1. | Shifting of 33kV Overhead Line for installation of Solar Panels at Balaghat Mine.(MOIL/TE/Elect/2017-18/6341 Date 26.12.2017) | 29-12-2017 | 18-01-2018 | 18-01-2018 | 18-01-2018 | 04:30 PM | Active | और देखें |
2. | Rate Contract for one year for supply of Compressed Oxygen Gas and Diss. Acetylene Gas Cylinders.(WE-206 e-tender No.MOIL/17-18/ET-403, Dt.29.12.17) | 29-12-2017 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 03:30 PM | Active | और देखें |
3. | Picking, collection and cleaning of 20 percent mineralized ore from ROM Mix dump particles at Beldongri Mine(MOIL/17-18/ET/365) | 29-12-2017 | 30-01-2018 | 30-01-2018 | 30-01-2018 | 03:30 PM | Active | और देखें |
4. | Picking and collection of UKL 471 20 percent SM grade of Mn. Ore from Ch.6800 to 9500 at F W dump area at Ukwa Mine (MOIL/17-18/ET/362) | 28-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 3:30 PM | Active | और देखें |
5. | Picking and collection of material from East side of A dump at Tirodi Mine (MOIL/17-18/ET/364) | 28-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 3:30 PM | Active | और देखें |
6. | Washing picking and collection of material from off the pit area at Tirodi Mine (MOIL/17-18/ET/363) | 28-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 3:30 PM | Active | और देखें |
7. | New bay for 2500KVA 33KV/11KV outdoor transformer at 33KV substation at Balaghat Mine(MOIL/17-18/ET/369) | 22-12-2017 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 03:30 PM | Active | और देखें |
8. | Supply of Timber (Only Through e-procurement)(WE-200 DT.22/12/2017, eTENDER NO.MOIL/17-18/ET/388) | 22-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 03:30 PM | Active | और देखें |
9. | Drilling of 115 mm dia. holes for Opencast development at Dongri Buzurg Mine(MOIL/17-18/ET/374) | 21-12-2017 | 31-01-2018 | 31-01-2018 | 31-01-2018 | 03:30 PM | Active | और देखें |
10. | Cleaning , maintenance, watch and ward and operation pump of Sewage treatment plant Kandri mine(Kan/Civil/NIT/17-18/2813 Date 19/12/2017) | 20-12-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 04:30 PM | Active | और देखें |
11. | WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF LIQUID LEVEL LIMITER (MOBRAY CONTROL)(PUR/MOIL/C-11/7/E-54/930-M Dt. 19-12-2017) | 19-12-2017 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 03:30 PM | Active | और देखें |
12. | Construction of Boundary wall by Precast Pre stressed Concrete Panels at Chikla Mine(MOIL/17-18/ET/361) | 18-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | और देखें |
13. | PURCHASE OF PORTABLE MAGAZINE(PUR/MOIL/C-6/214/E-52/900-M DT.16/12/2017) | 16-12-2017 | 03-01-2018 | 03-01-2018 | 03-01-2018 | 03:30 PM | Active | और देखें |
14. | LED street lighting from Mine office to Wahitola camp colony, Munsar Mine(MOIL/17-18/ET/346) | 16-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | और देखें |
15. | Stability Test along with designing and Preparation of drawing and detailed cost Estimation for modification work required Strengthening of Head Gear structure of Vertical Shaft at Kandri Mine(A-III/KAN/17-18/2748) | 16-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 04:30 PM | Active | और देखें |
16. | Construction of Boundary wall at Goverment school Adarsh Vidalaya Munsar under CSR(MOIL/17-18/ET/360) | 15-12-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | और देखें |
17. | Construction of Classrooms in RNT School Ukwa Under CSR(MOIL/17-18/ET/ 359) | 14-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | और देखें |
18. | Providing, Installing, and Commissioning of Hydraullic power pack with cylinders for Vertical shaft 100 ton Bunker at Ukwa Mine(UK/Mech/17-18/1891 Dated 03/12/2017) | 13-12-2017 | 26-12-2017 | 26-12-2017 | 26-12-2017 | 04:30 pm | Active | और देखें |
19. | Providing and fixing of wooden support (Cleats) for cable laid in underground through vertical shaft at Kandri Mine(MOIL/17-18/ET/349) | 13-12-2017 | 12-01-2018 | 12-01-2018 | 12-01-2018 | 03:30 PM | Active | और देखें |
20. | Monitoring and operation of 33KV substation at Balaghat Mine (MOIL/17-18/ET/347) | 12-12-2017 | 10-01-2017 | 10-01-2017 | 10-01-2017 | 03:30 PM | Active | और देखें |
21. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR VENTRA MAKE 4TON BATTERY OPERATED LOCOMOTIVE. (PUR/MOIL/C-5/58/E-41/896-M Dt. 12/12/2017) | 12-12-2017 | 03-01-2018 | 03-01-2018 | 03-01-2018 | 03:30 PM | Active | और देखें |
22. | Monitoring and operation of 33KV substation at Balaghat Mine(MOIL/17-18/ET/347) | 12-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | और देखें |
23. | Hiring of Front End Loader 1 No. and Tipper (10 MT)- 2 Nos. at Dongri Buzurg Mine(MOIL/17-18/ET/355) | 12-12-2017 | 11-01-2018 | 11-01-2018 | 11-01-2018 | 03:30 PM | Active | और देखें |
24. | Collecting and removing of Ash from Boiler house to ash dump area at EMD plant, Dongri Buzurg Mine(MOIL/17-18/ET/350) | 11-12-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | और देखें |
25. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR WIPRO MAKE HYDRAULIC SYSTEM FOR ASHOK LEYLAND TIPPER.(PUR/MOIL/C-5/23/E-48/835-M Dt. 11/12/2017) | 11-12-2017 | 03-01-2018 | 03-01-2018 | 03-01-2018 | 03:30 PM | Active | और देखें |
26. | Monitoring of Environment Parameters at MOIL Mines Plants AND Sand Lease under Water Act 1974 AND Air Act 1981 and Noise Survey(MOIL/17-18/ET/344) | 11-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | और देखें |
27. | Underground Drivage for Electrical Sub-station at 13.5 Ft. L at Balaghat Mine(MOIL/17-18/ET/354) | 11-12-2017 | 11-01-2018 | 11-01-2018 | 11-01-2018 | 03:30 PM | Active | और देखें |
28. | Repairing and servicing of Actuators of Butterfly Valve of IMB Plant at Balaghat Mine(AGT/BGT/MECH/IMB/17-18/451 DTD 07.12.2017) | 09-12-2017 | 19-12-2017 | 19-12-2017 | 19-12-2017 | 04:30 PM | Active | और देखें |
29. | Replacement of CT and PT metering unit and associated work for HT Service connection of Kandri Mine( MOIL/17-18/ET/351) | 09-12-2017 | 26-12-2017 | 26-12-2017 | 26-12-2017 | 03:30 PM | Active | और देखें |
30. | Maintenance, Distribution and Collection of Cap Lamps at Kandri Mine(MOIL/17-18/ET/345) | 09-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | और देखें |
31. | Drilling 57mm diameter holes a premining support for installing cable bolt in Mangeneferrous rock in between CH-15 to CH-7 of 12 L North at Balaghat Mine(AGT/BGT/MECH/CB/17-18/450 dtd 07.12.2017) | 08-12-2017 | 14-12-2017 | 14-12-2017 | 14-12-2017 | 04:30 PM | Active | और देखें |
32. | Underground Development at -350 Level at Kandri Mine(MOIL/17-18/ET/353) | 08-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | और देखें |
33. | Consultancy Services for Preparation Of Design, Drawings and Detail Estimate for construction Of Material Handling Systems and Crushing and Screening Plants etc. at Chikla and Kandri Mine(MOIL/17-18/ET/352) | 08-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | और देखें |
34. | Picking and Collection of Mn. Ore from 6 no. Old Dump at SitaPatore Mine(SS/MINE/HO/2017-18/2411) | 07-12-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | और देखें |
35. | Hiring of Architect for rendering Architectural and Design Engineering Services for Proposed Construction of Residences for Directors Sr Executives at West Court Compound , Nagpur(MOIL/17-18/ET/ 341) | 06-12-2017 | 22-12-2017 | 22-12-2017 | 22-12-2017 | 03:30 PM | Active | और देखें |
36. | purchase of Video Conferencing solution - 1 No. (4 Lots) (Only Through e-procurement)(WE-201 DT.04/12/2017, eTENDER NO.MOIL/17-18/ET/357) | 04-12-2017 | 02-01-2018 | 02-01-2018 | 02-01-2018 | 03:30 PM | Active | और देखें |
37. | Purchase of Jumbo Bags-12,600 Nos(WE-203 e-tender No.MOIL/17-18/ET-356, Dt.04.12.17) | 04-12-2017 | 05-01-2018 | 05-01-2018 | 05-01-2018 | 03:30 PM | Active | और देखें |
38. | Removal of spillage from the bottom of conveyor belt of 14.5 level Loading station Production Shaft(BGT/MECH/Spillage/17-18/5657) | 02-12-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 5:00 PM | Active | और देखें |
39. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR VIBRATORY CUP MILL.(PUR/MOIL/C-11/44/E-51/873-M Dt. 30-11-2017) | 30-11-2017 | 22-12-2017 | 22-12-2017 | 22-12-2017 | 03:30 PM | Active | और देखें |
40. | Maintenance OF Garden at Tirodi Mine( TRD/CIVIL/2017-18/2255) | 28-11-2017 | 05-12-2017 | 05-12-2017 | 05-12-2017 | 03:30 PM | Active | और देखें |
41. | Construction of OCF Shed and office at Dongri Buzurg Mine(MOIL/17-18/ET/274) | 28-11-2017 | 22-12-2017 | 22-12-2017 | 22-12-2017 | 03:30 PM | Active | और देखें |
42. | Renovation of sample room at Dongri Buzurg Mine(MOIL/17-18/ET/269) | 28-11-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | और देखें |
43. | Construction of stone masonry for making drain and retaining wall for nallah from railway crossing to IMB plant at Dongri Buzurg Mine(MOIL/17-18/ET/275) | 28-11-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | और देखें |
44. | Construction of Cement Concrete road with retaining wall from administrative building to Pit office at Munsar Mine(MOIL/17-18/ET/271) | 28-11-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | और देखें |
45. | Construction of Shed beside Rest Shelter of Siding of Balaghat Mine(Civil/BGT/T.E./2017-18/5699) | 27-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 04:30 PM | Active | और देखें |
46. | Construction of Panel room 5 nos at Munsar Mine(MOIL/17-18/ET/273) | 27-11-2017 | 27-12-2017 | 27-12-2017 | 27-12-2017 | 03:30 PM | Active | और देखें |
47. | Repair for Camp Residential Quarters of Balaghat Mine(Civil/BGT/T.E./2017-18/5538) | 23-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 04:30 PM | Active | और देखें |
48. | Major repairs/overhauling Leyland Engine AL 411 of JCB loader No 3 operating at Balaghat Mine(AGT/BGT/MECH/LMV/17-18/427 dtd 23.11.2017) | 23-11-2017 | 01-12-2017 | 01-12-2017 | 01-12-2017 | 04:30 PM | Active | और देखें |
49. | Shotcrete work for retaining structure for Mobile Crushing plant at Munsar Mine(CIVIL/MUN/17-18/55 DT. 21.11.2017) | 22-11-2017 | 01-12-2017 | 01-12-2017 | 01-12-2017 | 04:30 PM | Active | और देखें |
50. | Desilting of Silts accumulated around Jack Well towards smoothening water supply at Balaghat(Civil/BGT/T.E./2017-18/5571) | 21-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
51. | Provision of regenerative control system for 4T capacity Battery Locomotive of Balaghat Mine(MOIL/17-18/ET/335) | 21-11-2017 | 30-12-2017 | 30-12-2017 | 30-12-2017 | 03:30 PM | Active | और देखें |
52. | Providing and fixing of Pumping machineries, gs flarring unit,aeration work of STP at Munsar Mine(CIVIL/MUN/17-18/50 DT. 19.11.2017) | 20-11-2017 | 29-11-2017 | 29-11-2017 | 29-11-2017 | 04:30 PM | Active | और देखें |
53. | Provision of audio communication between employees riding in Cage and Master Banksman at Men winder of Balaghat Mine(MOIL/17-18/ET/334) | 20-11-2017 | 20-12-2017 | 20-12-2017 | 20-12-2017 | 03:30 PM | Active | और देखें |
54. | Pattern making, casting,Machining and dynamic balancing of Pumps Spares for 150 HP Maxflow make Mutti stage Pump (Float) of 8th Level Underground of Balaghat Mine(AGT/BGT/MECH/PUMP/17-18/412 DTD 16.11.2017) | 18-11-2017 | 28-11-2017 | 28-11-2017 | 28-11-2017 | 04:30 PM | Active | और देखें |
55. | Fabrication of drive and Driven gear set for vibratory Assembly at IMB Plant Balaghat Mine(AGT/BGT/MECH/IMB/17-18/411 dtd 16.11.2017) | 18-11-2017 | 28-11-2017 | 28-11-2017 | 28-11-2017 | 04:30 PM | Active | और देखें |
56. | PURCHASE OF MS OFFICE STD.2016 and MS VISUAL STUDIO PROFESSIONAL SOFTWARE | 18-11-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 3:30 PM | Active | और देखें |
57. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ATLAS COPCO MAKE ROCK BREAKER MODEL- MB -1500.( PUR/MOIL/C-5/23/E-49/841-M Dt. 18/11/2017) | 18-11-2017 | 11-12-2017 | 11-12-2017 | 11-12-2017 | 03:30 PM | Active | और देखें |
58. | Supplying, providing, erection, installation and commissioning of L.T. 3 phase, 5 wires LT Overhead line, from Balapur camp to Mine Magazine of Dongri Buzurg Mine(MOIL/17-18/ET/333) | 18-11-2017 | 18-12-2017 | 18-12-2017 | 18-12-2017 | 03:30 PM | Active | और देखें |
59. | Purchase of Track rollers of EIMCO Elecon make SDL At Gumgaon Mine(GUM/17-18 /349 Dt-15.11.2017) | 17-11-2017 | 24-11-2017 | 24-11-2017 | 24-11-2017 | 03:30 PM | Active | और देखें |
60. | Repairing of Roof at Existing Post Office Building in Side syndicate bank at Tirodi Mine(TRD/CIVIL /L/2017-18/2218-A) | 17-11-2017 | 22-11-2017 | 22-11-2017 | 22-11-2017 | 03:30 PM | Active | और देखें |
61. | Collecting Caneen Food Item drinks and carrying it on head load for serving it to Mine employee at Tirodi Mine(TRD/Civil/L/2017-18/2195-B) | 17-11-2017 | 22-11-2017 | 22-11-2017 | 22-11-2017 | 03:30 PM | Active | और देखें |
62. | PRINTING OF DIARY FOR THE YEAR 2018(WE-106 e-tender No.MOIL/17-18/ET-340, Dt.17.11.17) | 17-11-2017 | 29-11-2017 | 29-11-2017 | 29-11-2017 | 03:30 PM | Active | और देखें |
63. | Maintenance of Gardens at Ukwa Mine.(16/Civil/UM/17-18/1765) | 17-11-2017 | 02-12-2017 | 02-12-2017 | 02-12-2017 | 04:30 PM | Active | और देखें |
64. | Purchase of Steel Braided Rubber Hose.(WE-50 e-tender No.MOIL/17-18/ET-339, Dt.17.11.17) | 17-11-2017 | 19-12-2017 | 19-12-2017 | 19-12-2017 | 03:30 PM | Active | और देखें |
65. | Muffling for Blasting at 6 A 6 B and 6 C section of North at Tirodi Mine(MOIL/17-18/ET/332) | 16-11-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | और देखें |
66. | Hiring of Front End Loader and Tipper at Dongri Buzurg Mine(MOIL/17-18/ET/331) | 15-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
67. | Repair of roof slab of old ESR behind Mine Hospital at Chikla Mine.(TE/CH/CIVIL/17-18/3243 dated 06/11/2017) | 15-11-2017 | 28-11-2017 | 28-11-2017 | 28-11-2017 | 03:30 PM | Active | और देखें |
68. | Concreting work for chamber Prepration at 1750 level Ukwa Mine.(16/Mining/UM/17-18/1740) | 15-11-2017 | 02-12-2017 | 02-12-2017 | 02-12-2017 | 04:30 PM | Active | और देखें |
69. | Sinking 14 in Bore Hole with MS Casing of 8 in Dia and associated works at Gumgaon Mine.(MOIL/17-18/ET/328) | 15-11-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | और देखें |
70. | Construction of 15 No Bath room and Toilets for Residential Quarters at Tirodi Mine(MOIL/17-18/ET/326) | 15-11-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | और देखें |
71. | Transportation of sand from Bawanthadi River lease to Chikla Mine and Kanhan River lease to Gumgaon Mine(MOIL/17-18/ET/321) | 15-11-2017 | 13-12-2017 | 13-12-2017 | 13-12-2017 | 03:30 PM | Active | और देखें |
72. | Construction of Boundary wall for administrative building premises and along the approach at Sitapatore Mine(MOIL/17-18/ET/327) | 15-11-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | और देखें |
73. | Renovation and mass renovation works for Awlajhari, Tavejhari and Bodha Pumping Station towards Water Supply Scheme at Balaghat Mine(MOIL/17-18/ET/298) | 14-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
74. | Development and beautification of New Colony Garden, Balaghat Mine.(MOIL/17-18/ET/296) | 14-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
75. | Purchase of PEARL COKE with Transportation - 3360 MT(WE-80 e-tender No.MOIL/17-18/ET-338, Dt.14.11.17) | 14-11-2017 | 05-12-2017 | 05-12-2017 | 05-12-2017 | 03:30 PM | Active | और देखें |
76. | Construction of Medical Administrative Building at Nagpur(MOIL/17-18/ET/ 323) | 14-11-2017 | 14-12-2017 | 14-12-2017 | 14-12-2017 | 03:30 PM | Active | और देखें |
77. | Transportation of sand from Kalaphata Ghat to Kandri, Munsar and Beldongri Mine(MOIL/17-18/ET/329) | 14-11-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | और देखें |
78. | Supplying Providing Fixing of Electronic Boom barrier at Entry point of Kandri Mines(Agent-MH/TENDER/17-18/2353) | 13-11-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 04:30 PM | Active | और देखें |
79. | Purchase of Oil and Lubricants - 29 items (Only Through e-procurement)(WE-60 DT.13/11/2017 (MOIL/17-18/ET/336-337) | 13-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | और देखें |
80. | PURCHASE OF STEEL WIRE ROPE-USHA MARTIN MAKE(PUR/MOIL/C-3/23/E-47/781-M DT.10.11.2017) | 10-11-2017 | 24-11-2017 | 24-11-2017 | 24-11-2017 | 03:30 PM | Active | और देखें |
81. | Picking and collection of material from contaminated low grade ROM at South West Part-3 of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/325) | 10-11-2017 | 20-11-2017 | 20-11-2017 | 20-11-2017 | 03:30 PM | Active | और देखें |
82. | Picking and collection of material from contaminated low grade ROM at South West Part-2 side of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/324) | 10-11-2017 | 20-11-2017 | 20-11-2017 | 20-11-2017 | 03:30 PM | Active | और देखें |
83. | Purchase of Cross Bit, 57mm dia suitable for ATLAS COPCO Make Cable Bolting Machine.(WE-105 e-tender No.MOIL/17-18/ET-330, Dt.10.11.17) | 10-11-2017 | 11-12-2017 | 11-12-2017 | 11-12-2017 | 03:30 PM | Active | और देखें |
84. | Shifting of 3 phase 3 wire existing 11 KV HT overhead line from CH no 49 MRL 345 CH no 49, MRL 353 CH no 52, MRL 356 to CH no 49,MRL 345 CH no 53, MRL 348-CH no 52, MRL 356 at Dongri Buzurg Mine(MOIL/17-18/ET/313) | 10-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | और देखें |
85. | Erection of 11KV HT Overhead line from Chikla B New substation to Gadhaghat Substation (2nd Vertical Shaft) of Chikla Mine(MOIL/17-18/ET/314) | 10-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | और देखें |
86. | Erection of new 11KV HT Overhead line from 50-52 substation to south bed mine substation at Tirodi Mine(MOIL/17-18/ET/315) | 10-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | और देखें |
87. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR 3 TON AND 4 TON BATTERY-DIESEL LOCO FROM OVIS EQUIPMENTS PVT. LTD., HYDERABAD(PUR/MOIL/C-5/27/E-08/267-M Dt. 08/11/2017) | 08-11-2017 | 29-11-2017 | 29-11-2017 | 29-11-2017 | 03:30 PM | Active | और देखें |
88. | Automation of underground Pumping Operation at Chikla Mine(MOIL/17-18/ET/288) | 08-11-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 03:30 PM | Active | और देखें |
89. | Loading and transportation of Mill tailing from Malajkhand Mine of M/s Hindustan Copper Limited to Ukwa Mine for stowing(MOIL/17-18/ET/295) | 08-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | और देखें |
90. | Picking and collection of material from contaminated low grade ROM at South West Part-I of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/319) | 07-11-2017 | 16-11-2017 | 16-11-2017 | 16-11-2017 | 03:30 PM | Active | और देखें |
91. | Picking and collection of material from contaminated low grade ROM at South Part of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/320) | 07-11-2017 | 16-11-2017 | 16-11-2017 | 16-11-2017 | 03:30 PM | Active | और देखें |
92. | Screening sorting and stacking of jigged ferro manganese metal Ferro Manganese Plant Balaghat Mine(BGT/FM/TE/2017-18/338 Date 06.11.2017) | 07-11-2017 | 22-11-2017 | 22-11-2017 | 22-11-2017 | 04:30 PM | Active | और देखें |
93. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR RD-60 DRILL MACHINE AND RD-395 WATER PUMP(PUR/MOIL/C-5/28/E-10/293-M Dt. 07/11/2017) | 07-11-2017 | 11-12-2017 | 11-12-2017 | 11-12-2017 | 03:30 PM | Active | और देखें |
94. | Sinking of Winzes (Manually) from 70ft Level to 30ft Level at Munsar Mine(MOIL/17-18/ET/301) | 07-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | और देखें |
95. | Pushing and unloading of tubs in underground and on surface at vertical shaft section at Ukwa Mine(MOIL/17-18/ET/297) | 07-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | और देखें |
96. | Extra excavation in Manganiferous rock at 5th Level (Western side of -470 ft L) of vertical section at Chikla Mine(MOIL/17-18/ET/299) | 07-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | और देखें |
97. | PURCHASE OF INDUSTRIAL SAFETY SHOES AND PVC HALF GUM BOOT(PUR/MOIL/C-11/109/E-45/772-M Dt. 06-11-2017) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
98. | PURCHASE OF HYDRATED LIME POWDER-15MT(PUR/MOIL/C-11/34/E-46/774-M Dt. 06-11-2017) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
99. | Annual Rate Contract for supply of Cement Capsules - 430397 Nos.((WE-104 dt.06.11.2017(e-Tender No.MOIL/17-18/ET/322) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
100. | 11KV Overhead line for Chikla B new substation at Chikla Mine(MOIL/17-18/ET/289) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |