-2017 | 3:30 PM | Active | और देखें |
15. | Construction of Gard Room, Waiting Room near Mine Gate at Kandri Mine. (CIVIL/HO/16-17/KAN/77 Dt 09/01/2017) | 10-01-2017 | 31-01-2017 | 31-01-2017 | 31-01-2017 | 3:30 PM | Active | और देखें |
16. | Washing, Picking and collection of material from South West side of A dump at Tirodi Mine (Gr.II/GM(M)/CONT/R-Dump/61/TRD/2016-17/48) | 09-01-2017 | 18-01-2017 | 18-01-2017 | 18-01-2017 | 3:30 PM | Active | और देखें |
17. | Picking and collection of material from diluted ROM at South Pit of Tirodi Mine. (Gr.II/GM(M)/CONT/CL-ROM/62/TRD/2016-17/49) | 09-01-2017 | 18-01-2017 | 18-01-2017 | 18-01-2017 | 3:30 PM | Active | और देखें |
18. | Hiring of Services of Architect and Design Engineering Firm for proposed Construction of surface Infrastructure Buildings for 2 Vertical Shaft at Munsar Mine.(The Project Cost is estimated to Rs. 4,00,00,000/- approximately) (Civil /HO/16-17/ Mun/76 Dt 09 | 09-01-2017 | 09-02-2017 | 09-02-2017 | 09-02-2017 | 3:30 PM | Active | और देखें |
19. | Underground Development work at -470 L of vertical section at Chikla Mine. (Gr.II/GM(M)/CONT/UG-DEV/60/CH/2016-17/47) | 07-01-2017 | 17-01-2017 | 17-01-2017 | 17-01-2017 | 3:30 PM | Active | और देखें |
20. | Breaking of steam coal into size range 25-75mm and stacking at Ferro Manganese Plant, Balaghat Mine. (BGT/FMP/TE/2016-17/834 Dated 04.01.2017) | 06-01-2017 | 12-01-2017 | 12-01-2017 | 12-01-2017 | 4:30 PM | Active | और देखें |
21. | Making and Supply of Stemming Material (Mud Plug) at Balaghat Mine (Gr.-I/CGM(PR)/CONT/MUD PLUG/25/BGT/2016-17/13) | 06-01-2017 | 16-01-2017 | 16-01-2017 | 16-01-2017 | 3:30 PM | Active | और देखें |
22. | Hiring of Architectural and Structural consultant for Construction of Guest House at Kandri Mine. ( The Project cost is estimated to Rs. 95,00,000 /- approximately)(CIVIL/HO/16-17/KAN/75 Dt- 05/01/2017) | 06-01-2017 | 19-01-2017 | 19-01-2017 | 19-01-2017 | 03:30 PM | Active | और देखें |
23. | Construction of Sewerage Treatment Plant at MOIL Bhavan Nagpur(Civil/HO/2016-17/74) | 06-01-2017 | 31-01-2017 | 31-01-2017 | 31-01-2017 | 03:30 PM | Active | और देखें |
24. | Sinking of new fan drift and allied development at Chikla Mine (MOIL/16-17/ET/150) | 06-01-2017 | 07-02-2017 | 07-02-2017 | 07-02-2017 | 3:30 PM | Active | और देखें |
25. | Steam Coal 650 MT(PUR/MOIL/C-11/102/WE-92 (MOIL/16-17/ET/148)) | 05-01-2017 | 25-01-2017 | 25-01-2017 | 25-01-2017 | 03:30 PM | Active | और देखें |
26. | Sodium Carbonate(PUR/MOIL/C-11/4/WE-96 (MOIL/16-17/ET/146)) | 05-01-2017 | 03-02-2017 | 03-02-2017 | 03-02-2017 | 03:30 PM | Active | और देखें |
27. | Picking and collection of 3rd grade and LGHS ore from diluted ROM at South pit of Tirodi Mine(MOIL/16-17/ET/147) | 05-01-2017 | 31-01-2017 | 31-01-2017 | 31-01-2017 | 03:30 PM | Active | और देखें |
28. | e-procurement of G.I.Wire Netting and S.S.Screen Cloth -9 items(WE-97 e-tender No.MOIL/16-17/ET-151, Dt.05.01.2017) | 05-01-2017 | 09-02-2017 | 09-02-2017 | 09-02-2017 | 03:30 PM | Active | और देखें |
29. | Picking and collection of small 25 per Mn (GML-464) from dumps through off the pit working at Gumgaon Mine(GM(M)-III/CONT/48/R-DUMP/GUM/16-17/47) | 04-01-2017 | 11-01-2017 | 11-01-2017 | 11-01-2017 | 03:30 PM | Active | और देखें |
30. | Underground concreting for stope block preparation at Munsar Mine(GM(M)-III/CONT/UG-CONC/49/MUN/16-17/46) | 04-01-2017 | 11-01-2017 | 11-01-2017 | 11-01-2017 | 03:30 PM | Active | और देखें |
31. | Rate Contract For One Year For Supply Of COMPRESSED OXYGEN GAS AND DISSOLVED ACETYLENE GAS(C-11/115/WE-93 (MOIL/16-17/ET/149)) | 04-01-2017 | 25-01-2017 | 25-01-2017 | 25-01-2017 | 03:30 PM | Active | और देखें |
32. | PURCHASE OF GREASE GUNS.(PUR/MOIL/C-1/203/E-68/1794-M Dt.04/01/2017) | 04-01-2017 | 27-01-2017 | 27-01-2017 | 27-01-2017 | 03:30 PM | Active | और देखें |
33. | Dump cutting for construction of New OCF at Munsar Mine(GM(M)-III/CONT/DUMP/MUN/16-17/44) | 03-01-2017 | 10-01-2017 | 10-01-2017 | 10-01-2017 | 03:30 PM | Active | और देखें |
34. | Collection and stacking of Mn ore through Vibrating screen at Munsar Mine(GM(M)-III/CONT/VBS/MUN/16-17/45) | 03-01-2017 | 10-01-2017 | 10-01-2017 | 10-01-2017 | 03:30 PM | Active | और देखें |
35. | Drilling of Borehole with pump and pipe line at Gudma camp Ukwa Mine(A andSr DyGM(M)/Civil/UM/16-17/2803) | 03-01-2017 | 17-01-2017 | 17-01-2017 | 17-01-2017 | 04:30 PM | Active | और देखें |
36. | Loading and unloading of explosives for blasting at Tirodi Mine.(Gr-II/GM(M)/CONT/EXP/56/TRD/2016-17/43) | 31-12-2016 | 10-01-2017 | 10-01-2017 | 10-01-2017 | 03:30 PM | Active | और देखें |
37. | Cleaning of surplus ROM of Pit No. 5 at Sitapatore and Sukli Mine(Gr-II/GM(M)/CONT/CL-ROM/58/SITA/2016-17/44) | 31-12-2016 | 10-01-2017 | 10-01-2017 | 10-01-2017 | 03:30 PM | Active | और देखें |
38. | Picking and collection of material from contaminated Low grade ROM at Dongri Buzurg Mine(GR.-II/GM(M)/CONT/CL-ROM/57/DB/2016-17/46) | 31-12-2016 | 10-01-2017 | 10-01-2017 | 10-01-2017 | 03:30 PM | Active | और देखें |
39. | Picking and collection of material from waste dumps at Sitapatore mine(GR.-II/GM(M)/CONT/R-DUMP/59/SITA/2016-17/45) | 30-12-2016 | 10-01-2017 | 10-01-2017 | 10-01-2017 | 03:30 PM | Active | और देखें |
40. | Hiring of Hydrologist and structural consultant services for water supply scheme at Gumgaon Mine(CIVIL/HO/16-17/GUM/73 DT. 28/12/2016) | 29-12-2016 | 17-01-2017 | 17-01-2017 | 17-01-2017 | 03:30 PM | Active | और देखें |
41. | Renovation of existing old Temples near Main Entrance Gate at MOIL Bhawan and East Court, MOIL, Nagpur.(Civil /HO/16-17 /HO/70 Dated - 27/12/2016) | 28-12-2016 | 04-01-2017 | 04-01-2017 | 04-01-2017 | 03:30 PM | Active | और देखें |
42. | Widening of existing approach Tar Road, Construction of entrance display board including implementation of mechanized automated gate at Main Security Check Post at Balaghat Mine.(Civil /HO/16-17 /BGT/72 Dated - 27/12/2016) | 28-12-2016 | 12-01-2017 | 12-01-2017 | 12-01-2017 | 03:30 PM | Active | और देखें |
43. | Construction of toilets at various places in Mine area at Balaghat Mine(Civil /HO/16-17 /BGT/71 Dated - 27/12/2016) | 28-12-2016 | 12-01-2017 | 12-01-2017 | 12-01-2017 | 03:30 PM | Active | और देखें |
44. | MAINTAINANCE OF MINE MANAGER BUNGLOW ADMINISTRATIVE BUILDING AND GARDEN SITAPATORE MINE(S-S/CIVIL/HO/2016-17 DATE 18/12/2016) | 23-12-2016 | 31-12-2016 | 31-12-2016 | 31-12-2016 | 04:00 PM | Active | और देखें |
45. | Unloading of raw materials at Ferro Manganese Plant Balaghat Mine(BGT/FMP/TE/2016-17/806 Date 22.12.2016) | 23-12-2016 | 03-01-2017 | 03-01-2017 | 03-01-2017 | 04:30 PM | Active | और देखें |
46. | Cleaning of surplus underground ROM at Beldongri Mine(GM(M)-III/CONT/46/ROM/BEL/2016-17/43) | 23-12-2016 | 30-12-2016 | 30-12-2016 | 30-12-2016 | 03:30 PM | Active | और देखें |
47. | Construction of retaining wall along the road side from 100 level to mine canteen at Chikla mine(Civil /HO/16-17 /CH/69 Dated - 23/12/2016) | 23-12-2016 | 04-01-2017 | 04-01-2017 | 04-01-2017 | 03:30 PM | Active | और देखें |
48. | Maintenance of existing fire protection system for MOIL Bhawan Nagpur(Civil /HO/16-17 /HO/68 Dated - 23/12/2016) | 23-12-2016 | 04-01-2017 | 04-01-2017 | 04-01-2017 | 03:30 PM | Active | और देखें |
49. | Laying of WBM road from old B type to rest house at Gumgaon Mine(CIVIL/16-17/GUM/3243 DATE 12.12.2016) | 22-12-2016 | 28-12-2016 | 28-12-2016 | 28-12-2016 | 04:30 PM | Active | और देखें |
50. | Picking and collection of Ferro grade ore from dumps at Munsar Mine(GM(M)-III/CONT/44/DUMP/MUN/2016-17/42) | 22-12-2016 | 29-12-2016 | 29-12-2016 | 29-12-2016 | 03:30 PM | Active | और देखें |
51. | Preperation of kaccha road inside the Neeri plantation area at Gumgaon Mine(CIVIL/16-17/GUM/3295 DATE 21.12.2016) | 22-12-2016 | 30-12-2016 | 30-12-2016 | 30-12-2016 | 04:30 PM | Active | और देखें |
52. | Drilling of 57 mm dia drill holes for installing cable bolts in Magneferous rock at -200 lvl at Gumgaon Mine(Mining/Gum/16-17/3297 dt 21.12.2016) | 22-12-2016 | 10-01-2017 | 10-01-2017 | 10-01-2017 | 04:30 PM | Active | और देखें |
53. | Concrete lining of Cross cut in new wide ore body at -200 LVL at Gumgaon(Mining/Gum/16-17/3296 dt 21.12.2016) | 22-12-2016 | 11-01-2017 | 11-01-2017 | 11-01-2017 | 04:30 PM | Active | और देखें |
54. | Construction of Gard Room, Waiting Room near Mine Gate at Kandri Mine. (CIVIL/HO/16- 17/KAN/67 Dt- 20/12/2016) | 21-12-2016 | 04-01-2017 | 04-01-2017 | 04-01-2017 | 3:30 PM | Active | और देखें |
55. | Construction of Siding Office near Siding at Kandri Mine.(CIVIL/HO/16-17/KAN/66 Dt- 20/12/2016) | 21-12-2016 | 04-01-2017 | 04-01-2017 | 04-01-2017 | 03:30 PM | Active | और देखें |
56. | SUPPLY, INSTALLATION, ERRECTION, TESTING AND COMMISSIONING OF WATER SOFTNER PLANT FOR NEW COMPRESSOR HOUSE AT MUNSAR MINE (A-III/MUN/16-17/1137 ) | 21-12-2016 | 14-01-2017 | 14-01-2017 | 14-01-2017 | 4:30 PM | Active | और देखें |
57. | OUT SOURCING OF PUMPING OPERATION AT UNDERGROUND VERTICAL SHAFT AT MUNSAR MINE FOR 12 MONTHS (A-III/MUN/16-17/1136 ) | 21-12-2016 | 13-01-2017 | 13-01-2017 | 13-01-2017 | 03:30 PM | Active | और देखें |
58. | TIMBER (Only Through e-procurement) (WE-76 DT.21/12/2016, e-TENDER NO.MOIL/16-17/ET/143) | 21-12-2016 | 20-01-2017 | 20-01-2017 | 20-01-2017 | 03:30 PM | Active | और देखें |
59. | Supply of black gitti at Gumgaon Mine(GM(M)-III/CONT/Gitti/43/GUM/2016-17/41) | 19-12-2016 | 27-12-2016 | 27-12-2016 | 27-12-2016 | 03:30 PM | Active | और देखें |
60. | Maintenance and operation of water supply scheme at Balaghat Mine.(Civil/BGT/Water-Supply/2016-17/6501 Date 16.12.16) | 17-12-2016 | 23-12-2016 | 23-12-2016 | 23-12-2016 | 04:30 PM | Active | और देखें |
61. | Desilting of Jackwell, Intake Well and repair to pipeline appurtences of Water Supply Scheme of Balaghat Mine(BGT/Civil/Water-Supply/6452 Date 14.12.2016) | 17-12-2016 | 23-12-2016 | 23-12-2016 | 23-12-2016 | 04:30 PM | Active | और देखें |
62. | Out sourcing of Pumping operation for under ground Vertical shaft 400 ft level at Gumgaon Mine (SDGM (MECH)/GUM/16-17/482) | 16-12-2016 | 09-01-2017 | 09-01-2017 | 09-01-2017 | 3:30 PM | Active | और देखें |
63. | Out sourcing of crushing and screening plant at Gumgaon Mine for twelve months (SDGM (MECH)/GUM/16-17/483) | 16-12-2016 | 09-01-2017 | 09-01-2017 | 09-01-2017 | 3:30 PM | Active | और देखें |
64. | PURCHASE OF RADIAL TUBELESS TYRES (PUR/MOIL/C-13/18/E-61/1716-M DT.16/12/2016) | 16-12-2016 | 26-12-2016 | 26-12-2016 | 26-12-2016 | 3:30 PM | Active | और देखें |
65. | Providing and fixing of False ceiling and dis tempering work at Agent Bungalow at Chikla Mine (TE/CH/CIVIL/16-17/725 dated 04/12/2016) | 15-12-2016 | 19-12-2016 | 19-12-2016 | 19-12-2016 | 3:30 PM | Active | और देखें |
66. | Loading, unloading and transportation of tubs at crushing and screening plant (surface) at Chikla Mine. (GR.-II/GM(M)/CONT/TUB/46/CH/2016-17/41) | 15-12-2016 | 23-12-2016 | 23-12-2016 | 23-12-2016 | 3:30 PM | Active | और देखें |
67. | REPAIRING ARM CYLINDER ASSEMBLY OF BE 700 NO.1 OPERATING AT DONGRI BUZURG MINE (AII/CHK/DB/MECH/16-17/757 dtd 14.12.2016) | 15-12-2016 | 21-12-2016 | 21-12-2016 | 21-12-2016 | 4:30 PM | Active | और देखें |
68. | REPAIRING OF IDLER AND SPROCKET ASSEMBLIES OF BEML DOZER BD 155 NO 3 AT DONGRI BUZURG MINE (AII/CHK/DB/MECH/16-17/759 DTD 14.12.2016) | 15-12-2016 | 21-12-2016 | 21-12-2016 | 21-12-2016 | 4:30 PM | Active | और देखें |
69. | REPAIRING OF TURBO CHARGER ASSEMBLY OF TATA HITACHI ZAXIS 450H NO 1 HYDRAULIC EXCAVATOR OPERATING AT DONGRI BUZURG MINE (AII/CHK/DB/MECH/16-17/758 dtd 14.12.2016) | 15-12-2016 | 20-12-2016 | 20-12-2016 | 20-12-2016 | 4:30 PM | Active | और देखें |
70. | Extension of Electrical Sub-station Building at 5th level at Balaghat Mine. (Civil /HO/16-17 /BGT/65 Dated - 14/12/2016) | 15-12-2016 | 23-12-2016 | 23-12-2016 | 23-12-2016 | 3:30 PM | Active | और देखें |
71. | Washing, picking and collection of material from North waste dump at Tirodi Mine (GR.-II/GM(M)/CONT/R-DUMP/55/TRD/2016-17/42) | 15-12-2016 | 23-12-2016 | 23-12-2016 | 23-12-2016 | 3:30 PM | Active | और देखें |
72. | Paving block flooring besides the substation building at Gumgaon Mine (CIVIL/16-17/GUM/3245 DATE 12.12.2016) | 15-12-2016 | 26-12-2016 | 26-12-2016 | 26-12-2016 | 4:00 pm | Active | और देखें |
73. | Dadoing and Skirting of bricks quarries of New office building at Gumgaon Mine (CIVIL/16-17/GUM/3242 DATE 12.12.2016) | 15-12-2016 | 26-12-2016 | 26-12-2016 | 26-12-2016 | 4:00 pm | Active | और देखें |
74. | PURCHASE OF PUZZOLANA MAKE SPARES OF VIBRATING SCREEN (PUR/MOIL/C-11/135/E-59/1693-M) | 14-12-2016 | 30-12-2016 | 30-12-2016 | 30-12-2016 | 3:30 pm | Active | और देखें |
75. | Construction of lease Boundry pillars, for Beldongri, Satak and Old Satak Mine at Beldongri Mine (Bel/Civil/Mine/AGT/2016-17/2647) | 13-12-2016 | 21-12-2016 | 21-12-2016 | 21-12-2016 | 4:30 PM | Active | और देखें |
76. | Quality improvement by separation of quartzite pieces from IVth grade stock at siding at Gumgaon Mine (Mining/Gum/16-17/3246 date 07.12.2016) | 13-12-2016 | 22-12-2016 | 22-12-2016 | 22-12-2016 | 4:30 pm | Active | और देखें |
77. | PURCHASE OF SWAM MAKE SPARES OF ROTARY BLOWER (PUR/MOIL/C-11/151/E-60/1695-M) | 13-12-2016 | 30-12-2016 | 30-12-2016 | 30-12-2016 | 3:30 pm | Active | और देखें |
78. | Construction of New Ore Cleaning Floor (OCF) at Munsar Mine (Civil/HO/16-17/58) | 13-12-2016 | 12-01-2017 | 12-01-2017 | 12-01-2017 | 3:30 PM | Active | और देखें |
79. | Construction of Cement Concrete Road from main check post towards PWD road, towards syndicate camp, railway crossing near canteen, EMD plant to office Building and premises of EMD plant Dongri Buzurg mine.(CIVIL/HO/16-17/DB/59) | 13-12-2016 | 13-01-2017 | 13-01-2017 | 13-01-2017 | 03:30 PM | Active | और देखें |
80. | Transportation of sand by mechanical means from Kalaphata Ghat situated on Pench river to sand stowing plant at Kandri, Beldongri and Munsar Mines (MOIL/16-17/ET/141 ) | 13-12-2016 | 18-01-2017 | 18-01-2017 | 18-01-2017 | 3:30 pm | Active | और देखें |
81. | Construction of ladies and gents toilet block for Ferro Manganese Plant. ( Civil/BGT/FMP/TE/16-17/6292 Date 07.12.2016 ) | 12-12-2016 | 19-12-2016 | 19-12-2016 | 19-12-2016 | 4:00 pm | Active | और देखें |
82. | Providing, supplying of Underground LED Fittings of Balaghat Mine. (BGT/TE/Elect/2016-17/6055 Date 28.11.2016) | 12-12-2016 | 15-12-2016 | 15-12-2016 | 15-12-2016 | 4:30 PM | Active | और देखें |
83. | Removal of Garbage cleaning of drains and septic tank etc. at camp qr at Ukwa Mine (16/Civil/UM/16-17/2602 Dated 11-12-2016) | 12-12-2016 | 26-12-2016 | 26-12-2016 | 26-12-2016 | 4:30 pm | Active | और देखें |
84. | Purchase of Field Cards Siemen Make spares required for 350HP Production Shaft Winder at Balaghat Mine (BGT/TE/Elect/2016-17/6054 Date 28.11.2016) | 12-12-2016 | 30-12-2016 | 30-12-2016 | 30-12-2016 | 3:30 pm | Active | और देखें |
85. | Providing and fixing vetrified tiles in time office at Tirodi Mine (TRD/CIVIL/A-2016-17/2635 Dated 08.12.2016) | 09-12-2016 | 16-12-2016 | 16-12-2016 | 16-12-2016 | 4:30 PM | Active | और देखें |
86. | Providing and laying of PVC/HDPE pipeline at upper and lower camp of Sitasaongi for ZP water supply(TE/CH/MECH/WATER SUPPLY/16-17/659 dated 12.11.2016) | 08-12-2016 | 13-12-2016 | 13-12-2016 | 13-12-2016 | 04:30 PM | Active | और देखें |
87. | Concrete lining of Cross cut in new wide ore body at -200 LVL at Gumgaon Mine (Mining/Gum/16-17/3209 date 07.12.2016) | 08-12-2016 | 15-12-2016 | 15-12-2016 | 15-12-2016 | 4:30 PM | Active | और देखें |
88. | Rainwater harvesting through V wire Injection well at Gumgaon Mine (CIVIL/16-17/GUM/3210 Date 07.12.2016) | 08-12-2016 | 20-12-2016 | 20-12-2016 | 20-12-2016 | 4:00 PM | Active | और देखें |
89. | Repair of water supply pipeline from Bhatera Pump Station to Balaghat Mine and installation of air valves at Bhatera Pumping Station towards water supply scheme of Balaghat Mine (83/Civil/BGT/16-17/5788 Date 16.11.2016) | 07-12-2016 | 09-12-2016 | 09-12-2016 | 09-12-2016 | 4:00 pm | Active | और देखें |
90. | Replacement of conductor of 3phase, 3wire 11 KV HTC Overhead line from electrical workshop s/so to 11KV/440 V outdoor S/so of Syndicate camp of Dongri Buzurg Mine. (DB/ELECT./16-17/732 ) | 07-12-2016 | 10-12-2016 | 10-12-2016 | 10-12-2016 | 4:30 PM | Active | और देखें |
91. | Drop riase from 3rd (minus 130 ft L) and fourth (minus 230 ft L) and its allied work at Munsar Mine(GM(M)-III/CONT/40/U/G-DEV/MUN/2016-17/40) | 07-12-2016 | 14-12-2016 | 14-12-2016 | 14-12-2016 | 03:30 PM | Active | और देखें |
92. | Replacement of conductor of 3phase, 3wire 11 KV HTC Overhead line from electrical workshop s/so to 11KV/440 V outdoor S/so of Syndicate camp of Dongri Buzurg Mine. (DB/ELECT./16-17/732 ) | 07-12-2016 | 10-12-2016 | 10-12-2016 | 10-12-2016 | 4:30 PM | Active | और देखें |
93. | PURCHASE OF LIQUID POLYMER (PUR/MOIL/C-12/23/E-58/ 1676-M) | 07-12-2016 | 21-12-2016 | 21-12-2016 | 21-12-2016 | 3:30 PM | Active | और देखें |
94. | Removal of waste rock and handling f dump ROM at Kandri Mine(GM(M)-III/CONT/35/OCD/KAN/2016-17/39) | 06-12-2016 | 14-12-2016 | 14-12-2016 | 14-12-2016 | 03:30 PM | Active | और देखें |
95. | PURCHASE OF INNER HARNESS FOR SAFETY HELMETS.(PUR/MOIL/C-1/210/E-57/1662-M Dt. 06/12/2016) | 06-12-2016 | 28-12-2016 | 28-12-2016 | 28-12-2016 | 03:30 PM | Active | और देखें |
96. | Desilting of Jackwell Intake Well and repair to pipeline appurtenances of Water Supply Scheme of Balaghat Mine.(83/Civil/BGT/WS/16-17/6132 Dated 30.11.2016) | 03-12-2016 | 09-12-2016 | 09-12-2016 | 09-12-2016 | 04:30 PM | Active | और देखें |
97. | Development Works comprising of horticultural works and allied misc civil works for barren land infront of newly constructed C-Type Quarters Executive Colony at Balaghat Mine.(83/Civil/BGT/16-17/6152 Dated 01.12.2016) | 03-12-2016 | 12-12-2016 | 12-12-2016 | 12-12-2016 | 04:00 PM | Active | और देखें |
98. | PURCHASE OF PEARL COKE - 2300 MT(PUR/MOIL/C-11/104/WE-91 (MOIL/16-17/ET/135)) | 03-12-2016 | 22-12-2016 | 22-12-2016 | 22-12-2016 | 03:30 PM | Active | और देखें |
99. | Supply, Installation and Commissioning Of Hydraulic Power pack for Bunker Discharge gates operating at Munsar Mine(A-III/MUN/16-17/1079) | 03-12-2016 | 23-12-2016 | 23-12-2016 | 23-12-2016 | 03:30 PM | Active | और देखें |
100. | FRVE HEADER BARS FOR ANODES - 372 NOS. AND CATHODES - 384 NOS. FOR EMD PLANT, DONGRI BUZURG MINE (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-95 DT.03/12/2016, e-TENDER NO.MOIL/16-17/ET/134) | 03-12-2016 | 11-01-2017 | 11-01-2017 | 11-01-2017 | 03:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |