निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Outsourcing skilled manpower for electrical maintenance work at sitapatore mine.(MOIL/HO/ELEC/2020/47 DATE 16/06/2020) | 01-12-2020 | 12-12-2020 | 12-12-2020 | 12-12-2020 | 03:30 PM | Active | और देखें |
2. | Repairing of Idler Assy-2 nos of Tata Hitachi 450-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1121) | 01-12-2020 | 04-01-2021 | 04-01-2021 | 04-01-2021 | 04:30 PM | Active | और देखें |
3. | Purchase of Steel Braided Hose-4 Items.(MOIL/20-21/ET-228 DT.01.12.2020) | 01-12-2020 | 29-12-2020 | 29-12-2020 | 30-12-2020 | 03:30 PM | Active | और देखें |
4. | Laying of GI Pipe Line 6 inch and 4 in underground at Chikla Mine(TE-13 DT.30112020) | 30-11-2020 | 12-12-2020 | 12-12-2020 | 12-12-2020 | 03:30 PM | Active | और देखें |
5. | CLEANING , SCREENING OF FERRO GRADE KD-4543 FROM SUBGRADE MINERAL REJECT FROM UNDERGROUND AT KANDRI MINE(KAN/MIN/AGT/NIT/20-21/3447 DT 24.11.2020) | 27-11-2020 | 04-12-2020 | 04-12-2020 | 04-12-2020 | 04:30 PM | Active | और देखें |
6. | Making and Supplying of Stemming material Mud Plug used for Blasting / fragmentation in U/G at various working levels at Balaghat Mine(MOIL/20-21/ET/217) | 27-11-2020 | 28-12-2020 | 28-12-2020 | 28-12-2020 | 03:30 PM | Active | और देखें |
7. | Pushing and unloading of tubs in underground and surface at vertical section and Ch.10800 section of Ukwa Mine(MOIL/20-21/ET/216) | 27-11-2020 | 28-12-2020 | 28-12-2020 | 28-12-2020 | 03:30 PM | Active | और देखें |
8. | e-Procurement of Iron Pan and Ore Cleaning Hammer(PUR/MOIL/C-1/196/WE-76/ET/226) | 27-11-2020 | 21-12-2020 | 21-12-2020 | 22-12-2020 | 03:30 PM | Active | और देखें |
9. | Tubeless Tyre Size 205 55 R16 10 Nos.(PUR/MOIL/C-13/18/E-31/363-M) | 26-11-2020 | 02-12-2020 | 02-12-2020 | 02-12-2020 | 03:30 PM | Active | और देखें |
10. | Purchase of Hose Fittings for Rock Drill and Air Leg Machines.(MOIL/20-21/ET-225 dt.25.11.2020) | 25-11-2020 | 16-12-2020 | 16-12-2020 | 17-12-2020 | 03:30 PM | Active | और देखें |
11. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SULLAIR COMPRESSOR.(PUR/MOIL/C-5/73/E-29 /352-M Dt. 25/11/2020) | 25-11-2020 | 14-12-2020 | 14-12-2020 | 14-12-2020 | 03:30 PM | Active | और देखें |
12. | Purchase of Pneumatic Tyre, Tube and Flaps and Solid Tyres(WE-35 dt.24.11.2020 (e-Tender no.MOIL/20-21/ET/224) | 24-11-2020 | 22-12-2020 | 22-12-2020 | 23-12-2020 | 03:30 PM | Active | और देखें |
13. | Picking and collection of Ferro Grade and SM Grade ore TD-4505, TDL-439 and TDL-499 from South Staff Quarter dump of Tirodi Mine(MOIL/20-21/ET/214) | 24-11-2020 | 24-12-2020 | 24-12-2020 | 24-12-2020 | 03:30 PM | Active | और देखें |
14. | Recovery of Ferro grade TD-4505 and SM Grade ore TDL-439 and TDL-499 from North Magazine Dump at Tirodi Mine(MOIL/20-21/ET/213) | 24-11-2020 | 24-12-2020 | 24-12-2020 | 24-12-2020 | 03:30 PM | Active | और देखें |
15. | Picking and collection of 3rd Grade and LGHS ore from diluted ROM at South Pit North side of Tirodi Mine(MOIL/20-21/ET/215) | 24-11-2020 | 24-12-2020 | 24-12-2020 | 24-12-2020 | 03:30 PM | Active | और देखें |
16. | DAILY (HIGH SPEED DIESEL FILLING IN HEMMS AT DONGRIBUZURG MINE(DB/MECH/20-21/JGM(MECH)/1075) | 23-11-2020 | 02-12-2020 | 02-12-2020 | 02-12-2020 | 04:30 PM | Active | और देखें |
17. | Pushing of tubs from SDL faces at Gumgaon Mine(MOIL/20-21/ET/210) | 23-11-2020 | 23-12-2020 | 23-12-2020 | 23-12-2020 | 03:30 PM | Active | और देखें |
18. | Cleaning of surplus contaminated ROM at Chikla B section of Chikla Mine(MOIL/20-21/ET/211) | 23-11-2020 | 23-12-2020 | 23-12-2020 | 23-12-2020 | 03:30 PM | Active | और देखें |
19. | Sinking of winzes from plus 60 Level to -70 Level at zero deposit of Chikla B section at Chikla Mine(MOIL/20-21/ET/212) | 23-11-2020 | 23-12-2020 | 23-12-2020 | 23-12-2020 | 03:30 PM | Active | और देखें |
20. | Purchase of G. I. Core Boxes(WE-67 dt.23.11.2020 (e-Tender no.MOIL/20-21/ET/223) | 23-11-2020 | 18-12-2020 | 18-12-2020 | 19-12-2020 | 03:30 PM | Active | और देखें |
21. | e-Procurement of Rubber Tub Buffer(PUR/MOIL/C-12/13/WE-68/ET/222) | 21-11-2020 | 21-12-2020 | 21-12-2020 | 22-12-2020 | 03:30 PM | Active | और देखें |
22. | PURCHASE OF DENSITY MEASUREMENT KIT(PUR/MOIL/C-12/23/E-30/356-M DT.20.11.2020) | 20-11-2020 | 09-12-2020 | 09-12-2020 | 09-12-2020 | 03:30 PM | Active | और देखें |
23. | Transportation of Sand from Bawanthadi River lease to Chikla Mine(MOIL/20-21/ET/209) | 20-11-2020 | 21-12-2020 | 21-12-2020 | 21-12-2020 | 03:30 PM | Active | और देखें |
24. | Removal of waste rock in F W H W and manganiferous rock from Ch-52 to Ch-60 at Dongri Buzurg Mine(MOIL/20-21/ET/218) | 20-11-2020 | 24-12-2020 | 24-12-2020 | 24-12-2020 | 03:30 PM | Active | और देखें |
25. | Concreting by using Pre Cast Slabs at Gumgaon Mine(MOIL/20-21/ET/208) | 20-11-2020 | 21-12-2020 | 21-12-2020 | 21-12-2020 | 03:30 PM | Active | और देखें |
26. | Transportation of manganese ore from Gumgaon mine siding to Kandri Mine siding(MOIL/20-21/ET/207) | 20-11-2020 | 01-12-2020 | 01-12-2020 | 01-12-2020 | 03:30 PM | Active | और देखें |
27. | e-Procurement of Butterfly Valves(PUR/MOIL/C-1/202/WE-71/ET/221) | 19-11-2020 | 08-12-2020 | 08-12-2020 | 09-12-2020 | 03:30 PM | Active | और देखें |
28. | PURCHASE OF SPARES FOR AUTOMATED DIESEL DISPENSING ASSY MAKE HECTRONIC FOR DONGRI BUZURG MINE(DB/MECH/20-21/MECH/1056) | 18-11-2020 | 08-12-2020 | 08-12-2020 | 08-12-2020 | 04:30 PM | Active | और देखें |
29. | CLEANING OF SPILLAGE ORE AND FINES FROM VARIOUS PLACES OF IMB PLANT AT DONGRIBUZURG MINE(DB/MECH/IMB/20-21/1057) | 17-11-2020 | 21-11-2020 | 21-11-2020 | 21-11-2020 | 04:30 PM | Active | और देखें |
30. | Purchase of Motors various types - 32 Lots.(Only Through e-procurement)(WE-41 DT.17/11/2020 (ET/220)) | 17-11-2020 | 09-12-2020 | 09-12-2020 | 10-12-2020 | 03:30 PM | Active | और देखें |
31. | Regular clearing of main bunker ore flow in IMB plant at Dongri Buzurg Mine(DB/MECH/IMB/20-21 /1055) | 16-11-2020 | 21-11-2020 | 21-11-2020 | 21-11-2020 | 04:30 PM | Active | और देखें |
32. | Repairing of Sprocket Assy of Tata Hitachi 450-2 and Tata Hitachi 1200-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1042) | 14-11-2020 | 28-12-2020 | 28-12-2020 | 28-12-2020 | 04:30 PM | Active | और देखें |
33. | Design, Manufacture and supply plumber block-1Set for pinion Shaft of Production shaft winder at Balaghat Mine(AGENT/BGT/MECH/20-21/869) | 14-11-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 04:30 PM | Active | और देखें |
34. | Painting of various structures of Winding Engine Installations , Waste Rock bunker and spillage bunker(AGT/BGT/MECH/WINDER/20-21/871) | 14-11-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 04:30 PM | Active | और देखें |
35. | Repairs to BDC shed and development of surrounding area by excavation and filling at Kandri Mine.(KD/CIVIL/NIT/20-21/3326 DT 13.11.2020) | 14-11-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 04:30 PM | Active | और देखें |
36. | Hiring of Diesel Jeep for the period of three months at Balaghat Mine(AGT/BGT/MECH/JEEP/20-21/867) | 13-11-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 04:30 PM | Active | और देखें |
37. | Procurement of Ceiling Fans 1200MM for residential Camp, Dongri Buzurg Mine(DB/ELECT/20-21/832 DATED 19.09.2020) | 13-11-2020 | 24-11-2020 | 24-11-2020 | 24-11-2020 | 04:30 PM | Active | और देखें |
38. | Tender invited in single bid system for Proposal for the providing, designing, fabrication, installation, and commissioning of Motorized Gate for mine workshop at Chikal Mine(TE/CH/MECH/20-21/14) | 13-11-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 03:30 PM | Active | और देखें |
39. | Procurement of 4 Nos Brake Tie rods for Production shaft Winder at Balaghat Mine.(AGENT/BGT/MECH/20-21/ 870) | 13-11-2020 | 04-12-2020 | 04-12-2020 | 04-12-2020 | 04:30 PM | Active | और देखें |
40. | Procurement of 3 nos Tie rods for Holmes shaft Skip Winder at Balaghat Mine.(AGENT/BGT/MECH/20-21/860) | 12-11-2020 | 02-12-2020 | 02-12-2020 | 02-12-2020 | 04:30 PM | Active | और देखें |
41. | Purchase Of MF Drill Rods 10nos and 57 mm Button Bits 2nos for Cable Bolting Operation through UDM - 601 at Chikla Mine(TE-12 DT.12112020) | 12-11-2020 | 02-12-2020 | 02-12-2020 | 02-12-2020 | 04:30 PM | Active | और देखें |
42. | Breaking of Metal and associated works at Ferro Manganese Plant, Balaghat Mine(MOIL/20-21/ET/190) | 12-11-2020 | 11-12-2020 | 11-12-2020 | 11-12-2020 | 03:30 PM | Active | और देखें |
43. | Procurement of 55Nos. 2V Lead Acid batteries for substation of Balaghat Mine(BGT/ELECT/20-21/849) | 11-11-2020 | 03-12-2020 | 03-12-2020 | 03-12-2020 | 04:30 PM | Active | और देखें |
44. | e Procurement of White Metal R. C. Tandem(PUR/MOIL/C-1/192/WE-69/ET/206) | 11-11-2020 | 17-12-2020 | 17-12-2020 | 18-12-2020 | 03:30 PM | Active | और देखें |
45. | Providing and Installation of Driver Fatigue Monitoring Systems in Dumpers Operating at Dongri Buzurg Mine | 10-11-2020 | 24-11-2020 | 24-11-2020 | 24-11-2020 | 4:30 pm | Active | और देखें |
46. | WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR FORKLIFT MAKE VOLTAS FOR DONGRI BUZURG MINE | 10-11-2020 | 01-12-2020 | 01-12-2020 | 01-12-2020 | 4:30 pm | Active | और देखें |
47. | Repairing of toilet of Master bed room at Mine Manager Bunglow at Balaghat Mine | 10-11-2020 | 17-11-2020 | 17-11-2020 | 17-11-2020 | 4:30 pm | Active | और देखें |
48. | WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HYDRAULIC MOBILE CRANE OPERATING AT DONGRI BUZURG MINE | 10-11-2020 | 24-11-2020 | 24-11-2020 | 24-11-2020 | 4:30 pm | Active | और देखें |
49. | Repairing of Bhatera Pipe line at Balaghat Mine(CIVIL/BGT/T.E./2020-21/840 DT. 06.11.2020) | 10-11-2020 | 17-11-2020 | 17-11-2020 | 17-11-2020 | 04:30 PM | Active | और देखें |
50. | Loading of Metal (plus25 mm to minus50mm) into trucks at Ferro Manganese Plant, Balaghat Mine(MOIL/20-21/ET/189) | 10-11-2020 | 08-12-2020 | 08-12-2020 | 08-12-2020 | 03:30 PM | Active | और देखें |
51. | Fabrication and supply of complete ID FAN BLOWER ASSEMBLY with Motor for Boiler Scrubber at EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET-205 dt.10.11.2020) | 10-11-2020 | 03-12-2020 | 03-12-2020 | 04-12-2020 | 03:30 PM | Active | और देखें |
52. | Providing 6 mbps 1 is to 1 Internet Leased Line at Gumgaon Mine(ADGM/Grp-III/SYS/NW/20-21/1354) | 09-11-2020 | 17-11-2020 | 17-11-2020 | 17-11-2020 | 03:30 PM | Active | और देखें |
53. | Repairing of AC of TATA HITACHI 1200-1 AND TATA HITACHI 450-2 AT DONGRI BUZURG MINE(DB/MECH/20-21/JGM(MECH)/986) | 09-11-2020 | 25-11-2020 | 25-11-2020 | 25-11-2020 | 04:30 PM | Active | और देखें |
54. | Purchase of Cross Bit 57MM Dia suitable for Cable Bolting Machine.(MOIL/20-21/ET-204 dt.07.11.2020) | 07-11-2020 | 08-12-2020 | 08-12-2020 | 09-12-2020 | 03:30 PM | Active | और देखें |
55. | Automation of Pumping Operation at Kandri Mine(MOIL/20-21/ET/188) | 07-11-2020 | 07-12-2020 | 07-12-2020 | 07-12-2020 | 03:30 PM | Active | और देखें |
56. | Procurement of 11KV Aluminum Arial Air bunch XLPE Cable of 70Sqmm for EMD Plant, Dongri Buzurg Mine.(DB/ELECT/20-21/1026) | 06-11-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 04:30 PM | Active | और देखें |
57. | Purchase of Cable Bolting Accessories For cable Bolting machine.(MOIL/20-21/ET-203) | 05-11-2020 | 26-11-2020 | 26-11-2020 | 27-11-2020 | 03:30 PM | Active | और देखें |
58. | Loading Transportation and Unloading of Manganese Ore Rom(Bel/Min/NIT/20-21/1707) | 04-11-2020 | 13-11-2020 | 13-11-2020 | 13-11-2020 | 04:30 PM | Active | और देखें |
59. | PROCUREMENT OF 2 NOS. ELECTRICALLY OPERATED MONO BLOCK PUMP FOR 15TH LEVEL UNDERGROUND AT BALAGHAT MINE(PUR/MOIL/BGT/PUMP/20-21/817) | 04-11-2020 | 25-11-2020 | 25-11-2020 | 25-11-2020 | 04:30 PM | Active | और देखें |
60. | PURCHASE OF C.S. WHEEL ASSEMBLY WITH COVER FOR 4MT GB CAR IN UNDERGROUND LEVELS AT BALAGHAT MINE(PUR/MOIL/BGT/CS WHEEL /20-21/818) | 04-11-2020 | 25-11-2020 | 25-11-2020 | 25-11-2020 | 04:30 PM | Active | और देखें |
61. | PURCHASE OF ELECTRICALLY OPERATED HORIZONTAL SUBMERSIBLE PUMP FOR BALAGHAT MINE(PUR/MOIL/BGT/PUMP/20-21/819) | 04-11-2020 | 25-04-2020 | 25-11-2020 | 25-11-2020 | 04:30 PM | Active | और देखें |
62. | Loading Transportation and Unloading of Manganese Ore Rom(Bel/Min/NIT/20-21/1707) | 04-11-2020 | 13-11-2020 | 13-11-2020 | 13-11-2020 | 04:30 PM | Active | और देखें |
63. | Engagement of thr Consultant for Implementation of digitization projects for improvement in various processes in the Company(MOIL/20-21/ET/191) | 04-11-2020 | 18-12-2020 | 18-12-2020 | 18-12-2020 | 03:30 PM | Active | और देखें |
64. | e-procurement of Tub Coupling Chain and Pins(PUR/MOIL/C-12/6/WE-66/ET/201) | 04-11-2020 | 23-11-2020 | 23-11-2020 | 24-11-2020 | 03:30 PM | Active | और देखें |
65. | Automation of Pumping Operation at MOIL Bhawan, CMD Bungalow, CMS and Staff Quarters(MOIL/20-21/ET/187) | 04-11-2020 | 03-12-2020 | 03-12-2020 | 03-12-2020 | 03:30 PM | Active | और देखें |
66. | House Keeping Works in Mine office Building ,Mine Manager Bungalow, Rest House in Ukwa Mine(AGT/CIVIL/UK/LT/20-21/803) | 03-11-2020 | 10-11-2020 | 10-11-2020 | 10-11-2020 | 04:00 PM | Active | और देखें |
67. | CLEANING OF SPILLAGE ORE AND FINES FROM VARIOUS PLACES OF IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/IMB/20-21/978) | 27-10-2020 | 04-11-2020 | 04-11-2020 | 04-11-2020 | 04:30 PM | Active | और देखें |
68. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-26/315-M Dt. 27/10/2020) | 27-10-2020 | 18-11-2020 | 18-11-2020 | 18-11-2020 | 03:30 PM | Active | और देखें |
69. | Trench cutting in ore stacks at Beldongri Mine(MOIL/20-21/ET/186) | 26-10-2020 | 26-11-2020 | 26-11-2020 | 26-11-2020 | 03:30 PM | Active | और देखें |
70. | Pushing and unloading of tubs in Underground and surface at Ch.5000 1850 L of Ukwa Mine(MOIL/20-21/ET/184) | 26-10-2020 | 26-11-2020 | 26-11-2020 | 26-11-2020 | 03:30 PM | Active | और देखें |
71. | Removal of accumulated pebbles near sand stowing plants at Chikla Mine(MOIL/20-21/ET/185) | 26-10-2020 | 26-11-2020 | 26-11-2020 | 26-11-2020 | 03:30 PM | Active | और देखें |
72. | Underground concreting at -1850 L -1750 L and -1650 L of Ukwa Mine(MOIL/20-21/ET/183) | 26-10-2020 | 26-11-2020 | 26-11-2020 | 26-11-2020 | 03:30 PM | Active | और देखें |
73. | CLEANING AND SCREENING OF FERRO GRADE KD-4543 FROM SUBGRADE MINERAL AND REJECT AT KANDRI MINE(KAN/MIN/AGT/NIT/20-21/3121 DT 23.10.2020) | 24-10-2020 | 31-10-2020 | 31-10-2020 | 31-10-2020 | 04:30 PM | Active | और देखें |
74. | ERECTION OF 11KV OVERHEAD LINE FROM MINE WORKSHOP TO EMD PLANT(DB/ELECT/20-21/961) | 23-10-2020 | 13-11-2020 | 13-11-2020 | 13-11-2020 | 04:30 PM | Active | और देखें |
75. | Picking and collection of material to recover Ferro Grade KD-2272 ore from subgrade mineral rejects at Kandri Mine(MOIL/20-21/ET/182) | 23-10-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 03:30 PM | Active | और देखें |
76. | Picking and collection of 20 percent SM grade ore CHL-535 from cleaning of sub grade mineral reject from ROM at 320 L North-West section at Chikla Mine(MOIL/20-21/ET/192) | 23-10-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 03:30 PM | Active | और देखें |
77. | Cleaning of surplus underground ROM at Kandri Mine(MOIL/20-21/ET/181) | 23-10-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 03:30 PM | Active | और देखें |
78. | Construction of Toilet Block beside Road Weigh Bridge at Munsar Mine(Munsar/Civil/NIT/20-21/154 Date 20.10.2020) | 22-10-2020 | 30-10-2020 | 30-10-2020 | 30-10-2020 | 04:30 PM | Active | और देखें |
79. | Making and Supplying of stemming sticks material used for blasting in undergound at working levels at Balaghat Mine(CIVI/BGT/LT/AGT/20-21/761 DT. 21.10.2020) | 22-10-2020 | 02-11-2020 | 02-11-2020 | 02-11-2020 | 04:30 PM | Active | और देखें |
80. | DGPS Survey in the ML areas of MOIL Limited in Tirodi Mine of Madhya Pradesh State(MOIL/20-21/ET/136) | 21-10-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 03:30 PM | Active | और देखें |
81. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES.(PUR/MOIL/C-5/46/E-28/313-M Dt. 21/10/2020) | 21-10-2020 | 11-11-2020 | 11-11-2020 | 11-11-2020 | 03:30 PM | Active | और देखें |
82. | Construction of Electrical Panel Room for forced sand stowing in underground at Munsar Mine(Munsar/Civil/NIT/20-21/150 Date 20.10.2020) | 21-10-2020 | 30-10-2020 | 30-10-2020 | 30-10-2020 | 04:30 PM | Active | और देखें |
83. | Providing, Supplying, Installation and Commissioning of Siemens/ABB/Equivalent Make, Standby DC Drive with PLC System for Skip Winder at Gumgaon Mine(M.S) - 1 No.(2 Lots) (Only Through e-procurement)(WE-44 DT.21/10/2020 (ET/199)) | 21-10-2020 | 12-11-2020 | 12-11-2020 | 13-11-2020 | 03:30 PM | Active | और देखें |
84. | Purchase of Pneumatic Rock Drill Machines and Pusher Leg - 20 Nos.each(4 Lots.) for Various Mines (Only through e-procurement)(WE-45 DT.21/10/2020 (ET/200)) | 21-10-2020 | 12-11-2020 | 12-11-2020 | 13-11-2020 | 03:30 PM | Active | और देखें |
85. | Maintenance and operation of water supply scheme at Gumgaon Mine(MOIL/20-21/ET/153) | 20-10-2020 | 24-11-2020 | 24-11-2020 | 24-11-2020 | 03:30 PM | Active | और देखें |
86. | Maintenance of gardens at various places at Gumgaon Mine.(MOIL/20-21/ET/168) | 20-10-2020 | 24-11-2020 | 24-11-2020 | 24-11-2020 | 03:30 PM | Active | और देखें |
87. | Construction of cement concrete approch road up to crusher for second vertical shaft at Chikla Mine and Construction of RCC approch road and platform, drainage system and settling tank near crushing and screening plant at Chikla Mine(MOIL/20-21/ET/169) | 20-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | और देखें |
88. | Washing picking and collection of material from 5 No. dumps of Sitapatore Mine(MOIL/20-21/ET/178) | 20-10-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 03:30 PM | Active | और देखें |
89. | Annual repairs to camp quarters at Balaghat Mine.(MOIL/20-21/ET/170) | 20-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | और देखें |
90. | Cleaning of ROM recovered from 5 No. Pit of Sitapatore Sukli Mine(MOIL/20-21/ET/179) | 20-10-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 03:30 PM | Active | और देखें |
91. | Construction of compound wall between second vertical shaft and adjacent officer colony including allied development works around second vertical shaft at Munsar Mine.(MOIL/20-21/ET/171) | 20-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | और देखें |
92. | Cleaning of ROM recovered from ROM Pit No.6 at Sitapatore Mine(MOIL/20-21/ET/180) | 20-10-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 03:30 PM | Active | और देखें |
93. | Construction of cement concrete approch road up to crusher for second vertical shaft at Chikla Mine and Construction of RCC approch road and platform, drainage system and settling tank near crushing and screening plant at Chikla Mine(MOIL/20-21/ET/169) | 20-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | और देखें |
94. | MISCELLENEOUS ITEMS C CLASS AS PER ANNEX C FOR EMD PLANT,DB MINE(MOIL/EMD/CH/AJGM/20-21/949) | 19-10-2020 | 11-11-2020 | 11-11-2020 | 11-11-2020 | 04:00 PM | Active | और देखें |
95. | Recovery of Ferro grade TD-4505 and SM Grade ore TDL-439 and TDL-499 from North Magazine Dump at Tirodi Mine(MOIL/20-21/ET/177) | 19-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | और देखें |
96. | Washing Picking and collection of material from East side of A dump at Tirodi Mine(MOIL/20-21/ET/175) | 19-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | और देखें |
97. | Washing Picking and collection of material from South A waste dump at Tirodi Mine(MOIL/20-21/ET/176) | 19-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | और देखें |
98. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT MAKE PUMP FOR BALAGHAT MINE.(PUR/MOIL/C-5/28/E-25/289M Dt. 19/10/2020) | 19-10-2020 | 09-11-2020 | 09-11-2020 | 09-11-2020 | 03:30 PM | Active | और देखें |
99. | PURCHASE OF TELEPHONE EXCHANGE LINE CORDS AND MDF WITH MODULE FOR CHIKLA MINE(TE-11 DT.19102020) | 19-10-2020 | 03-11-2020 | 03-11-2020 | 03-11-2020 | 04:30 PM | Active | और देखें |
100. | INSTALLATION OF FATIGUE MONITORING SYSTEM IN BH 35-2 DUMPERS WITH MATERIAL AT MINE SITE TIRODI MINE(MOIL/HO/MECH/GEN/2020/229 DATED 14.09.2020) | 18-10-2020 | 23-10-2020 | 23-10-2020 | 24-10-2020 | 03:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |