1. | Prepration of Ground and Cleaning works upcoming programe at Balaghat Mine(CIVIL/BGT/LT/2023-24/1354 Dt.22.11.2023) | 24-11-2023 | 30-11-2023 | 30-11-2023 | 30-11-2023 | 04:30 PM | Active | और देखें |
2. | Providing and fixing Shed on Units of WTP at Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/68) | 24-11-2023 | 02-01-2024 | 02-01-2024 | 02-01-2024 | 04:00 PM | Active | और देखें |
3. | Construction of Canteen Building at Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/63) | 24-11-2023 | 02-01-2024 | 02-01-2024 | 02-01-2024 | 04:00 PM | Active | और देखें |
4. | Construction of Toilet block at Various Places Tirodi Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/64) | 24-11-2023 | 02-01-2024 | 02-01-2024 | 02-01-2024 | 04:00 PM | Active | और देखें |
5. | Concreting Works including chain Link Fencing Works and allied Works in and around Mine Magazine Building that is Detonator and Explosive Room for Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/62) | 24-11-2023 | 02-01-2024 | 02-01-2024 | 02-01-2024 | 04:00 PM | Active | और देखें |
6. | DESIGNING, PROVIDING, SUPPLYING, CONSTRUCTION, INSTALLATION, TESTING AND COMISSIONING OF A 3X20MVA, 132/33KV SUBSTATION (AIS) WITH OandM CONTRACT ON TURNKEY BASIS AT BALAGHAT MINE OF MOIL LIMITED, VILLAGE BHARVELI, BALAGHAT DISTRICT, MADHYA PRADESH(MOIL/MOIL LIMITED/CMC/23-24/ET/69) | 24-11-2023 | 08-02-2024 | 08-02-2024 | 08-02-2024 | 04:00 PM | Active | और देखें |
7. | Fabrication of Pump Spares by Pattern Making, Casting and Machining work for 240 HP Kirloskar Make Multistage Pump of Balaghat Mine.(AGT/BGT/MECH/PUMP/23-24/1352) | 23-11-2023 | 30-11-2023 | 30-11-2023 | 30-11-2023 | 04:30 PM | Active | और देखें |
8. | Repairing of Gear boxes of Radicon and Fenner make U-700 of Lumpy and Product belt of Pilot Plant of Balaghat Mine(AGT/BGT/MECH/PP/23-24/1353) | 23-11-2023 | 07-12-2023 | 07-12-2023 | 07-12-2023 | 04:30 PM | Active | और देखें |
9. | Spillage cleaning work near flap door of Holmes shaft skip and bunker conveyor belt and changeover area of Production shaft of Balaghat Mine.(AGT/BGT/MECH/HS/23-24/1354) | 23-11-2023 | 30-11-2023 | 30-11-2023 | 30-11-2023 | 04:30 PM | Active | और देखें |
10. | SHIFTING OF 3PHASE 5WIRE LT OVERHEAD LINE TERMINATED TO SIDING AT GUMGAON MINE(GUM/ELECT/22-23/2147 DT 22.11.2023) | 22-11-2023 | 11-12-2023 | 11-12-2023 | 11-12-2023 | 04:30 PM | Active | और देखें |
11. | Miscellaneous renovation works in RNT School at Ukwa Mine(AGT/CIVIL/UK/LT/23-24/1351 Dt.21.11.2023) | 22-11-2023 | 29-11-2023 | 29-11-2023 | 29-11-2023 | 04:30 PM | Active | और देखें |
12. | Miscellaneous civil works for slime pond at Nagra Plant of Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/1350) | 22-11-2023 | 29-11-2023 | 29-11-2023 | 29-11-2023 | 04:30 PM | Active | और देखें |
13. | Fabrication and erection of Security Tower at South and Jamrapani Siding, Tirodi Mine.(TRD/CIVIL/23-24/1074 DATED 28/09/2023) | 22-11-2023 | 28-11-2023 | 28-11-2023 | 28-11-2023 | 04:00 PM | Active | और देखें |
14. | Cutting, cleaning of grass/ shrubs and trimming of trees along lease boundary of 43.353,4.734 and 79.550 hector lease at Sitapatore mine(SP/CIVIL/23-24/1119 DATED 09/10/2023) | 22-11-2023 | 28-11-2023 | 28-11-2023 | 28-11-2023 | 4:00 PM | Active | और देखें |
15. | Repair of road from mine office to 3 no. dump towards 5 no. pit at Sitapatore Mine.(SP/CIVIL/23-24/1118 DATED 09/10/2023) | 22-11-2023 | 28-11-2023 | 28-11-2023 | 28-11-2023 | 04:00 PM | Active | और देखें |
16. | Replacement of 50 LBS guide Rails of 1st Vertical Shaft of Chikla Mine.(CH/MECH/23-24/7600028371/1171 DT.09/11/2023) | 22-11-2023 | 27-11-2023 | 27-11-2023 | 27-11-2023 | 04:30 PM | Active | और देखें |
17. | Repairing of Main Hydraulic Pump of Hydraulic Excavator Tata Hitachi-220LC deployed at Balaghat Mine.(AGT/BGT/MECH/EXC/23-24/1340) | 21-11-2023 | 29-11-2023 | 29-11-2023 | 29-11-2023 | 04:30 PM | Active | और देखें |
18. | Repairing of Track Chain Assembly-1set (2Nos.) of Hydraulic Excavator Tata Hitachi-220 deployed at Balaghat Mine.(AGT/BGT/MECH/EXC/23-24/1339) | 20-11-2023 | 06-12-2023 | 06-12-2023 | 06-12-2023 | 04:30 PM | Active | और देखें |
19. | REPLACEMENT OF 5MVA, POWER TRANSFORMER WITH 2.5MVA, POWER TRANSFORMER OF 33KV SUBSTATION OF MINE(BGT/TE/ELECT/AJGM/23-24/1338) | 20-11-2023 | 28-11-2023 | 28-11-2023 | 28-11-2023 | 03:30 PM | Active | और देखें |
20. | Providing 10 mbps 1 is to 1 Internet Leased Line at Munsar Mine(ADGM/GroupIII/SYS/2023-24/1292) | 17-11-2023 | 24-11-2023 | 24-11-2023 | 24-11-2023 | 04:00 PM | Active | और देखें |
21. | SHIFTING, INSTALLATION AND COMMISSIONING OF LT PCC PANEL AT IMB PLANT OF BALAGHAT MINE(BGT/TE/ELECT/AJGM/23-24/1332) | 16-11-2023 | 24-11-2023 | 24-11-2023 | 24-11-2023 | 03:30 PM | Active | और देखें |
22. | Lead Antimony Coils Qty 7 ID20mm WT5mm L17 m Length each for EMD Plant Dongri Buzurg Mine(MOIL/DB/EMD/ADGM/23-24/1177) | 15-11-2023 | 12-12-2023 | 12-12-2023 | 12-12-2023 | 04:30 PM | Active | और देखें |
23. | Loading Unloading(T.E./22-23/1152) | 15-11-2023 | 18-11-2023 | 18-11-2023 | 18-11-2023 | 04:30 PM | Active | और देखें |
24. | TENDER FOR SUPPLY OF ELECTRICAL C CLASS ITEMS FOR FERRO MANGANESE PLANT, BALAGHAT MINE(TE/MOIL/FMP/ELECT/23-24/325) | 15-11-2023 | 30-11-2023 | 30-11-2023 | 30-11-2023 | 04:30 PM | Active | और देखें |
25. | Auto Electrical repairing works of various vehicles of Chikla Mine.(CH/MECH/23-24/7600028095/1165 DT 5/11/2023) | 11-11-2023 | 20-11-2023 | 20-11-2023 | 20-11-2023 | 04:30 PM | Active | और देखें |
26. | Hiring of Backhoe cum loader for handling of subgrade ore(Agent/Gum/Min/23-24/1276, date 10/11/2023) | 10-11-2023 | 17-11-2023 | 17-11-2023 | 17-11-2023 | 04:30 PM | Active | और देखें |
27. | PURCHASE OF 30 V BATTERY CHARGER WITH STATION BATTERY SET 30V, 2 VOLT 100AH - 2 set(BGT/TE/ELECT/AJGM/23-24/1306) | 10-11-2023 | 20-11-2023 | 20-11-2023 | 20-11-2023 | 03:30 PM | Active | और देखें |
28. | Repairs of control system of 1500 KVA, 11 KV, Sterling and Wilson Powergen make DG Set at MOIL Limited Kandri Mine and Providing, of required material and complete rewinding of 5 MVA, 33KV/11KV outdoor type transformer with same data and sizes(MOIL/MOIL LIMITED/CMC/23-24/ET/65) | 10-11-2023 | 22-12-2023 | 22-12-2023 | 22-12-2023 | 04:00 PM | Active | और देखें |
29. | Sorting of surplus ROM Underground sections for grade of UKL 471 from Ch 12800 of Ukwa Mine.(AGT/MINING/UK/LT/2023-24/1294 dt.08.11.2023) | 09-11-2023 | 16-11-2023 | 16-11-2023 | 16-11-2023 | 04:30 PM | Active | और देखें |
30. | Waste material Removal from settling pond at Nagra plant.(AGT/MINING/UK/LT/2023-24/1295 DT.09.11.2023) | 09-11-2023 | 16-11-2023 | 16-11-2023 | 16-11-2023 | 04:30 PM | Active | और देखें |
31. | Underground sand stowing / Bottom Ash operation at Ukwa Mine(1750 Level).(AGT/MINING/UK/LT/2023-24/1296 08.11.2023) | 09-11-2023 | 16-11-2023 | 16-11-2023 | 16-11-2023 | 04:00 PM | Active | और देखें |
32. | Filling and Spreading(Agent/Gum/Min/23-24/1271, date 08/11/2023) | 08-11-2023 | 15-11-2023 | 15-11-2023 | 15-11-2023 | 04:30 PM | Active | और देखें |
33. | Purchase of 110V DC Battery Power Pack for Chikla Mine.(CH/TE/ELECT/PUR/23-24/1134 Date 31/10/2023) | 06-11-2023 | 20-11-2023 | 20-11-2023 | 20-11-2023 | 04:30 PM | Active | और देखें |
34. | Purchase of Traction Battery Locomotive Electrical Spares for Chikla Mine.(CH/TE/ELECT/PUR/23-24/1133 Date 31/10/2023) | 06-11-2023 | 20-11-2023 | 20-11-2023 | 20-11-2023 | 04:30 PM | Active | और देखें |
35. | Repairing and laying of sewer line in Gudma camp and prem nagar colony at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/1283 DT.06.11.2023) | 06-11-2023 | 10-11-2023 | 10-11-2023 | 10-11-2023 | 04:30 PM | Active | और देखें |
36. | Repairing of road by spreading of filling material at approach road for 95 section at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/1282 Dt.06.11.2023) | 06-11-2023 | 10-11-2023 | 10-11-2023 | 10-11-2023 | 9:00 AM | Active | और देखें |
37. | Out Sourcing of crusher for crushing Sub grade mineral dump(CIVIL/BGT/LT/AGT/2023-24/1287 Date 05.11.2023) | 06-11-2023 | 15-11-2023 | 15-11-2023 | 15-11-2023 | 04:30 PM | Active | और देखें |
38. | Maintenance and Operation of Water Supply scheme at Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/1287 Date 05.11.2023) | 06-11-2023 | 10-11-2023 | 10-11-2023 | 10-11-2023 | 04:30 PM | Active | और देखें |
39. | Providing and installation of Bio-toilets at Chikla Mine.(CH/Civil/NIT/23-24/1127 Date-29.10.2023) | 04-11-2023 | 02-12-2023 | 02-12-2023 | 02-12-2023 | 04:30 PM | Active | और देखें |
40. | Construction of precast pre-stressed panels slabs in Underground Mine at Kandri Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/59) | 03-11-2023 | 12-12-2023 | 12-12-2023 | 12-12-2023 | 04:00 PM | Active | और देखें |
41. | Construction of Boundary Wall Around Second Vertical Shaft at Ukwa Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/60) | 03-11-2023 | 05-12-2023 | 05-12-2023 | 05-12-2023 | 04:00 PM | Active | और देखें |
42. | Providing furniture and Interior works for Finance Department on First Floor of MOIL Bhavan Nagpur(MOIL/MOIL LIMITED/CMC/23-24/ET/61) | 03-11-2023 | 05-12-2023 | 05-12-2023 | 05-12-2023 | 04:00 PM | Active | और देखें |
43. | Providing and fixing of Heavy Duty Paver Block along CC Road Side with road side Kerb Stones from Main Entrance Gate towards Bhubhneshwari Temple at Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/1137 31.10.23) | 02-11-2023 | 10-11-2023 | 10-11-2023 | 10-11-2023 | 04:30 PM | Active | और देखें |
44. | Procurment of Tractor Mouned Floor Sweeping Machine for Workshop premises of Dongir Buzurg Mine.(PUR/MOIL//DB.2023-24/1137) | 02-11-2023 | 14-11-2023 | 14-11-2023 | 14-11-2023 | 04:30 PM | Active | और देखें |
45. | Major Repairing of bucket of TATA450 hyd excavator at Tirodi Mine(MOIL/TD01/MECH/GEN/2023/574) | 02-11-2023 | 07-11-2023 | 07-11-2023 | 07-11-2023 | 03:30 PM | Active | और देखें |
46. | REPAIRS TO RESTRICTED NEUTRAL GROUNDING SYSTEM FOR DIFFERENT TYPES OF TRANSFORMERS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/23-24/1276) | 02-11-2023 | 09-11-2023 | 09-11-2023 | 09-11-2023 | 03:30 PM | Active | और देखें |
47. | Procurement of Track Plates for Tata Hitachi Make Hyd. Exacavator-220 LC(PUR/BGT/Track-Plate/23-24/1260) | 01-11-2023 | 10-11-2023 | 10-11-2023 | 10-11-2023 | 04:30 PM | Active | और देखें |
48. | Purchase of Mono-block Pumps with Starter 2 Nos. for Dongri Buzurg Mine.(PUR/MOIL//DB/2023-24/1136) | 01-11-2023 | 14-11-2023 | 14-11-2023 | 14-11-2023 | 04:30 PM | Active | और देखें |
49. | Purchase of Drill accessories and spares of ICM 260 Drill machine of Chikla Mine.(CH/MECH/23-24/FLM/572/1111 DT 28/10/2023) | 31-10-2023 | 06-11-2023 | 06-11-2023 | 06-11-2023 | 04:30 PM | Active | और देखें |
50. | Major repairing engine of UT2523 Tipper MP50H0968 at Tirodi Mine(MOIL/TD01/MECH/GEN/2023/567) | 31-10-2023 | 07-11-2023 | 07-11-2023 | 07-11-2023 | 03:30 PM | Active | और देखें |
51. | Purchase of QSK23 Cummins Engine Filters for Tata Ex 1200 Hydraulic Excavator of Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2023-24/1100) | 30-10-2023 | 21-11-2023 | 21-11-2023 | 21-11-2023 | 04:30 PM | Active | और देखें |
52. | Purchase of QSK 19C engine spares for BEML 60T Dumpers of Dongri Buzurg Mine.(PUR/MOIL//DB/2023-24/1098) | 30-10-2023 | 15-11-2023 | 15-11-2023 | 15-11-2023 | 04:30 PM | Active | और देखें |
53. | Purchase of Tooth Adopter for Tata Hitachi 1200 Hydraulic Excavator(PUR/MOIL/AGT/DB/2023-24/1102) | 30-10-2023 | 15-11-2023 | 15-11-2023 | 15-11-2023 | 04:30 PM | Active | और देखें |
54. | Purchase of Coolant for Komatsu PC450 Hydraulic Excavator(PUR/MOIL/AGT/DB/2023-24/1101) | 30-10-2023 | 15-11-2023 | 15-11-2023 | 15-11-2023 | 04:30 PM | Active | और देखें |
55. | Rep of interface and control card of siemens drive panel of winder of gumgaon mine(GUM/ELECT/23-24/1958 DT 30/10/2023) | 30-10-2023 | 20-11-2023 | 20-11-2023 | 20-11-2023 | 04:30 PM | Active | और देखें |
56. | Extension of Track laying at 8th level north(MINING/BGT/LT/AGT/2023-24/1255 DT. 30.10.2023) | 30-10-2023 | 09-11-2023 | 09-11-2023 | 09-11-2023 | 04:30 PM | Active | और देखें |
57. | Providing and supplying of outdoor Green Gym equipment for Kesri camp (New 100 Qtr. Colony) at Chikla Mine.(CH/HR/NIT/23-24/1113 Date-28.10.2023) | 30-10-2023 | 08-11-2023 | 08-11-2023 | 08-11-2023 | 04:30 PM | Active | और देखें |
58. | Fabrication of 60 Lbs and 30 Lbs rail crossing (LH and RH) 24 inch Gauge for Underground tramline at Balaghat Mine.(AGT/BGT/Rail-Cross/23-24/1240) | 28-10-2023 | 03-11-2023 | 03-11-2023 | 03-11-2023 | 04:30 PM | Active | और देखें |
59. | Purchase of AVTEC 6610M Transmission filters for BEML make BH60 M dumpers.(PUR/MOIL//DB/2023-24/1099) | 28-10-2023 | 15-11-2023 | 15-11-2023 | 15-11-2023 | 04:30 PM | Active | और देखें |
60. | Renovation and Upgradation Works for Old B type (14 Nos) and C type (05 Nos) Quarters at Chikla Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/51) | 27-10-2023 | 28-11-2023 | 28-11-2023 | 28-11-2023 | 04:00 PM | Active | और देखें |
61. | Construction of Tar and WBM Road and Road side drain, Pipe Culvert and Road Dividers at Chikla Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/54) | 27-10-2023 | 14-12-2023 | 14-12-2023 | 14-12-2023 | 04:00 PM | Active | और देखें |
62. | Repairing of Track roller of BD155 Dozer of Dongri Buzurg Mine(DB/MECH/23-24/ 1071) | 26-10-2023 | 30-10-2023 | 30-10-2023 | 30-10-2023 | 04:30 PM | Active | और देखें |
63. | Purchase of SPARES for 60T BH60M Dumpers (No.1 to No.7) of Dongri Buzurg Mine from Manufacturer/ Authorized Dealer/Supplier.(PUR/MOIL//DB/2023-24/1051) | 26-10-2023 | 15-11-2023 | 15-11-2023 | 17-11-2023 | 04:30 PM | Active | और देखें |
64. | Repairing of Long block of Cummins engine Model 6BT5.9 of Tata Hitachi Ex200 of Hyd Excavator.(DB/MECH/23-24/1049) | 26-10-2023 | 11-11-2023 | 11-11-2023 | 11-11-2023 | 04:30 PM | Active | और देखें |
65. | Refurbishment of 1st Vertical Shaft by replacement of Guide Rails, upright structure at level insets, buntons, keps foundation, and other steel structure of the shaft at Chikla Mine.(MOIL/MOIL LIMITED/CMC/55/23-24/ET/56) | 26-10-2023 | 08-12-2023 | 08-12-2023 | 08-12-2023 | 04:00 PM | Active | और देखें |
66. | Excavation work for C and S plant at 2nd vertical shaft at Ukwa Mine.(AGT/CIVIL/UK/LT/2023-24/1236 DT.26.10.2023) | 26-10-2023 | 02-11-2023 | 02-11-2023 | 02-11-2023 | 04:30 PM | Active | और देखें |
67. | TRANSPORTATION OF BOTTOM ASH FROM NTPC MOUDA TO MUNSAR MINE(MUN/TENDER/23-24/1202) | 25-10-2023 | 31-10-2023 | 31-10-2023 | 31-10-2023 | 04:30 PM | Active | और देखें |
68. | Magnetic Defect Graph Testing of 25 mm FLC type Man winding rope of 1st Vertical Shaft winder of CH.(CH/MECH/23-24/7600028174/1076 Dt. 23/10/2023) | 25-10-2023 | 02-11-2023 | 02-11-2023 | 02-11-2023 | 04:30 PM | Active | और देखें |
69. | Laying of 4 inch and 6 inch GI pipe line in underground at Chikla Mine.(CH/MECH/23-24/7600028151/1075 Dt. 23/10/2023) | 25-10-2023 | 04-11-2023 | 04-11-2023 | 04-11-2023 | 04:30 PM | Active | और देखें |
70. | Purchase of Nut-Bolts and GI Flange for Chikla Mine.(CH/MECH/23-24/FLM/550/1074 Date 23/10/2023) | 25-10-2023 | 31-10-2023 | 31-10-2023 | 31-10-2023 | 04:30 PM | Active | और देखें |
71. | Outsourcing of mechanized loading of spilled ore by deploying Battery Operated Hydraulic Mini Excavator at 16.5th Level underground.(AGT/BGT/MECH/HIRING/23-24/1226) | 24-10-2023 | 10-11-2023 | 10-11-2023 | 10-11-2023 | 04:30 PM | Active | और देखें |
72. | Procurement of NBC/SKF/Timken/FAG/NTN Make bearings for Cone Crusher Unit of Balaghat Mine.(PUR/BGT/Cone-BRG/23-24/1225) | 24-10-2023 | 10-11-2023 | 10-11-2023 | 10-11-2023 | 04:30 PM | Active | और देखें |
73. | Repairing Long block of Cummins 6BT engine of TH200 Hydraulic Excavator under Recon(DB/MECH/23-24/1049) | 23-10-2023 | 31-10-2023 | 31-10-2023 | 31-10-2023 | 04:30 PM | Active | और देखें |
74. | Procurement of FEPL Caplamp Spares for Ukwa Mine (UK/ELECT/2023-24/1210) | 23-10-2023 | 30-10-2023 | 30-10-2023 | 30-10-2023 | 04:30 PM | Active | और देखें |
75. | Plantation of Saplings at Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/1204 Date 20.10.2023) | 23-10-2023 | 30-10-2023 | 30-10-2023 | 30-10-2023 | 04:30 PM | Active | और देखें |
76. | Laying of concrete for parking of vehicles near 6th level at Balaghat Mine(Civil/BGT/LT/AGT/2023-24/1201 Date 20.10.2023) | 23-10-2023 | 30-10-2023 | 30-10-2023 | 30-10-2023 | 04:30 PM | Active | और देखें |
77. | REPAIRING AND REWINDING THE RVT (RESIDUAL VOLTAGE TRANSFORMER) OF FMP OF BALAGHAT MINE(TE/MOIL/FMP/ELECT/23-24/290) | 23-10-2023 | 06-11-2023 | 06-11-2023 | 06-11-2023 | 03:30 PM | Active | और देखें |
78. | Plantation of Saplings at Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/1204 Date- 20.10.2023) | 23-10-2023 | 30-10-2023 | 30-10-2023 | 30-10-2023 | 04:30 PM | Active | और देखें |
79. | Our Sourcing Manpower for the cleaning of Jig tank at OCF Jig(MIN/BGT/LT/AGT/2023-24/1231 Date- 23.10.2023) | 23-10-2023 | 02-11-2023 | 02-11-2023 | 02-11-2023 | 04:30 PM | Active | और देखें |
80. | Repairing of the Transmission assembly including providing of spare parts and overhauling work.(CH/MECH./23-24/566/1050 Date 21.10.2023) | 21-10-2023 | 25-10-2023 | 25-10-2023 | 25-10-2023 | 04:30 PM | Active | और देखें |
81. | Outsourcing of Roof Bolting operation in Gumgaon Mine(Agent/Gum/Min/23-24/1177, date 21/10/2023) | 21-10-2023 | 28-10-2023 | 28-10-2023 | 28-10-2023 | 04:30 PM | Active | और देखें |
82. | Formation of base foundation for installation of chock in underground faces.(Agent/Gum/Min/23-24/1179, date 21/10/2023) | 21-10-2023 | 30-10-2023 | 30-10-2023 | 30-10-2023 | 04:30 PM | Active | और देखें |
83. | Hiring of 30hp Tractor mounted diesel pump with tractor for 06no. pit of Tirodi Mine(MOIL/TD01/MECH/GEN/2023/559) | 21-10-2023 | 26-10-2023 | 26-10-2023 | 26-10-2023 | 03:30 PM | Active | और देखें |
84. | Security Guards watch and ward (without arms) for Sandwik DE-710 Diamond drilling Balaghat Mine(Geo/BGT/LT/AGT/2023-24/1193 Date 18.10.2023) | 20-10-2023 | 26-10-2023 | 26-10-2023 | 26-10-2023 | 04:30 PM | Active | और देखें |
85. | Slab Waterproofing works in Hospital Building at Balaghat Mine(Civil/BGT/LT/AGT/2023-24/1200 Date 20.10.2023) | 20-10-2023 | 30-10-2023 | 30-10-2023 | 30-10-2023 | 05:30 PM | Active | और देखें |
86. | Construction of patient ward on third floor of existing hospital building to be used for community Ophthalmology of S. M. M. Eye Welfare Charitable trust, Nagpur under CSR.(MOIL/MOIL LIMITED/CMC/23-24/ET/52) | 20-10-2023 | 23-11-2023 | 23-11-2023 | 23-11-2023 | 04:00 PM | Active | और देखें |
87. | Providing and Fixing of FRP Doors at W.C. and Bathroom of quarters at Balaghat Mine.(Civil/BGT/LT/AGT/2023-24/1201 Date 20.10.2023) | 20-10-2023 | 30-10-2023 | 30-10-2023 | 30-10-2023 | 04:30 PM | Active | और देखें |
88. | Erection of Earth Pits at Chikla Mine(AGENT/GR-II/ELECT/23-24/1044 DATE 18/10/2023) | 19-10-2023 | 28-10-2023 | 28-10-2023 | 28-10-2023 | 04:30 PM | Active | और देखें |
89. | Procurement of 140mm dia. HDPE plain Pipe for Sand stowing work in underground levels of Balaghat Mine.(PUR/MOIL/BGT/HDPE/23-24/1153) | 19-10-2023 | 22-11-2023 | 22-11-2023 | 22-11-2023 | 04:30 PM | Active | और देखें |
90. | Purchase of Upper Engine Gasket kit for QSK23 Cummins Engine of Dongri Buzurg Mine.(PUR/MOIL//DB/2023-24/2023) | 18-10-2023 | 25-10-2023 | 25-10-2023 | 25-10-2023 | 04:30 PM | Active | और देखें |
91. | REMOVAL OF GARBAGE CLEANING SEPTIC TANK FROM CAMP AREA AT MUNSAR MINE(MUN/HR/NIT/23-24/1732 DT 17/10/2023) | 18-10-2023 | 27-10-2023 | 27-10-2023 | 27-10-2023 | 04:30 PM | Active | और देखें |
92. | Major Repairing Engine of UT2523 Tipper MP50H0967 at Tiordi Mine(MOIL/TD01/MECH/GEN/23/541/1188) | 18-10-2023 | 26-10-2023 | 26-10-2023 | 26-10-2023 | 03:30 PM | Active | और देखें |
93. | Repair of road from A dump to south siding at Tirodi Mine.(TRD/CIVIL/23-24/1128 DATED 10/10/2023) | 18-10-2023 | 25-10-2023 | 25-10-2023 | 25-10-2023 | 04:00 PM | Active | और देखें |
94. | Construction of settling tank for C and S Plant at 2nd vertical Shaft at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/1170 DT.18.10.2023) | 18-10-2023 | 23-10-2023 | 23-10-2023 | 23-10-2023 | 04:30 PM | Active | और देखें |
95. | Providing and fixing of FRP doors in WC and bath to camp quarters at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/1169 DT.18.10.2023) | 18-10-2023 | 23-10-2023 | 23-10-2023 | 23-10-2023 | 04:30 PM | Active | और देखें |
96. | Casting and machining of Jaw Plates of Sample Jaw Crusher at Chikla Mine.(CH/Mech/23-24/7600027654/1004 Dt. 11/10/2023) | 18-10-2023 | 28-10-2023 | 28-10-2023 | 28-10-2023 | 04:30 PM | Active | और देखें |
97. | Fabrication of Head Pulley and Tail Pulley for Conveyor Belts.(CH/Mech/23-24/7600027614/1028 Dt. 15/10/2023) | 18-10-2023 | 30-10-2023 | 30-10-2023 | 30-10-2023 | 04:30 PM | Active | और देखें |
98. | Repair of kachcha road in mine area of Tirodi Mine.(TRD/CIVIL/23-24/1127 DATED 10/10/2023) | 18-10-2023 | 25-10-2023 | 25-10-2023 | 25-10-2023 | 04:00 PM | Active | और देखें |
99. | Supply of Button Bit R25X35 MM for UDM machine for Chikla Mine.(CH/TE/MECH/23-24/4-32478/1032 Dt. 15/10/2023) | 18-10-2023 | 28-10-2023 | 28-10-2023 | 28-10-2023 | 04:30 PM | Active | और देखें |
100. | Cutting and cleaning of grass/ shrubs at camp area and Rest House, Tirodi Mine(TRD/CIVIL/23-24/1129 DATED 10/10/2023) | 18-10-2023 | 25-10-2023 | 25-10-2023 | 25-10-2023 | 04:00 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |