निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Installation of paving Blocks at childrens park of south colony at Tirodi Mine.(MOIL/MOIL LIMITED/CMC/17/23-24/ET/17) | 04-08-2023 | 11-09-2023 | 11-09-2023 | 11-09-2023 | 03:30 PM | Active | और देखें |
2. | Outsourcing of Operation and General Maintenance of Industrial Pumps in Second outlet in Underground of Balaghat Mine for a period of 60 days by deploying Semiskilled underground manpower.(AGT/BGT/MECH/PUMP/23-24/755) | 02-08-2023 | 17-08-2023 | 17-08-2023 | 17-08-2023 | 04:30 PM | Active | और देखें |
3. | Providing, supplying and installation of 79 Mtrs radius lighting arrestor for Weigh Bridge at Kalaphata, Kandri mine(Agent/GrIII/23-24/688, Dated 02.08.2023) | 02-08-2023 | 21-08-2023 | 21-08-2023 | 22-08-2023 | 09:30 AM | Active | और देखें |
4. | Maintenance of Various garden at Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/759 Date 01.08.2023) | 01-08-2023 | 07-08-2023 | 07-08-2023 | 07-08-2023 | 04:30 PM | Active | और देखें |
5. | Cleaning of Drain,sewer lines of Camp colonies of Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/765 01) | 01-08-2023 | 07-08-2023 | 07-08-2023 | 07-08-2023 | 04:30 PM | Active | और देखें |
6. | Collection of Garbage from camp colonies at Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/764 Date 01.08.2023) | 01-08-2023 | 07-08-2023 | 07-08-2023 | 07-08-2023 | 04:30 PM | Active | और देखें |
7. | Outsourcing of Unskilled Manpower require for Monsoon, Pump helpers at Beldongri(AG/BL/MECH/23-24/645) | 31-07-2023 | 07-08-2023 | 07-08-2023 | 07-08-2023 | 04:30 PM | Active | और देखें |
8. | Hiring of 30hp tractor mounted diesel pump with tractor for 7no pit of Tirodi Mine(MOIL/TD01/MECH/GEN/2023/379 DT-15/07/2023) | 31-07-2023 | 08-08-2023 | 08-08-2023 | 08-08-2023 | 03:30 PM | Active | और देखें |
9. | Comprehensive AMC for EPBAX of Ukwa Mine for a period of 2 years(UK/ELECT/2023-24/750) | 31-07-2023 | 08-08-2023 | 08-08-2023 | 08-08-2023 | 04:30 PM | Active | और देखें |
10. | Drilling of Muck generation hole for production at 370 Level and 470 Level of Chikla Main section at Chikla Mine.(MINING/CH/T.E./23-24/600) | 31-07-2023 | 07-08-2023 | 07-08-2023 | 07-08-2023 | 04:30 PM | Active | और देखें |
11. | FABRICATION OF GUID SHOE FOR CAGE OF VERTICAL SHAFT AT CHIKLA MINE.(TE/CH/MECH/23-24/76-26800/594 DT. 26/07/2023) | 29-07-2023 | 07-08-2023 | 07-08-2023 | 07-08-2023 | 03:30 PM | Active | और देखें |
12. | VARIOUS REPAIR WORK TO BE CARRIED OUT AT C ANDS PLANT 1, 2 MATERIAL HANDLING PLANT AT CHIKLA MINE.(TE/CH/MECH/23-24/76-26884/591 DT. 26/07/2023) | 29-07-2023 | 08-08-2023 | 08-08-2023 | 08-08-2023 | 03:30 PM | Active | और देखें |
13. | LAYING AND FIXING OF GI PIPELINE 4 INCH AND 6 INCH AT HULLAGE ROAD IN UNDERGROUND,(TE/CH/MECH/23-24/76-26954/592 DT. 26/07/2023) | 29-07-2023 | 09-08-2023 | 09-08-2023 | 09-08-2023 | 03:30 PM | Active | और देखें |
14. | MAINTENANCE AND REPAIRING WORKS IN VERTICAL SHAFT AT CHIKLA MINE.(TE/CH/MECH/23-24/76-26795/593 DT. 26/07/2023) | 29-07-2023 | 10-08-2023 | 10-08-2023 | 10-08-2023 | 03:30 PM | Active | और देखें |
15. | Construction of Slime Pond near screening Plant at Kandri Mine( KAN/CIVIL/NIT/23-24/1023 DT 21.07.2023) | 29-07-2023 | 11-08-2023 | 11-08-2023 | 11-08-2023 | 04:30 PM | Active | और देखें |
16. | Maintenance and Operation of water supply scheme at Munsar Mine(AGT/MUN/CIVIL/NIT/23-24/973 DT 17/07/2023) | 29-07-2023 | 12-08-2023 | 12-08-2023 | 12-08-2023 | 04:30 PM | Active | और देखें |
17. | Installation of Bio Toilets at Underground at Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/6/23-24/ET/6) | 28-07-2023 | 05-09-2023 | 05-09-2023 | 05-09-2023 | 03:30 PM | Active | और देखें |
18. | Construction of Canteen Building at Kandri Mine.(MOIL/MOIL LIMITED/CMC/3/23-24/ET/3) | 28-07-2023 | 05-09-2023 | 05-09-2023 | 05-09-2023 | 03:30 PM | Active | और देखें |
19. | In house Maintenance of Rest house, Mine Manager Bungalow, Canteen and Recreational hall at Gumgaon Mine(AGT/GUM/HR/LT/23-24/584, Date 15.07.2023) | 28-07-2023 | 04-08-2023 | 04-08-2023 | 04-08-2023 | 04:30 PM | Active | और देखें |
20. | Construction of Bathroom cum Toilet Block for EMD Plant, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/5/23-24/ET/5) | 28-07-2023 | 05-09-2023 | 05-09-2023 | 05-09-2023 | 03:30 PM | Active | और देखें |
21. | COMPREHENSIVE AMC OF EPABX EXCHANGE OF CHIKLA MINE FOR A PERIOD OF 2 YEAR.(AGENT/GR-II/ELECT/23-24/564 DATE 22/07/2023) | 27-07-2023 | 03-08-2023 | 03-08-2023 | 03-08-2023 | 04:30 PM | Active | और देखें |
22. | Drilling 57 mm dia of holes for pre Mining support for installation cabal bolt in a Mangni ferous rock in various level at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/704 DT.24.07.2023) | 27-07-2023 | 04-08-2023 | 04-08-2023 | 04-08-2023 | 04:30 PM | Active | और देखें |
23. | Repairing of Track Roller Assy of TATA1200 - No.1 Hydraulic Excavator of Dongri Buzurg Mine.(DB/MECH/23-24/567) | 26-07-2023 | 19-08-2023 | 19-08-2023 | 19-08-2023 | 04:30 PM | Active | और देखें |
24. | Procurement of Shaft Mounted Speed Reduction gear box F20 with back stop assembly. Make Fenner(PUR/MOIL/BGT/IMB/23-24/710) | 25-07-2023 | 10-08-2023 | 10-08-2023 | 10-08-2023 | 04:30 PM | Active | और देखें |
25. | Proposal for Concreting 13.50 Level at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/705 DT.22.07.2023) | 24-07-2023 | 04-08-2023 | 04-08-2023 | 04-08-2023 | 04:30 PM | Active | और देखें |
26. | Proposal for Filling and spreading of waste rock at 8 level north and 12 th level Balaghat Mine(MINING/BGT/LT/AGT/2023-24/706 DT 23.07.2023) | 24-07-2023 | 04-08-2023 | 04-08-2023 | 04-08-2023 | 04:30 PM | Active | और देखें |
27. | Providing and supplying of plants for plantation at Balaghjat Mine(CIVIL/BGT/LT/AGT/2023-24/707 Date -24.07.2023) | 24-07-2023 | 04-08-2023 | 04-08-2023 | 04-08-2023 | 04:30 PM | Active | और देखें |
28. | Purchase of Sullube oil, spears for the Godrej Make Electrical Air Compressor for MOIL Ltd. Chikla.(TE/MOIL/CH/MECH/23-24/360 Dt. 24.07.2023) | 24-07-2023 | 31-07-2023 | 31-07-2023 | 31-07-2023 | 03:30 PM | Active | और देखें |
29. | Sorting of Surplus Underground ROM for grade UKL448 at from 1st and 2nd vertical shaft of Ukwa Mine.(AGT/MINING/UK/LT/23-24/700-A DT.24.07.2023) | 24-07-2023 | 29-07-2023 | 29-07-2023 | 29-07-2023 | 04:30 PM | Active | और देखें |
30. | Purchase of spares of Water Cooled IR Make Electrical Air Compressor for MOIL Ltd. Chikla Mine(TE/MOIL/CH/MECH/23-24/360/ Dt. 24.07.2023) | 24-07-2023 | 31-07-2023 | 31-07-2023 | 31-07-2023 | 03:30 PM | Active | और देखें |
31. | Housekeeping works in Administrative office building, Mine Manager Bungalow, Rest House and rest locations at Ukwa Mine.(AGT/HR/UK/LT/23-24/701-A DT.24.07.2023) | 24-07-2023 | 29-07-2023 | 29-07-2023 | 29-07-2023 | 04:30 PM | Active | और देखें |
32. | Operation of vibratory screen installed at surface in Gumgaon Mine(Agent/Gum/Min/23-24/636, Date 24.07.2023) | 24-07-2023 | 01-08-2023 | 01-08-2023 | 01-08-2023 | 04:30 PM | Active | और देखें |
33. | Modification, Erection and Dismantling of Brick Wall, Ventilation Door and Regulator at Gumgaon Mine.(Agent/Gum/Min/23-24/638, Date 24/07/2023) | 24-07-2023 | 01-08-2023 | 01-08-2023 | 01-08-2023 | 04:30 PM | Active | और देखें |
34. | Repairing of LH track chain of PC450 no.2 hydraulic excavator operating at D.B.Mine(DB/MECH/23-24/JGM(MECH)/535) | 22-07-2023 | 11-08-2023 | 11-08-2023 | 11-08-2023 | 04:30 PM | Active | और देखें |
35. | Sorting of surplus ROM Underground sections for grade UKL448 and UKL 471 from Ch 12800 of Ukwa Mine for experiment basis .(AGT/MINING/UK/LT/23-24/699-A DT.22.07.2023) | 22-07-2023 | 29-07-2023 | 29-07-2023 | 29-07-2023 | 04:30 PM | Active | और देखें |
36. | Providing, supplying installation and commissioning of standby metering arrangement at poolling station of 4.8 MW Wind Generation Unit of MOIL Limited at Nagda Hills Dewas (M.P.)(MOIL/MOIL LIMITED/CMC/19/23-24/ET/19) | 21-07-2023 | 21-08-2023 | 21-08-2023 | 21-08-2023 | 03:30 PM | Active | और देखें |
37. | Design, Procurement, Supply, Fabrication, Erection, Installation and Commissioning of New C and S Plant of 70 TPH capacity near 2nd Vertical Shaft at Ukwa Mine(MOIL/MOIL LIMITED/CMC/15/23-24/ET/15) | 21-07-2023 | 21-08-2023 | 21-08-2023 | 21-08-2023 | 03:30 PM | Active | और देखें |
38. | Supply of seat belt reminder for dumpers, tippers, motor grader and road compactor of Dongribuzurg mine(PUR/DB/MECH/2023-2024/534) | 20-07-2023 | 09-08-2023 | 09-08-2023 | 09-08-2023 | 04:30 PM | Active | और देखें |
39. | Supply of seat belt reminder for dumpers, tippers, motor grader and road compactor of Dongribuzurg mine(PUR/DB/MECH/2023-2024/534) | 20-07-2023 | 09-08-2023 | 09-08-2023 | 09-08-2023 | 09:00 AM | Active | और देखें |
40. | PURCHASE OF LT LOADER 9020 SPARES(PUR/MOIL/AGT/DB/2023-24/469) | 19-07-2023 | 09-08-2023 | 09-08-2023 | 09-08-2023 | 04:30 PM | Active | और देखें |
41. | SUPPLY OF AUTO DIPPER SYSTEM FOR DUMPERS OF DONGRIBUZURG MINE(PUR/DB/MECH/2023-2024/507) | 19-07-2023 | 09-08-2023 | 09-08-2023 | 09-08-2023 | 04:30 PM | Active | और देखें |
42. | Hiring of Consultant for Design Engineering Services for proposed construction of Guest House at Ukwa Mine(AGT/CIVIL/UK/LT/23-24/683 DT 18.07.2023) | 19-07-2023 | 25-07-2023 | 25-07-2023 | 25-07-2023 | 04:30 PM | Active | और देखें |
43. | Maintenance and operation of Drinking water supply scheme at Chikla Mine.(Civil/CH/TE/23-34/529 Date-19.07.2023) | 19-07-2023 | 02-08-2023 | 02-08-2023 | 02-08-2023 | 04:30 PM | Active | और देखें |
44. | Transportation of underground tubs at Ch5000 section at Ukwa Mine(AGT/CIVIL/UK/LT/23-24/686) | 19-07-2023 | 25-07-2023 | 25-07-2023 | 25-07-2023 | 04:30 PM | Active | और देखें |
45. | Concreting at 12500 to 14000 as per support and miscellaneous requirement at Ukwa Mine .(AGT/CIVIL/UK/LT/23-24/684 DT.18.07.2023) | 19-07-2023 | 25-07-2023 | 25-07-2023 | 25-07-2023 | 04:30 PM | Active | और देखें |
46. | Transportation of dump waste material from Chittawar section to Nagra Plant at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/685 Dt.18.07.2023) | 19-07-2023 | 25-07-2023 | 25-07-2023 | 25-07-2023 | 04:30 PM | Active | और देखें |
47. | Transportation, Unloading of ROM/Rock tubs from vertical shaft at Beldongri Mine(Agent/PRO/BEL/23-24/ 589) | 18-07-2023 | 31-07-2023 | 31-07-2023 | 31-07-2023 | 04:30 PM | Active | और देखें |
48. | Lowering of 240sqmm LT cable in intermediate level at Munsar Mine(ELECT/MUN/23-24/564, Dated 12.07.2023) | 18-07-2023 | 09-08-2023 | 09-08-2023 | 09-08-2023 | 04:30 PM | Active | और देखें |
49. | Providing and installation of partition for making Cabin and cubicles and storage/cabinets at administrative Building at gumgaon Mine.(MOIL/MOIL LIMITED/CMC/13/23-24/ET/13) | 18-07-2023 | 21-08-2023 | 21-08-2023 | 21-08-2023 | 03:30 PM | Active | और देखें |
50. | Construction of Building for Bank at Tirodi Mine.(MOIL/MOIL LIMITED/CMC/8/23-24/ET/8) | 18-07-2023 | 21-08-2023 | 21-08-2023 | 21-08-2023 | 03:30 PM | Active | और देखें |
51. | Construction of Bituminous Tar road in industrial premises and residential quarters of Ukwa Mine.(MOIL/MOIL LIMITED/CMC/18/23-24/ET/18) | 18-07-2023 | 21-08-2023 | 21-08-2023 | 21-08-2023 | 03:30 PM | Active | और देखें |
52. | Major Repair work to Explosive Magazine at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/10/23-24/ET/10) | 18-07-2023 | 21-08-2023 | 21-08-2023 | 21-08-2023 | 03:30 PM | Active | और देखें |
53. | Construction of Siding Office with Sample Room at Kandri Mine.(MOIL/MOIL LIMITED/CMC/11/23-24/ET/11) | 18-07-2023 | 17-08-2023 | 17-08-2023 | 17-08-2023 | 03:30 PM | Active | और देखें |
54. | Fabrication, installation and commissioning of water tight Doors 02 Nos at -450 feet level -550 feet level at Kandri Mine.(MOIL/MOIL LIMITED/CMC/4/23-24/ET/4) | 18-07-2023 | 21-08-2023 | 21-08-2023 | 21-08-2023 | 03:30 PM | Active | और देखें |
55. | Construction of weigh Bridge Foundation along with office Building at Tirodi Mine.(MOIL/MOIL LIMITED/CMC/12/23-24/ET/12) | 18-07-2023 | 21-08-2023 | 21-08-2023 | 21-08-2023 | 03:30 PM | Active | और देखें |
56. | Providing Plants with pot and Repairing the existing lawn in front of Administrative office at Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/656 Date 17.07.2023) | 17-07-2023 | 28-07-2023 | 28-07-2023 | 28-07-2023 | 04:30 PM | Active | और देखें |
57. | Lowering of 3Cx240sqmm LT PVC DWA cable at kandri Mine through Bore hole(AGENT/GRIII/ELECT/23-24/442, Dated 16.06.2023) | 17-07-2023 | 28-07-2023 | 28-07-2023 | 28-07-2023 | 04:30 PM | Active | और देखें |
58. | Additional excavation of ore body at -450L UG in Kandri Mine(KD/MINES/NIT/2023-24/989) | 17-07-2023 | 24-07-2023 | 24-07-2023 | 24-07-2023 | 04:30 PM | Active | और देखें |
59. | Cable bolting operation in -450L UG at Kandri Mine(KD/MINES/NIT/2023-24/993) | 17-07-2023 | 25-07-2023 | 25-07-2023 | 25-07-2023 | 04:30 PM | Active | और देखें |
60. | RCC of wall and roof in 7 No cross cut at -450L UG in Kandri Mine(KD/MINES/NIT/2023-24/991) | 17-07-2023 | 24-07-2023 | 24-07-2023 | 24-07-2023 | 04:30 PM | Active | और देखें |
61. | REQUEST FOR EXPRESSION OF INTEREST (EOI) FOR UNDERTAKING THE WORK OF VERTICAL SHAFT EQUIPPING AND FURNISHING AT OUR BALAGHAT AND GUMGAON MINE.(EOI/MOIL/CMC/TEC/BG-GM/2023/92) | 17-07-2023 | 07-08-2023 | 07-08-2023 | 07-08-2023 | 03:30 PM | Active | और देखें |
62. | Enhancement of hoisting capacity of Vertical Shaft by modification in winding engine, strengthening of headgear and design, supply and installation of Disc Brake System for Main Service Brake of 250 HP man-winding system at Gumgaon Mine(MOIL/MOIL LIMITED/CMC/14/23-24/ET/14) | 17-07-2023 | 16-08-2023 | 16-08-2023 | 16-08-2023 | 03:30 PM | Active | और देखें |
63. | Operation of 240/350 HP Pumps and related work at Dongri Buzurg Mine.(DB/MECH/23-24/408) | 15-07-2023 | 18-07-2023 | 18-07-2023 | 18-07-2023 | 11:30 PM | Active | और देखें |
64. | Supply of Medicines 277 items(PUR/MOIL/C-10/35/WE-17/ET-20) | 15-07-2023 | 22-08-2023 | 22-08-2023 | 23-08-2023 | 03:30 PM | Active | और देखें |
65. | Maintenance of Garden at various places at Chikla Mine.(Civil/CH/TE/23-24/509 Date-15.07.2023) | 15-07-2023 | 25-07-2023 | 25-07-2023 | 25-07-2023 | 04:30 PM | Active | और देखें |
66. | Driiling of bore weil (2 nos) at sukfi viltage under MolL CER.(TRD/CIVIL/23-24/1580 DATED 05/07/2023) | 14-07-2023 | 21-07-2023 | 21-07-2023 | 21-07-2023 | 04:00 PM | Active | और देखें |
67. | Drilling of bore well (2 nos) at Tirodi village under MOIL CER.(TRD/CIVIL/23-24/581 DATED 05/07/2023) | 14-07-2023 | 21-07-2023 | 21-07-2023 | 21-07-2023 | 04:00 PM | Active | और देखें |
68. | External painting to compound wall, shrub cutting, plumbing and other works at Rest House, Tirodi Mine.(TRD/CIVIL/23-24/627 DATED 11/07/2023) | 14-07-2023 | 21-07-2023 | 21-07-2023 | 21-07-2023 | 04:00 PM | Active | और देखें |
69. | Repairing of 6 Cyl. Diesel engine of Ashok Leyland tipper of Balaghat Mine.(AGT/BGT/MECH/MG/23-24/633) | 13-07-2023 | 20-07-2023 | 20-07-2023 | 20-07-2023 | 04:30 PM | Active | और देखें |
70. | Fabrication of Butterfly Valve Diaphragm along with the Spline Shaft of Air Pulsating Jig of IMB Plant of Balaghat Mine.(AGT/BGT/MECH/IMB/23-24/634) | 13-07-2023 | 28-07-2023 | 28-07-2023 | 28-07-2023 | 04:30 PM | Active | और देखें |
71. | Maintenance and Operation of Water supply Scheme at Balaghat Mine(CIVIL/BGT/LT/2023-24/602 Dt.07.07.2023) | 12-07-2023 | 20-07-2023 | 20-07-2023 | 20-07-2023 | 04:30 PM | Active | और देखें |
72. | Proposal for Out sourcing manpower for the Maintenance work of the OCF jig machinery dump screen and pilot plant(MINING/BGT/LT/AGT/2023-24/601 DT. 07.07.2023) | 12-07-2023 | 20-07-2023 | 20-07-2023 | 20-07-2023 | 04:30 PM | Active | और देखें |
73. | Repairing/replacement of partition plate for strengthening of Day Bunker and fabrication of platform for providing approach walkway from hydraulic floor to Day Bunker of Ferro Manganese plant, Balaghat Mine(MOIL/FMP/AGT/MECH/23 24/127 Date 05.07.2023) | 12-07-2023 | 21-07-2023 | 21-07-2023 | 21-07-2023 | 04:30 PM | Active | और देखें |
74. | Providing and supplying of out door Green Gym equipment for Kesri camp (New 100 Qr. Colony) at Chikla Mine.(HR/CH/TE/23-24/500 Date-12.07.2023) | 12-07-2023 | 26-07-2023 | 26-07-2023 | 26-07-2023 | 04:30 PM | Active | और देखें |
75. | Cleaning of ROM at Beldongri Group of Mine(AGENT AND Dy.G.M III-PRO/BEL/23-24/550) | 11-07-2023 | 17-07-2023 | 17-07-2023 | 17-07-2023 | 04:30 PM | Active | और देखें |
76. | Afforestation works at Ukwa Mine for Ch.3700 to ch.4800 Ukwa (Mining Lease Area 199.067 Hectare, 48.974Hac 69.581Hac purchase land)Under Sustainable Development at Ukwa Mine.(AGT/CIVIL/UK/LT/2023-24/609 dt.10.07.2023) | 10-07-2023 | 17-07-2023 | 17-07-2023 | 17-07-2023 | 04:30 PM | Active | और देखें |
77. | Interior and exterior painting works in Mine Manager Bungalow at Ukwa Mine.(AGT/CIVIL/UK/LT/2023-24/610 dt.10.07.2023) | 10-07-2023 | 17-07-2023 | 17-07-2023 | 17-07-2023 | 04:30 PM | Active | और देखें |
78. | Loading of tubs from OTC from 1750 level to 1650 Level and Transportation of loaded tubs upto shaft inset at 1650 level at Ukwa Mine.(AGT/MINING/UK/LT/2023-24/608 Dt.10.07.2023) | 10-07-2023 | 17-07-2023 | 17-07-2023 | 17-07-2023 | 04:30 PM | Active | और देखें |
79. | Pushing and unloading of tubs in U/G and on surface at 1st Vertical section at Ukwa Mine.(AGT/MINING/UK/LT/2023-24/607 Dt.10.07.2023) | 10-07-2023 | 17-07-2023 | 17-07-2023 | 17-07-2023 | 04:30 PM | Active | और देखें |
80. | Tub transportation at Nagra Section at Ukwa Mine(AGT/MINING/UK/LT/2023-24/606 dt.10.07.2023) | 10-07-2023 | 17-07-2023 | 17-07-2023 | 17-07-2023 | 04:30 PM | Active | और देखें |
81. | Extension of Electrical Substation Building near Barakholi at Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/1167 07.07.23) | 08-07-2023 | 18-07-2023 | 18-07-2023 | 18-07-2023 | 04:30 PM | Active | और देखें |
82. | Outsourcing of operator and general maintenance of Industrial Pump in Underground.(TE/CH/MECH/2023/527/461 dt. 06/07/2023) | 07-07-2023 | 12-07-2023 | 12-07-2023 | 12-07-2023 | 03:30 PM | Active | और देखें |
83. | Requirement of spares for Vibrating feeder Type 750 mm for Chikla Mine(TE/CH/MECH/23-24/10007595/425 Dt 01/07/2023) | 07-07-2023 | 17-07-2023 | 17-07-2023 | 17-07-2023 | 03:30 PM | Active | और देखें |
84. | Fabrication of Pinion Gear and Idler gear set for Tub Tippler of material handling plant.(TE/CH/MECH/23-24/76-24186/432 Dt001/07/2023) | 07-07-2023 | 18-07-2023 | 18-07-2023 | 18-07-2023 | 03:30 PM | Active | और देखें |
85. | Fabrication, erection and installation of 50 MT Road Weigh bridge size 3 X9 Meter at Pathri Ghat.(TE/CH/HO/MECH/CAP/2023/17/429 Dt 01/07/2023) | 07-07-2023 | 18-07-2023 | 18-07-2023 | 18-07-2023 | 03:30 PM | Active | और देखें |
86. | COMPREHENSIVE AMC OF COMPUTERS, PRINTERS, SCANNERs, UPSs, Network Unit at Tirodi Mine and Sitapatore Mine(TE/BGT/SYSTEM/AMC/2023-24/600) | 07-07-2023 | 21-07-2023 | 21-07-2023 | 21-07-2023 | 04:00 PM | Active | और देखें |
87. | Repairing of old elongated and damaged Lead cathode plates at EMD Plant DB Mine(MOIL/DB/EMD/ADGM/23-24/381) | 06-07-2023 | 14-07-2023 | 14-07-2023 | 14-07-2023 | 04:30 PM | Active | और देखें |
88. | Providing and Coating of FRVE of Neutralization tank at EMD Plant, DB Mine(MOIL/DB/EMD/ADGM/23-24/382) | 06-07-2023 | 14-07-2023 | 14-07-2023 | 14-07-2023 | 04:30 PM | Active | और देखें |
89. | REPLACEMENT AND INSTALLATION OF 3.3KV HT VCB PANEL AT 8TH LEVEL UNDERGROUND OF BALAGHAT MINE.(BGT/TE/ELECT/AJGM/23-24/575) | 05-07-2023 | 13-07-2023 | 13-07-2023 | 13-07-2023 | 03:30 PM | Active | और देखें |
90. | EXPRESSION OF INTEREST FOR PROVIDING CONSULTANCY FOR PRELIMINARY DESIGN, DETAILED COST ESTIMATE/ SCHEDULE, TENDER DOCUMENT AND ASSISTANCE IN EVALUATION OF BIDS IN RESPECT OF PROPOSED PRODUCTION AND VENTILATION SHAFTS AT DONGRI BUZURG MINE OF MOIL.(EOI/MOIL/CMC/TECH/DB/2023/89) | 05-07-2023 | 02-08-2023 | 02-08-2023 | 02-08-2023 | 03:30 PM | Active | और देखें |
91. | Repairing of Polder Pump-80HP of Bhatera Pump house of Blaghat Mine.(AGT/BGT/MECH/POLDER/23-24/560) | 04-07-2023 | 27-07-2023 | 27-07-2023 | 27-07-2023 | 04:30 PM | Active | और देखें |
92. | Repairing of Polder Pump-80HP of Bhatera Pump house of Blaghat Mine.(AGT/BGT/MECH/POLDER/23-24/560) | 04-07-2023 | 27-07-2023 | 27-07-2023 | 27-07-2023 | 04:30 PM | Active | और देखें |
93. | Erection of foundation concrete base and installation of additional 120HP and 150HP multistage pumps with 6 inch GI pipeline from pump house to second outlet shaft at 15th L Underground.(AGT/BGT/MECH/PUMP/23-24/561) | 04-07-2023 | 12-07-2023 | 12-07-2023 | 12-07-2023 | 04:30 PM | Active | और देखें |
94. | Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Maintenance Contract of Dongri Buzurg Mine.(DB/SYSTEM/AMC/2023-24/444) | 04-07-2023 | 13-07-2023 | 13-07-2023 | 13-07-2023 | 04:00 PM | Active | और देखें |
95. | SHIFTING, FIXING, INSTALLATION OF 25 MTR HIGH MAST TOWER NEAR MINE STORE OF BALAGHAT MINE(BGT/TE/ELECT/AJGM/23-24/573) | 04-07-2023 | 12-07-2023 | 12-07-2023 | 12-07-2023 | 03:30 PM | Active | और देखें |
96. | Proposal for Tub Transport from all Level inset UG to surface at 2nd vertical shaft at Ukwa Mine(AGT/MIN/UK/LT/2023-24/551 Date- 28.06.2023) | 03-07-2023 | 10-07-2023 | 10-07-2023 | 10-07-2023 | 04:30 PM | Active | और देखें |
97. | Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Maintenance Contract of CHIKLA Mine.(CH/SYSTEM/AMC/2023-24/441 Dt 04/07/2023) | 03-07-2023 | 13-07-2023 | 13-07-2023 | 13-07-2023 | 04:30 PM | Active | और देखें |
98. | Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPSs installed at Balaghat Mine(TE/BGT/SYSTEM//AMC/2023-24/536) | 01-07-2023 | 17-07-2023 | 17-07-2023 | 17-07-2023 | 04:00 PM | Active | और देखें |
99. | Operation of 240/350 HP Pumps and related work at Dongri Buzurg Mine.(DB/MECH/2023-24/408) | 01-07-2023 | 08-07-2023 | 08-07-2023 | 08-07-2023 | 04:30 PM | Active | और देखें |
100. | Providing and laying plain cement concrete flooring at premises of Magazine at Chikla Mine.(Civil/CH/TE/23-24/416 Date-29.06.2023) | 01-07-2023 | 15-07-2023 | 15-07-2023 | 15-07-2023 | 04:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |